Baita Plai Q1 Production Report & Update, Tajikistan Update And Settlement Update


(MENAFN- GlobeNewsWire - Nasdaq)

Vast Resources plc / Ticker: VAST / Index: AIM / Sector: Mining

12 April 2023

Vast Resources plc
('Vast' or the 'Company')

Baita Plai Q 1 Production Report and Update
Tajikistan Update
Settlement Update

Vast Resources plc, the AIM-listed mining company, is pleased to announce updates on Baita Plai Polymetallic Mine ('Baita Plai') (including the Q1 production report), on the Takob mine in Tajikistan, and on the settlement of the historic claim in Zimbabwe.

Highlights:

  • Baita Plai
    • Tonnes mined in Q1 increased by 20% despite January and February being short months of production.
    • Positive results from new drilling campaign indicate extension of the skarn at depth.
  • Tajikistan
    • Commercial production of CaF2 has exceeded the minimum target thus fulfilling Takob contract performance condition.
    • Pb/Zn commercial production at target grade has commenced. First commercial quantities are targeted for shipment in May. As announced on 3 May 2022 Vast will receive a participation equivalent to a 12.25 percent royalty overall sales of non-ferrous concentrate and any other metals produced from the Takob Processing Project.
  • Zimbabwe
    • Closure of the settlement process in Zimbabwe expected towards the end of April or first half of May.

Bai t a Plai Production :

Production continued during the New Year period with minimal down time at the mine as the mine management and staff target reaching operational breakeven, and, by June 2023, name plate capacity of 14,000 tonnes per month.

Lower grades in the mine were encountered in March, partly as a result of intense development work in Level 17 and Level 18, and partly because of restriction of access to higher grade ore caused – following the new drilling results (see below) – by the development of the incline into the lower levels and preparation for drilling in Level 19. Had that not occurred, the Company is confident the mine could have reached operational breakeven in March.

Below are the production results for Q1 2023 together with comparisons for previous quarters. The reduction in concentrates sold is due to timing differences.

Quarterly Report Tons Mined Conc Produced Conc Produced Conc Sold Conc Sold Avg.Conc Grade Cu conc Inventory at end of Quarter
WMT DMT WMT DMT DMT
Q1 2022 12,561 257 229 263 234 19% 6
Q2 2022 13,020 295 268 201 183 22% 91
Q3 2022 15,673 340 309 154 140 17% 260
Q4 2022 17,343 498 453 546 488 23% 225
Q1 2023 20,728 539 475 516 459 23% 241

Baita Plai Drilling:

The first two drill holes of the new underground drilling programme contained in the technical report as announced on 27 February 2023 ('Technical Report') have been completed.

The author of the Technical Report has confirmed that:

“Based on the data collected from the first two drilled holes, the extension of the skarn is confirmed.

The drill holes were from 45m below Level 18 and were of 136m and 94m. Both holes indicated mineralisation at depth. The ore that is being currently mined at Level 18 (45m), sub level 2, was identified in both drillholes with a thickness of 2.3m and 3m and another new layer has been identified with a thickness of 2m at further depth of 20m.”

This is consistent with achievement of the Exploration Targets as published on 27 February 2023.

A technical update on the drilling campaign will be published later this month.

Tajikistan :

Steady state production of a 95% minimum fluorite (CaF2) concentrate has been achieved at the Takob mine in Tajikistan thus achieving satisfaction of a major performance condition of the contract with Korkhanai Boygardonii Takob.

Commercial production of a Pb and Zn concentrate with precious metal credits has now commenced and to date the Pb and Zn bulk concentrate quality has exceeded expectations. The Company together with our partners are preparing for the first commercial shipment in May to our strategic offtake partners Trafigura as per announcement dated 6 October 2022.

We look forward to advising the market with this milestone event.

Zimbabwe :

Further to the announcement of 31 March 2023, the Company has received a further communication from Government representatives, via our legal advisors, that indicates that the matter is expected to be finalised during the course of this month or in any event not later than the first half of May 2023.

Andrew Prelea, Chief Executive Officer at Vast Resources PLC, commented:

“Q1 production has seen a significant increase both in mining and in concentrate production as a result of the changes that have been implemented on site during H2 of 2022 and the ongoing upgrades and further development underground.

“Management strongly believes in Baita Plai's increasing performance and our ability to reach the goal of name plate capacity in H1 2023. We expect to see the increased production trend continue throughout 2023.

“The new drilling programme at Baita Plai is already proving to show that the Technical Report published on 27 February 2023 is indicative of what the mine is capable of producing in terms of grade and ore tonnage. As stated, there is positive indication that the ore continues at depth and giving further scope for increasing the current resources.

“Tajikistan is now producing commercial quality and quantity of both CaF2 and Pb/Zn concentrates and the Company is looking forward to updating the market once the first sales have been finalised.

“Due to the sensitive nature of the process the settlement in Zimbabwe has taken longer than the market has anticipated. However the settlement is following the path of consensual due process and we appreciate the Government's continuing assistance in bringing this matter to a close.”

Important Notices
This announcement contains 'forward-looking statements' concerning the Company that are subject to risks and uncertainties. Generally, the words 'will', 'may', 'should', 'continue', 'believes', 'targets', 'plans', 'expects', 'aims', 'intends', 'anticipates' or similar expressions or negatives thereof identify forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and uncertainties relate to factors that are beyond the Company's ability to control or estimate precisely. The Company cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this announcement. The Company does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein, whether as a result of new information, future events or otherwise, except to the extent legally required.

**ENDS**

MENAFN12042023004107003653ID1105988447


GlobeNewsWire - Nasdaq

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.