Feasibility Study Deadline Of Green Corridor Project From Azerbaijan To Europe Set


(MENAFN- Trend News Agency) TBILISI, Georgia, May 2. The feasibilityassessment for the "green corridor" project, which comprisesrunning a cable under the Black Sea from Azerbaijan to Europe, isplanned to be finished in July 2024, World Bank Regional Directorfor the South Caucasus Rolande Pryce said, Trend reports.

Pryce said this during an "Enhancing Connectivity: EuropeanConnectivity (Renewable Energy and Digital Connectivity) MiddleCorridor (Reshaping Euro-Asia Connectivity)" panel discussion atthe 57th ADB Annual Meeting in Tbilisi.

Will be updated

MENAFN02052024000187011040ID1108164982


Trend News Agency

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.