Americore Resources Corp. Significantly Expands Land Position At The Trinity Silver Project, Historic Resource Base Tripled To 36 Million Oz Silver Equivalent
| Cut-off grade Ag oz/ton | Resource category | Mineralization type | Million Tons | oz/ton Ag | Contained Ag (oz) |
| 0.5 | Inferred | Oxide | 6.43 | 1.134 | 7,287,000 |
| Cut-off grade AgEq oz/ton | Resource category | Mineralization type | Tons | oz/ton Ag | Contained Ag (oz) | %Pb | %Zn | Contained AgEq (oz) |
| 0.8 | Inferred | Sulphide | 19.79 | 1.07 | 21,165,000 | 0.217 | 0.354 | 28,836,759 |
The following assumptions were used to calculate silver equivalent (AgEq):
- Three-year trailing Ag, Pb and Zn prices of US$28.41/oz, US$1.02/lb and US$0.96/lb respectively; Sulphide metallurgical recoveries of 85.8% Ag, 85.4% Pb and 82.8% Zn; Mining and processing cost of US$10.55/ton; A 4% NSR royalty was applied.
These estimates are considered to be historic in nature. The Company is not treating these historic estimates as a current resource. The Qualified Person has not done sufficient work to classify the estimates as a current resource and there is no guarantee that further work will convert these historical estimates to current resources.
Geological Highlights
Silver mineralization at Trinity is primarily hosted within rhyolitic tuffs, volcaniclastic units, intrusive rocks, and structurally controlled breccias, with both oxide and sulphide domains present. The TS and ELM claims exhibit multi-metal anomalies consistent with the Trinity system.
Technical Context & NI 43-101 Support
The 2025 NI 43-101 report prepared by RESPEC (Technical Report on the Trinity Project, Pershing County, NV, authored by J Bickel, RESPEC, Reno NV, dated October 28, 2025, and filed on SEDAR under the company's profile) notes that silver-lead-zinc-copper zonation is permissive of additional mineralization east, southeast, and northeast of previously drilled areas. The Primus claims lie directly within these open extensions.
The vendor collected a total of seven chip and grab from these sites over a N-S strike length of 400 feet.. Several samples were highly anomalous in the metals found at the Trinity mine (Ag, Pb and Zn) but also include a possible second mineralizing event which may have introduced an additional suites of mineral including Au. Analytical results are shown in the table below.
| Sample # | Ag | Pb | Zn | Au | Sn | Sb | Mo | Hg | Cu | As |
| | g/t | ppm | ppm | g/t | ppm | ppm | ppm | ppm | ppm | ppm |
| E569412 | 2.13 | 618 | 893 | <0.005 | 37.6 | 603 | 6.24 | 0.032 | 182 | 1745 |
| E569413 | 0.17 | 9 | 42 | <0.005 | 0.8 | 2.19 | 4.62 | 0.013 | 521.6 | 49.5 |
| E569414 | 568 | 10.45% | 5.28% | 1.18 | 267 | 2160 | 45.5 | 3.18 | 598 | >10000 |
| E569415 | 1690 | 14.70% | 1.66% | 4.33 | >500 | >10000 | 92.1 | 5.31 | 2430 | >10000 |
| E569471 | 44 | 1125 | 967 | 0.15 | 25.4 | 445 | 4.1 | 0.45 | 114 | 1400 |
| E569472 | 149 | 8840 | 1.01% | 0.71 | 89.5 | 981 | 9.77 | 2.12 | 198 | 6000 |
| E569473 | 408 | 4.14% | 2.32% | 1.25 | 226 | 4380 | 10.45 | 3.99 | 954 | >10000 |
It should be noted that grab sample results are not indicative of the presence of economic mineralization.
Agreement Terms
Americore may acquire a 100% interest in the 42 claims by:
- Paying Primus USD 8,900 on execution of the agreement;
Paying Primus USD 25,000 and issuing 100,000 fully paid shares within five business days of filing with the Exchange; Paying Primus USD 40,000 and issuing 150,000 fully paid shares on the first anniversary of the Effective Date;
Paying Primus USD 60,000 and issuing 250,000 units comprising 250,00 fully paid shares and 250,000 share purchase warrants on the second anniversary of the Effective Date; Paying Primus USD 230,000 and issuing 500,000 units comprising 500,00 fully paid shares and 500,000 share purchase warrants on the third anniversary of the Effective Date;
Upon the commencement of Commercial Production from the property, Americore shall pay Primus a 2% NSR, half of which can be purchased by Americore for USD 2,000,000 or 30,000 ounces of silver.
Upcoming Exploration Catalysts
- Full digitization and reinterpretation of historic datasets.
AI-assisted 3D structural modelling. Confirmation drilling and stockpile evaluation.
Target refinement across newly staked ground. Delivery of a current NI 43-101 Mineral Resource estimate targeted for Q2 2026.
Project Background
The Trinity Silver Project benefits from strong infrastructure and historic mining, with U.S. Borax producing approximately 5 million ounces of silver between 1987–1988. These results are historical and should not be relied upon for current economic assessment.

View of the Trinity Silver open pit, October 2025 looking NE
To view an enhanced version of this graphic, please visit:

View of the Trinity Silver open pit, October 2025 looking SW
To view an enhanced version of this graphic, please visit:
Management Commentary
Jeff Poloni, CEO of Americore, stated:
"The Primus acquisition consolidates a key structural corridor and allows us to incorporate significant historic drilling into our current model. We can now formally evaluate oxide and sulphide extensions to the historic pit area and integrate them into our upcoming resource work."
Qualified Person
The technical information in this release has been reviewed and approved by Chris M. Healey, P.Geo., Chief Geologist and Director of Americore Resources Corp., a Qualified Person under NI 43-101.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment