Radisson Expands High-Grade Gold Mineralization Across Previously Undrilled Trend 1-Trend 2 Gap At The O'brien Gold Project
| Date of Publication | Total Number of Drill Holes | Drill Holes with Intercepts >+3g/t | Success Rate (%) |
| June 1, 2026 | 7 | 6 | 86% |
| April 30, 2026-O'Brien | 7 | 7 | 100% |
| April 30, 2026-Thompson-Cadillac | 9 | 2 | 22% |
| January 27, 2026 | 7 | 7 | 100% |
| January 6, 2026 | 6 | 5 | 83% |
| October 28, 2025 | 15 | 13 | 87% |
| September 8, 2025 | 15 | 13 | 87% |
| July 16, 2025 | 14 | 11 | 79% |
| April 2, 2025 | 3 | 3 | 100% |
| February 26, 2025 | 20 | 15 | 75% |
| December 16, 2024 | 1 | 1 | 100% |
| Total | 104 | 83 | 80% |
Gold Mineralization at O'Brien
Gold mineralizing quartz-sulphide veins at O'Brien occur within a thin band of interlayered mafic volcanic rocks, conglomerates, and porphyritic andesitic sills of the Piché Group occurring in contact with the east-west oriented Larder Lake-Cadillac Break ("LLCB"). Gold, along with pyrite and arsenopyrite, is typically associated with shearing and a pervasive biotite alteration, and developed within multiple Piché Group lithologies and, occasionally, the hanging-wall Pontiac and footwall Cadillac meta-sedimentary rocks.
As mapped at the historic O'Brien mine, and now replicated in the modern drilling, individual veins are generally narrow, ranging from several centimetres up to several metres in thickness and are associated with broader, mineralized alteration envelopes. Multiple veins occur sub-parallel to each other, as well as sub-parallel to the Piché lithologies and the LLCB. Individual veins have well-established lateral continuity, with steeply plunging grade shoots developed over significant lengths. Based on the historic data available, it is clear that the former mine was "high-graded", with mining focussed on a main central stope and parallel veins identified but left undeveloped.
The historic O'Brien mine produced over half a million ounces of gold from such veins and shoots at an average grade exceeding 15 g/t Au and over a vertical extent of at least 1,000 metres. Modern exploration has focussed on delineating well-developed vein mineralization to the east of the historic mine within a series of repeating trends (Trend #s 0 to 5).
Figure 4: Deep Step-Out Drill Holes Completed and/or Published by the Company Since March 2026
To view an enhanced version of this graphic, please visit:
Table 3: Detailed Assay Results (see "Notes on Calculation of Drill Intercepts")

To view an enhanced version of this graphic, please visit:

To view an enhanced version of this graphic, please visit:
Table 4: Drill Hole Collar Information for Holes contained in this News Release
To view an enhanced version of this graphic, please visit:
Notes:
Hole lengths for wedges represent meterage from point of wedge.
QA/QC
All drill cores in this campaign are NQ in size. Assays were completed on sawn half-cores, with the second half kept for future reference. Drill core samples are sent to MSALABS's analytical laboratory located in Val-d'Or, Québec, for preparation and gold analysis. The entire sample is dried and crushed (70% passing a 2-millimetre sieve) and split to 500 g. The analysis for gold is performed on an approximately 500 g aliquot using Chrysos PhotonAssayTM technology. Mineralized zones containing visible gold were analyzed to extinction whereby the entire sample is split into multiple jars, each is analysed by PhotonAssay, and the average of the results is used for reporting. Standard reference materials, blank samples and duplicates were inserted for quality assurance and quality control.
MSALABS operates under ISO/IEC 17025 accreditation, utilizing industry-standard QA/QC frameworks for gold analysis. By integrating blanks, duplicates, and CRMs into their workflows, the laboratory adheres to established benchmarks that ensure precise, reliable, and verifiable results.
QP Disclosure
Disclosure of a scientific or technical nature in this news release was prepared under the supervision of Mr. Richard Nieminen, P.Geo, (QC), a geological consultant for Radisson and a Qualified Person for purposes of NI 43-101. Mr. Luke Evans, M.Sc., P.Eng., ing, of SLR Consulting (Canada) Ltd., is the Qualified Person responsible for the preparation of the MRE at O'Brien. Each of Mr. Nieminen and Mr. Evans is independent of Radisson and the O'Brien Gold Project.
About Radisson Mining
Radisson is a gold exploration company focused on its 100% owned O'Brien Gold Project, located in the Bousquet-Cadillac mining camp along the world-renowned Larder-Lake-Cadillac Break in Abitibi, Québec. A July 2025 PEA described a low cost and high value project with an 11-year mine life and significant upside potential based on the use of existing regional infrastructure. Indicated Mineral Resources are estimated at 0.63 Moz (3.49 Mt at 5.59 g/t Au), with additional Inferred Mineral Resources estimated at 1.69 Moz (10.37 Mt at 5.08 g/t Au). Please see the NI 43-101 "O'Brien Gold Project Technical Report and Preliminary Economic Assessment, Québec, Canada" effective June 27, 2025, Radisson's news release dated March 2, 2026 "With Step-Out Drilling Continuing, Radisson Demonstrates Meaningful Resource Growth at O'Brien with an Updated Mineral Resource Estimate" and other filings made with Canadian securities regulatory authorities available at for further details and assumptions relating to the O'Brien Gold Project. For more information on Radisson, visit our website at or contact:
Matt Manson
President and CEO
416.618.5885
...
Kristina Pillon
Manager, Investor Relations
604.908.1695
...
Forward-Looking Statements
This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections, and interpretations as at the date of this news release. Forward-looking statements including, but are not limited to, statements with respect to the ability to execute the Company's plans relating to the O'Brien Gold Project as set out in the Preliminary Economic Assessment; the Company's ability to complete its planned exploration and development programs; the absence of adverse conditions at the O'Brien Gold Project; the absence of unforeseen operational delays; the absence of material delays in obtaining necessary permits; the price of gold remaining at levels that render the O'Brien Gold Project profitable; the Company's ability to continue raising necessary capital to finance its operations; the ability to realize on the mineral resource and mineral reserve estimates; assumptions regarding present and future business strategies; local and global geopolitical and economic conditions and the environment in which the Company operates and will operate in the future; planned and ongoing drilling; the significance of drill results; the ability to continue drilling; the impact of drilling on the definition of any resource; and the ability to incorporate new drilling in an updated technical report and resource modelling; the Company's ability to grow the O'Brien Gold Project; and the ability to convert inferred mineral resources to indicated mineral resources.
Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. Except for statements of historical fact relating to the Company, certain information contained herein constitutes forward-looking statements Forward-looking information is based on estimates of management of the Company, at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the companies to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others; the risk that the O'Brien Gold Project will never reach the production stage (including due to a lack of financing); the Company's capital requirements and access to funding; changes in legislation, regulations and accounting standards to which the Company is subject, including environmental, health and safety standards, and the impact of such legislation, regulations and standards on the Company's activities; price volatility and availability of commodities; instability in the global financial system; the effects of high inflation, such as higher commodity prices; the risk of any future litigation against the Company; changes in project parameters and/or economic assessments as plans continue to be refined; the risk that actual costs may exceed estimated costs; geological, mining and exploration technical problems; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; risks relating to the drill results at O'Brien; the significance of drill results; and the ability of drill results to accurately predict mineralization. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the parties cannot assure shareholders and prospective purchasers of securities that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Company believes that this forward-looking information is based on reasonable assumptions, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. The Company does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law. These statements speak only as of the date of this news release.
Please refer to the "Risks and Uncertainties Related to Exploration" and the "Risks Related to Financing and Development" sections of the Company's Management's Discussion and Analysis dated April 23, 2026 for the year ended December 31, 2025 available electronically on SEDAR+ at . All forward-looking statements contained in this press release are expressly qualified by this cautionary statement.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
To view the source version of this press release, please visit
Source: Radisson Mining Resources
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.








Comments
No comment