(MENAFN- Trend News Agency)
BAKU, Azerbaijan, June 30. The criminal case
has been initiated under the relevant articles of Azerbaijan's
Criminal Code as a result of operational-search activities carried
out on the basis of information related to the illegal actions of
the Head of the Architecture and Construction Department of the
Office of the Head of the Sabirabad District Executive Power
Mushvig Gasimov, the General Prosecutor's Office of the Republic of
Azerbaijan told Trend .
The investigative measures established that Mushvig Gasimov in
conjunction with Chief Consultant of the State Construction
Inspectorate on specific objects of the national importance of the
State Agency for Control over Construction Safety at Azerbaijan's
Ministry of Emergency Situations Eldar Guliyev and others, received
bribes for granting permission to conduct construction activities
on non-residential facilities in Sabirabad district.
Based on the evidence collected, Mushvig Gasimov and Eldar
Guliyev have been indicted under Articles 311.3.1 and 311.3.3
(large-scale bribery by a group of persons with prior agreement) of
the Criminal Code. Moreover, the preventive measure in the form of
arrest has been chosen against them.
The criminal investigation is currently underway.
MENAFN30062022000187011040ID1104460974
Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.