Bullet Train To Cut 508 Km Mumbai-Ahmedabad Travel To 2 Hours: Minister Shares Video
"Stay tuned for #BulletTrain in Modi 3.0!," the minister posted on X.
The video highlights some of the features of the state-of-the-art train project being built with an investment of Rs 1.08 lakh crore. These include:
The Bullet train is expected to touch a maximum speed of 320 kilometres per hour on the route.
The corridor will feature a slab track system, a technology to be used for the first time in India.
As many as 24 river bridges, 28 steel bridges, and seven mountain tunnels are being erected for the Bullet train route.
*The corridor will also have a 7 km undersea tunnel
The video describes the project as "a marvel of world-class engineering" and the "future of India."
--IANS
sps/dan
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment