Tuesday, 02 January 2024 12:17 GMT

Kyrgyzstan Prepares Hydropower Plants For Autumn-Winter Season


(MENAFN- Trend News Agency) BISHKEK, Kyrgyzstan, May 13. Kyrgyzstan is preparing its largest hydropower plants for the upcoming 2026–2027 autumn-winter season, Trend reports via the country's Ministry of Energy.

As part of the repair campaign, works are being carried out simultaneously at the Tash-Kumyr, Shamaldy-Say, Uch-Kurgan, and Kurpsai hydropower plants.

The energy facilities are undergoing repairs of hydropower units, transformers, high-voltage equipment, and transmission lines.

In particular, specialists at the Tash-Kumyr HPP are servicing 220 kV equipment, while repairs of a transformer and a high-voltage circuit breaker are continuing at the Shamaldy-Say HPP.

The Ministry of Energy emphasized that these measures are aimed at increasing the stability of the energy system, reducing accidents, and ensuring an uninterrupted power supply to residents and businesses throughout the country.

--

MENAFN13052026000187011040ID1111109723



Trend News Agency

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.

Search