Arrow Announces Fifth Ubaque Horizontal Well Results
| CNB HZ-5 | Gross 1,000 BOPD | Net 500 BOPD | Water Cut 52% |
| CNB HZ-4 | Gross 1,110 BOPD | Net 555 BOPD | Water Cut 52% |
| CNB HZ-3 | Gross 1,090 BOPD | Net 545 BOPD | Water Cut 71% |
| CNB HZ-1 | Gross 1,160 BOPD | Net 580 BOPD | Water Cut 70% |
This performance demonstrates how AICDs are suppressing water production to the benefit of oil production.
CNB HZ-7 and Upcoming Drilling
The Petroworks rig has been moved to the seventh cellar on the Carrizales Norte B Pad where the Company spud the sixth horizontal well (CNB HZ-7) on October 22, 2024. Once the CNB HZ-7 well is complete, the Company will move the rig to drill the Alberta Llanos prospect (formerly known as Baquiano-1), which is on trend with the Carrizales Norte field. The Company plans to utilize two drilling rigs in 2025 to develop the Alberta Llanos prospect and drill development wells at the RCE and CN fields. Also in 2025, the Mateguafa Oeste, Mateguafa Attic and Capullo prospects will be drilled.
Corporate Update
Current net corporate production is over 5,305 BOE/D, inclusive of CNB HZ-6.
Arrow's cash position exceeded $18 million on November 1, 2024. Arrow has maintained a healthy balance sheet with no debt.
Marshall Abbott, CEO of Arrow Exploration Corp., commented:
"The initial production results from CNB HZ-6 are very encouraging and follow the positive trend of horizontal wells at the CNB pad continuing to surpass expectations. Arrow's focus for the remainder of 2024 will be the completion of the sixth horizontal well in our program, CNB HZ-7 at Carrizales Norte, after which we will move to drill a low-risk exploration well at the Alberta Llanos prospect."
"We are also pleased to announce that our water disposal facilities at the CNB pad began operations in early November which will significantly increase our ability to safely dispose of water and in turn reduce bottlenecks to future production and the need for trucking. The water infrastructure will also allow us to increase production at the RCE and CN pads. After completing the six well drilling program at Carrizales Norte we also expect to increase pump speed on the horizontal wells."
"The planning of our capital program for 2025 is well underway with development of roads, pads and other civil works in the Tapir block. The 2025 program will consist of drilling of low-risk exploration wells at Mateguafa Oeste, Capullo, and Mateguafa Attic. In 2025, the Company is also targeting further horizontal Ubaque and vertical C7 development drilling at Rio Cravo Este, Carrizales Norte, and Alberta Llanos. Current plans are to utilize two drilling rigs in 2025 to accelerate development on the Tapir block."
"Our use of superior technologies in drilling, completions and production ensures maximum profitability at lowest cost. In particular, the advanced sensory technology used directly behind the drill bit ensures horizontal wells stay in "zone" for the length of the horizontal lateral. In addition, AICDs automatically reduce water cut and allow for prolonged and increased oil production. These innovations allow Arrow to be one of the lowest cost operators onshore Colombia, resulting in superior payouts which provide a future foundation for growth."
"I would like to thank our talented team and their dedication to Arrow's success. We look forward to updating stakeholders with the near-term completion news at CNB HZ-7 and further updates as we continue our extensive work program in Colombia."
For further Information, contact:
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment