Tuesday, 02 January 2024 12:17 GMT

Sranan Gold Continues To Extend The Mineralized Zone At The Randy's Pit Target, Tapanahony Project, Suriname


(MENAFN- Newsfile Corp) Edmonton, Alberta--(Newsfile Corp. - December 4, 2025) - Sranan Gold Corp. (CSE: SRAN) ("Sranan Gold" or the "Company") reports additional assay results from diamond drilling at the Randy's Pit target on its Tapanahony Project, Suriname.

Highlights include 22.4m at 2.44 g/t Au in hole 25RADD-006 and 19m at 1.68 g/t Au in hole 25RADD-009. These new results (Table 1) continue to extend the mineralized structure along strike and with depth. The results build on the previously released (NR 04 November 2025) intercept of 64.0 metres grading 3.0 g/t Au (including 33.5 g/t Au over 5 m) in drill hole 25RADD-004. Sranan has now completed over 3,000 metres of drilling at Randy's pit target and continues to demonstrate the continuity, and potential of the 4.5-km-long Randy–Poeketi gold Trend.

Table 1: Additional mineralized zones * of initial holes drilled by Sranan Gold
EPSG: 32621, UTM 21N WGS 84

Hole ID Easting Northing Z Azimuth Dip Depth From (m) To (m) Interval (m) Au (g/t)
25RADD-005 766349 455400 127.9 90 -45 224 73.5 85.5 12 1.31
Including
84.5 85.5 1 9.63
and
98 106 8 1.06

25RADD-006 766355 455370 130.3 90 -45 161 91.6 114 22.4 2.44
including
99 114 15 3.17
including
101 108 7 4.77
and including
105 108 3 7.99
and including
105 106 1 16.43

25RADD-007 766355 455370 130.3 90 -45 224 144 150 6 3.82
and
157 159 2 2.88

25RADD-008 766337 455346 126.2 90 -50 200 138 146.5 8.5 1.77
including
138 139 1 7.44
including
143.5 145.5 2 3.11
25RADD-009 766310 455455 134.7 90 -45 200 87 92 5 1.40
and
114 133 19 1.68
including
120 126 6 4.29
and including 120 121 1 24.71

*Intercepts above 0.3 g/t Au with internal dilution up to 5m tolerated.

Widths shown are sampled intervals within the drill hole and may not represent true widths or thickness.

These new drill results continue to intersect multiple mineralized intervals within a wider shear corridor with zones of higher-grade mineralization. There is consistent mineralization within the upper and mid-levels of this west dipping shear system that support continuity between earlier holes and the holes reported in this release. A strong, broad interval is recognized in a central mineralized corridor that is trending along strike from the initial high-grade intercept in 25RADD-004 (see NR dated 04 November 2025).

The higher-grade intercepts reported in this release indicate that there is vertical and lateral continuity of the gold mineralization. The drilling completed to date supports the Company's developing structural model of high-grade shoots within the north-north-west trending Poeketi shear corridor. The 19-metre interval in drill hole 25RADD-009 (see Figure1) is especially important as it represents an additional wide zone of continuous mineralization that is north of Randy's pit.

Dr. Dennis LaPoint, EVP Exploration and Business Development states that "We are very pleased with the continued expansion of the mineralized trend at Randy's pit along strike and at depth. The high grades are positive for future development as we continue to expand the mineralization at the Randy's pit further to the north."




Figure 1: Plan map of drilling by Sranan Gold at Randy's Pit target with new major structural corridor of shearing, the Poeketi shear Zone

To view an enhanced version of this graphic, please visit:

The mineralized shear zone is hosted in basalt/mafic volcanic rock (see Figure 2) with strong sericite-silica alteration. Oriented core measurements confirm NNW striking shear zone, with slight crenulations and local brecciation. The presence of both pyrite and pyrrhotite is strongly associated with the mineralized shear corridor.




Figure 2: Section 455350N showing 25RADD-006 and 25RADD-007 with west dipping NNW shear zone within basalts north of Randy's pit

To view an enhanced version of this graphic, please visit:

Samples were prepared and assayed by Filab in Paramaribo, Suriname. All samples >2 g/t were re-assayed with 50 gm re-assay and gravimetric assay. Standard QA/QC procedures were followed and showed a satisfactory level of reproducibility. The Company notes that the drill intercepts may not represent true underlying mineralization. Core logging and photography and sampling are completed under strict industry standard QA/QC protocols (Oreas certified reference materials, assayed coarse blanks, duplicates of core).

Qualified Person
Dr. Dennis J. LaPoint, Ph.D., P.Geo., a "qualified person" as defined under National Instrument 43-101, has reviewed and approved the scientific and technical information contained in this release. Dr. LaPoint is not independent of Sranan Gold, as he is the Company's EVP of Exploration and Corporate Development.

About Sranan Gold
Sranan Gold Corp. is engaged in the business of mineral exploration and the acquisition of mineral property assets in Suriname and Canada. The Company's flagship Tapanahony Project covers 29,000 hectares in one of Suriname's most prolific artisanal gold mining districts.

MENAFN04122025004218003983ID1110436967



Newsfile Corp

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.

Search