Azerbaijan Breaks Ground On New Tunnel For Pirshaghi-Novkhani-Khirdalan Highway
The tunnel is being constructed at the 3.6th kilometer of the project, passing under the existing railway line. The total length of the tunnel-type overpass is 620.6 meters. Of this, 36.6 meters are closed and 584 meters are open.
Currently, excavation and concreting of supports, as well as installation of piles, are being carried out on the facility.
The 29-kilometer highway, built to technical category 1B standards, will boast six lanes. The project includes the construction of nine interchanges, 13 overpasses, a channel bridge, and two tunnel-type overpasses.
Construction is carried out in accordance with established “Construction Norms and Rules”, following the proper technological sequence and maintaining high-quality standards. To ensure timely completion, the necessary equipment and workforce have been mobilized on-site.
Once completed, the new highway will provide convenient and efficient transport connections between settlements in the northeast of the Absheron Peninsula and the northern regions via the Baku–Guba–state border highway with the Russian Federation, as well as with the western regions via the Baku–Shamakhi–Yevlakh highway, all without requiring passage through the capital.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment