Tuesday, 02 January 2024 12:17 GMT

Bp Unveils Timeline Of Launching Production From New Oil Ring In Azerbaijan


(MENAFN- Trend News Agency) BAKU, Azerbaijan, June 2. Production from a new oil ring at the bottom of the Azeri-Chirag-Gunashli (ACG) deep fields will begin in September, bp's Regional President for Azerbaijan, Georgia, and Türkiye, Gio Cristofoli, told reporters at the Baku Energy Week, Trend reports.

He said that the company has started drilling a production well to determine the size of the newly discovered oil reserves.

According to the regional president, although there was a possibility of oil in this area from the beginning, the exact volume of reserves was not known. Therefore, the well was drilled in order to start production from the oil ring and determine real indicators.

Cristofoli pointed out that this well will also provide more accurate information about the size and potential of the oil ring.

--

MENAFN02062026000187011040ID1111198361



Trend News Agency

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.

Search