Borealis Drills 4.48 G/T Gold Over 30.5 Metres Including 15.16 G/T Gold Over 6.1 Metres In Oxides At Historical Cerro Duro Deposit In Nevada
| BHID | From (m) | To (m) | Interval (m) | Au (ppm) | Ag (ppm) | Material |
| BMCD009 | 6.1 | 32.0 | 25.9 | 0.67 | 81.81 | Oxide bedrock |
| including | 6.1 | 13.7 | 7.6 | 1.12 | 106.28 | Oxide bedrock |
| BMCD012 | 27.4 | 57.9 | 30.5 | 4.48 | 20.5 | Oxide bedrock |
| including | 47.2 | 53.3 | 6.1 | 15.16 | 42.18 | Oxide bedrock |
| BMCD015 | 6.1 | 27.4 | 21.3 | 0.58 | 14.18 | Oxide bedrock |
| including | 21.3 | 27.4 | 6.1 | 1.03 | 20.14 | Oxide bedrock |
| BMJR001 | 9.1 | 16.8 | 7.6 | 0.77 | 3.48 | Oxide bedrock |
| DHBM001 | 11.7 | 19.8 | 8.1 | 1.89 | 13.30 | Oxide bedrock |
Table 2: Composite Au & Ag assay results of significant intercepts of the reported drillholes within dump and fill material from historical mining activities. True widths are estimated to be approximately 100% of reported widths.
| BHID | From (m) | To (m) | Interval (m) | Au (ppm) | Ag (ppm) | Material |
| BMCD002 | 3.0 | 10.7 | 7.6 | 0.39 | 1.94 | Dump |
| BMCD004 | 1.5 | 19.8 | 18.3 | 0.38 | 1.48 | Dump |
| BMCD012 | 0.0 | 16.8 | 16.8 | 0.54 | 20.14 | Backfill |
| BMCD015 | 0.0 | 6.1 | 6.1 | 0.67 | 15.00 | Backfill |
| BMJR001 | 0.0 | 9.1 | 9.1 | 0.80 | 11.72 | Backfill |
Table 3: Coordinates and details of today's reported drill results
| BHID | X | Y | Z | Length (m) | Azimuth | Dip | Target | Comment |
| DHBM001 | 437418 | 1333993 | 7312 | 1000 | 303.35 | -62.61 | Jaimie's Ridge confirmation | Re-drill of DHBM002. |
| DHBM002 | 437403 | 1334005 | 7311 | 167 | 301 | -75 | Jaimie's Ridge confirmation | Poor recovery in mineralized zone. |
| DHBM003 | 436875 | 1334768 | 7447 | 367 | 157 | -54 | Jaimie's Ridge step-out | Prospective alteration profile. No anomalous Au or Ag. |
| BMCD001 | 437495 | 1334272 | 7356 | 1000 | 158.49 | -50.54 | Exploration - JRCD NE Structure | Anomalous mineralization and silicic alteration. |
| BMCD002 | 437112 | 1333208 | 7298 | 620 | 349.67 | -64.11 | Exploration - CSAMT anomaly | Anomalous mineralization and silicic alteration. Gold in dump material. |
| BMCD003 | 437990 | 1334453 | 7383 | 580 | 155.6 | -45 | Exploration - JRCD NE Structure | Anomalous mineralization and silicic alteration. |
| BMCD004 | 437179 | 1333156 | 7298 | 1180 | 342.24 | -60.55 | Exploration - CSAMT anomaly | Anomalous mineralization and silicic alteration. Gold in dump material. |
| BMCD005 | 439180 | 1334382 | 7642 | 330 | 235 | -75 | Cerro Duro step-out | Prospective alteration profile. |
| BMCD006 | 43171 | 1334377 | 7643 | 300 | 0 | -90 | Cerro Duro step-out | Prospective alteration profile. |
| BMCD007 | 439195 | 1334405 | 7642 | 300 | 310 | -76 | Cerro Duro step-out | Prospective alteration profile. |
| BMCD008 | 439223 | 1334402 | 7642 | 300 | 25 | -75 | Cerro Duro step-out | Prospective alteration profile. |
| BMCD009 | 439013 | 1334464 | 7564 | 300 | 0 | -90 | Cerro Duro confirmation | Au in oxides. |
| BMCD010 | 439030 | 1334507 | 7565 | 300 | 0 | -90 | Cerro Duro step-out | Prospective alteration profile. |
| BMCD011 | 438759 | 1334405 | 7511 | 175 | 0 | -90 | Cerro Duro step-out | Prospective alteration profile, anomalous gold up to 0.20 g/t over 12.2 m. |
| BMCD012 | 438845 | 1334440 | 7517 | 350 | 0 | -90 | Cerro Duro confirmation | Au in oxides. Au in backfill. |
| BMCD013 | 438887 | 1334545 | 7510 | 200 | 0 | -90 | Cerro Duro step-out | Prospective alteration profile. Anomalous gold in bedrock and dumps up to 0.15 g/t over 7.62 m |
| BMCD014 | 438764 | 1334550 | 7476 | 200 | 0 | -90 | Cerro Duro step-out | Prospective alteration profile. |
| BMCD015 | 438886 | 1334467 | 7517 | 90 | 0 | -90 | Cerro Duro confirmation | Au in backfill. Au in oxides. Casing issue at bedrock interface. Hole abandoned before final target. |
| BMJR001 | 437420 | 1333974 | 7311 | 310 | 304.9 | -80 | Jaimie's Ridge | Au in oxides. |
Qualified Person and QA&QC
The scientific and technical content of this news release was reviewed, verified, and approved by Iain Campbell, P.Geo., VP Exploration of the Company, and a Qualified Person as defined by Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects. However, certain data presented here, including historical resources and certain drill results, are pre-NI 43-101 estimates and should not be relied upon as current mineral resources or reserves.
The quality assurance and quality control protocols in place at Borealis include insertion of blank or standard samples every 10 samples on average, in addition to the regular insertion of blank, duplicate, and standard samples by the analytical laboratory during the assay process. The assay results presented herein are derived from both diamond drill core and RC drill chips. For diamond drill core, geologists mark out samples for geology technicians to saw in half, from which one half is retained at the Borealis mine site and the other half is submitted for assay. For RC drilling, geologists supervise riffle splitting of RC return at the drill site. Samples were submitted to both ALS Global's Reno, NV laboratory and Paragon Geochemical's Sparks, NV laboratory. At ALS, samples were treated with a 30 gram fire assay with an AA finish, along with a four-acid multi-element analysis (MS-MS61). At Paragon, samples were treated with a 30 gram fire assay with an AA finish for Au, and four-acid multi-element analysis (48MA-MS).
Borealis Mine
The Borealis mine property, located close to the town of Hawthorne, NV, is fully permitted and equipped for present mine operations and future expansion, with existing open pits, heap leach pads, modern infrastructure, and a functional ADR facility which produces doré bars. The project has historically produced over 600,000 ounces of gold from an open pit heap leach operation. It is an under-explored property and has not been drilled since 2011, aside from Borealis' efforts in 2024 and 2025. The property possesses high grade expansion potential with excellent historical drilling results, along with a number of untested regional targets.
The Borealis Project holds existing federal and state permits for mining and processing operations. However, certain permit modifications may be required for expanded production, and the timeline for such approvals is subject to regulatory review. The Company cannot guarantee the timing or success of any permit modifications that may be required for future expansions.
About Borealis
Borealis is a gold mining and exploration company focused on exploration and resumption of production of the Borealis Mine in Nevada. The Borealis Mine is a fully permitted mine site, equipped with active heap leach pads, an ADR facility, and all necessary infrastructure to support a heap leach gold mining operation. In addition to the mine, the property, comprised of 815 unpatented mining claims of approximately 20 acres each totaling approximately 16,300 acres and one unpatented mill site claim of about five acres located in western Nevada, is highly prospective for additional high-sulfidation gold mineralization. Borealis is led by a strong board and management team, many of whom have founded, managed, and sold highly successful mining and exploration companies.
For further information, please contact:
Kelly Malcolm
President and Chief Executive Officer
...
Office: (289) 371-3371
This news release may contain certain "forward-looking information" within the meaning of applicable securities law. Forward Looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "may", "will", "would", "potential", "proposed" and other similar words, or statements that certain events or conditions "may" or "will" occur. These statements are only predictions. Forward-Looking information is based on the opinions and estimates of management at the date the information is provided, and is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. For a description of the risks and uncertainties facing the Company and its business and affairs, readers should refer to the Company's Management's Discussion and Analysis. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change, unless required by law. The reader is cautioned not to place undue reliance on forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
To view the source version of this press release, please visit
SOURCE: Borealis Mining Company Limited
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.





Comments
No comment