RTA Completes Internal Roads And Lighting Works In 5 Al Qusais's Industrial Areas


(MENAFN- Dubai PR Network) Al Tayer: The Project increased road capacity by 200%

Dubai. Roads and transport Authority. 26th May 2024:
Dubai's Roads and Transport Authority (RTA) has finished extensive improvements on the internal roads and lighting in Al Qusais Industrial areas 1, 2, 3, 4, and 5. The project included constructing 32 roads covering 10 kilometers and installing streetlights along 43,000 meters. As a result, the road capacity has now tripled from 500 to 1,500 vehicles per hour in both directions, representing a significant increase of 200%.

His Excellency Mattar Al Tayer, Director General, Chairman of the Board of Executive Directors of the Roads and Transport Authority, commented,“This internal roads project aligns with the directives of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, and the instructions of His Highness Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai and Chairman of the Executive Council. These directives call for upgrading the infrastructure of residential and industrial areas to support the growing population and urbanisation in the emirate, foster well-being, and promote happiness.

'The internal roads project in Al Qusais Industrial areas 1, 2, 3, 4, and 5 has enhanced connectivity with four main streets: Amman Street, Beirut Street, Aleppo Street, and Damascus Street. It has also improved access and exit points to over 320 workshops, 25 residential buildings, shops, and educational facilities, benefiting an estimated 60,000 residents in the area.'

Completed Projects

RTA has recently completed internal road and streetlighting projects in four residential areas:
Margham, Lahbab, Al Lisaili, and Hatta, covering 35 km. Additional Road works are underway in Lahbab and Al Lisaili to meet the residents' needs.

Margham

In Margham, road works have been completed, extending 5 km along the Dubai-Al Ain Road near Skydive Dubai to serve about 1,100 residents. Lahbab has also seen road improvements over 4 km and streetlighting improvements along Dubai-Hatta Road near Lahbab Camel Racing Track, benefiting more than 3,000 residents. The project aims to connect the residential community under development with the road network.

Al Lisaili

In Al Lisaili, around 7 km of road improvements have been completed. Lighting works have also been done on the existing roads in the Seih Al Salam near the Last Exit and Al Qudra Lakes, covering over 7 km. These enhancements benefit approximately 2,900 residents and improve the accessibility of the area's entrances and exits.


Hatta

In Hatta, the Suhaila area has undergone significant improvements, including extending a 2 km road, enhancing infrastructure such as constructing a rainwater drainage network and installing street lighting. This project benefits approximately 6,000 residents, improves access to and from the area, and enhances connectivity between the residential area and the road network.


Captions:

  • Mattar Al Tayer
  • Completed roads contributed to the smooth traffic flow
  • Layout of road paving scheme in Al Qusais Industrial Area.


MENAFN27052024003092003082ID1108260029


Dubai PR Network

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.