| Event | Date |
| Ex-Dividend date | 25 July, 2025 |
| Record date | 25 July, 2025 |
| Last day for currency election | 30 July, 2025 |
| Date of exchange rate used for Pounds Sterling | 1 August, 2025 |
| Announcement of exchange rate in Foreign Designated Currencies | 1 August, 2025 |
| Payment date | 15 August, 2025 |
The below outlines the payment treatment for shareholders.
- Depository Interest ("DI") holders registered in London will be paid in British Pounds, with an option to elect for United States Dollar payment;
Canadian Registered holders will be paid in Canadian Dollars, with an option to elect for United States Dollar payment.
Segun Lawson, President & CEO, stated :
"I am pleased to report a solid operational second quarter of the year, which continues from the strong start we made to the year. Having unwound all our hedged gold positions in the previous quarter, we were able to benefit from the full exposure to the high prevailing gold prices, resulting in a record quarterly revenue of US$82.5 million. We have achieved this whilst continuing to maintain our production costs in line with our guidance.
"In the Quarter, exploration activities which have included multiple drilling campaigns, were increased across our entire portfolio.
"Looking ahead, we are well positioned for the second half of the year. We are maintaining our guidance range of 85,000 to 95,000 ounces for the year. On the exploration front, underground drilling at Segilola continues, building on the data received in the Quarter and aimed at extending the Segilola mine life.
"In Senegal, over 11,000 metres were drilled at the Baraka 3 prospect which will be incorporated into the Douta PFS once all the results are received.
Finally in Côte d'Ivoire, we are pleased to have completed our maiden drilling program on our Guitry Project and look forward to releasing these results and from all our drilling programs shortly, once obtained. We also continue to be encouraged by the initial exploration results from the Marahui Project where we are now positioned to kick off a maiden drilling program at the end of the rainy season."
Exploration Q2 2025 Highlights
Nigeria (Segilola)
- Continuation of diamond drilling program to test the depth extensions of the Segilola deposit
A total of 4,418 metres ("m") has been completed across 12 holes The drillholes were designed to test the continuity of two main types:
- Steep plunging high-grade hanging wall shoots
Shallow plunging mineralisation that is projected to continue down-plunge to the south
Senegal
- During the quarter, along with a number of PFS workstreams, the Company undertook drilling programs at Makosa North, Bridge and Tail and the Baraka 3 Prospect.
- RC drilling to upgrade inferred resources to indicated resources at Makosa North, Makosa Bridge and Makosa East has been completed and an updated resource estimate is in preparation. Management considers that there is reasonable expectation that most of the Inferred Resources will be upgraded to Indicated Resource status.
The original 8,000 metre RC drilling program at Baraka 3 was extended to over 11,000 metres. In addition to this, initial metallurgical test work is being carried out on the Baraka 3 ore. Management considers that there is reasonable expectation that the Baraka 3 prospect will provide additional resources to the Douta Project. It is anticipated that the current drilling program assay results will be fully received in Q3 2025, following which a Baraka 3 resource will be prepared for inclusion in the updated Douta Resource and Douta PFS.
Côte d'Ivoire
- Guitry Project - Work during the Quarter comprised an initial 4,000 metre RC drilling program designed to test extensions of the identified interpreted mineralisation and to confirm the revised structural interpretation, with drill results expected to be released in July 2025.
Marahui Exploration Licence - Exploration activities continued with further geological mapping, rock chip sampling and soil geochemical sampling to define drill targets, delineating a 5 kilometre ("km") long by 200m wide anomaly to be drilled following the rainy season.
PRODUCTION SUMMARY
| | Units | Q2 2025 | Q1 2025 | Q4 2024 | Q3 2024 | Q2 2024 |
| Mining | | | | | | |
| Total Mined | Tonnes | 2,756,363 | 2,874,533 | 3,781,881 | 4,024,002 | 4,710,220 |
| Waste Mined | Tonnes | 2,513,901 | 2,602,158 | 3,398,182 | 3,668,487 | 4,171,122 |
| Ore Mined | Tonnes | 242,461 | 272,375 | 383,699 | 355,515 | 491,935 |
| Grade | g/t Au | 3.02 | 2.42 | 2.30 | 2.01 | 1.78 |
| | | | | | | |
| Processing | | | | | | |
| Ore Processed | Tonnes | 238,425 | 231,825 | 247,075 | 201,958 | 174,000 |
| Grade | g/t Au | 3.12 | 3.23 | 3.08 | 3.22 | 3.42 |
| Recovery | % | 93.1 | 93.7 | 89.2 | 88.5 | 94.6 |
| Gold Recovered | oz | 22,229 | 22,594 | 21,827 | 18,496 | 18,090 |
| Gold Poured | oz | 22,784 | 22,790 | 24,662 | 20,110 | 21,742 |
Table 1: Production Summary
THOR EXPLORATIONS LTD.
Segun Lawson
President & CEO
About Thor Explorations
Thor Explorations Ltd. is a Canadian mineral exploration company engaged in the acquisition, exploration and development of mineral properties located in Nigeria, Senegal and Côte d'Ivoire. Thor holds a 100% interest in the Segilola Gold Project located in Osun State of Nigeria. Mining and production commenced at Segilola in 2021. Thor holds a 70% interest in the Douta Gold Project located in south-eastern Senegal. Thor trades on the TSX Venture Exchange under the symbol "THX".
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment