AB KN Energies To Provide Advisory Services For The FSRU Project In The Gulf Of Gdańsk
The LNG terminal being developed in the Gulf of Gdańsk is strategically important for Poland and the wider Baltic Sea region, aimed at strengthening gas supply diversification and long-term energy security. The first stage of the terminal, based on a floating storage and regasification unit (FSRU), is expected to provide up to 6.1 billion cubic metres of natural gas per year and is planned to be commissioned in 2028. In March 2026, GAZ-SYSTEM launched the FSRU 2 Open Season aimed at increasing the regasification capacity of the planned LNG terminal.
Beyond the Klaipėda LNG terminal, there are currently 14 floating LNG terminals in operation or under construction across the European Union. KN Energies has been or is involved in projects related to 8 of these terminals, representing approximately 53% of all such projects in the EU.
More information is available on the KN Energies website:
Tomas Tumėnas, Chief Financial Officer, tel. +370 46 391772

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment