Ximen Mining Corp: Brett Epithermal Gold Project Drilling Hole 5


(MENAFN- Newsfile Corp) Vancouver, British Columbia--(Newsfile Corp. - October 28, 2024) - Ximen mining Corp . (TSXV: XIM) (FSE: 1XM) (OTC: XXMMF) (the "Company" or "Ximen") announces the completion of the 5th hole of its on-going drill program at the Brett epithermal Gold project near Vernon in southern BC.


Ximen Mining Corp: Brett Epithermal <a target="_blank" href="https://menafn.com/MenaGoogleSearch.aspx?cx=partner-pub-1786942026589567%3Asao396-3ere&cof=FORID%3A10&ie=ISO-8859-1&q=gold&sa=Search#1141" class ="search_links_in_body">gold</a> Project <a target="_blank" href="https://menafn.com/MenaGoogleSearch.aspx?cx=partner-pub-1786942026589567%3Asao396-3ere&cof=FORID%3A10&ie=ISO-8859-1&q=drilling&sa=Search#1141" class ="search_links_in_body">drilling</a> Hole 5 Image

Drill at hole B24-05
To view an enhanced version of this graphic, please visit:

Hole B24-05 was drilled at 45 degrees inclination to the northeast to test the Border Zone, an alteration zone situated west of the Main Zone, and to test 40 meters southeast of an intercept of 16.7 g/t Au from hole 14-13 between 176.0 and 177.5 meters. (see Figure 1).


Ximen Mining Corp: Brett Epithermal Gold Project Drilling Hole 5 Image

Figure 1. Plan view of hole B24-05 (left) and cross-section (right). Hole was drilled to test for an extension from an intercept of 16.7 g/t Au in hole 14-13.
To view an enhanced version of this graphic, please visit:

B24-05 intersected multiple altered and mineralized zones and three porphyry dikes. The first 15 meters consisted of weathered and argillic altered volcanic rock. From 18.0-24.63 a sulphide zone was intersected that consists of pyrite veinlets and / or replacement of volcanic breccia matrix, with fine quartz veinlets. Total sulphide content for the interval is 5-10%. Five clay-pyrite mineralized zones were intersected at 31.27-34.30 (3.03m), 51.15-60.42 (9.27m), 149.60-150.76 (1.16m), 216.38-219.49 (3.11m), 231.07-232.81 (1.74m). Pyrite content in these zones ranges between 2 and 10%. The volcanic rocks are silicified adjacent to and between the zones at 213.2 and 231.07 meters with up to 1% disseminated pyrite. A quartz vein breccia was intersected between 154.0 and 154.2 meters that contains 1-3% pyrite. Porphyry dikes were intersected at 86.23-92.60, 232.81-238.79 and 252.28-258.65 meters. The dike at 232.81 meters is moderately clay and silica altered.

The initial sulphide zone intersected in hole B24-05 and the altered intervals at 31.27 and 51.15 meters correlate with the West Zone. The Border zone, which contains the 16.7 g/t intercept in hole 14-13, correlates with the alteration at 149.60-150.6m or possibly the quartz breccia at 154.0m. The Main Zone correlates with the alteration intersected at 216.38 and possibly the zone at 231.07m. The porphyry dike intersected at 232.81 correlates with the dike associated with the Main Zone.

The Brett project (20,043 hectares) covers low-sulfidation epithermal-style gold mineralization hosted in Eocene Penticton Group volcanic rocks. Epithermal-style gold mineralization was discovered in 1983, and a 291 tonne surface bulk sample was shipped to the smelter at Trail, BC in the 1990's that averaged 27.74 grams per tonne gold and 63.7 grams per tonne silver (Brett 2017 NI 43-101 report). Multiple zones of mineralization occur over a two kilometer strike, including both bulk-mineable and bonanza high grade styles. Ximen conducted LiDAR and airborne magnetic surveys over parts of the Brett property in 2022. Interpretation, 3D modeling, and target refinement were then completed in preparation for the 2024 drilling program.

The overall objective of the drill program is to extend the Main Zone to the southeast and at depth, and to test altered zones that border and parallel the Main Zone.


Ximen Mining Corp: Brett Epithermal Gold Project Drilling Hole 5 Image

Map of Mineralized Zones at the Brett Project
To view an enhanced version of this graphic, please visit:

Readers are cautioned that historical records referred to in this News Release have been examined but not verified by a Qualified Person. Further work is required to verify that historical records referred to in this News Release are accurate.

Dr. Mathew Ball, P.Geo., VP Exploration for Ximen Mining Corp. and a Qualified Person as defined by NI 43-101, approved the technical information contained in this News Release.

On behalf of the Board of Directors,

"Christopher R. Anderson"

MENAFN28102024004218003983ID1108824746


Newsfile Corp

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.