
Azerbaijan Debuts Dredging Vessel Construction
According to the source, the design of this vessel was developed by experienced specialists of the Damen Shipyards Gorinchem B.V. company.
"The construction of the ship has already been completed. The next stage will be the testing of the ship at the berth of the Baku Shipyard.
The dredging vessel, built by the order of Baku International Sea Trade Port, has a total length of 61.2 meters, a hull length of 49.3 meters, a total width of 10.5 meters, a draft of 1.65 meters, and a drilling depth of 18 meters," the source emphasized.
The fabrication of the vessel, designated for executing offshore dredging operations, is slated for culmination and handover in May of the current fiscal year.

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.
Comments
No comment