Azerbaijan Reviews Progress At Gobustan Solar Power Plant
"Within the framework of the installation of the first panel of the Gobustan Solar Power Plant, the first auction-based renewable energy project with a capacity of 100 MW, we met with Nan Yi, President of Universal Energy, who is on a visit to our country. We exchanged views on the progress of the plant's construction, opportunities for expanding cooperation, as well as the company's experience in long-term and safe energy storage technologies," the post reads.
The Gobustan Solar Power Plant, expected to be operational by 2027, is forecasted to generate around 180 million kilowatt-hours of electricity annually. This output is projected to save approximately 39 million cubic meters of natural gas each year and reduce carbon emissions by about 86,000 tons.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment