Wesdome Intersects New Zone At Kiena's Dubuisson Deposit
| Raj Gill SVP, Corporate Development & Investor Relations Phone: +1.416.360.3743 E-Mail:... | Trish Moran VP, Investor Relations Phone: +1.416.564.4290 E-mail:... |
Technical Disclosure
Analytical work was performed by ALS Minerals of Val-d'Or (Quebec), a certified commercial laboratory (Accredited Lab #689). Sample preparation was completed at ALS Minerals in Val d'Or (Quebec). Assaying comprised fire assay methods with an atomic absorption finish. Any sample assaying >10 g/t Au was re-run using the fire assay method with gravimetric finish, and also with the metallic sieve method. In addition to laboratory internal duplicates, standards, and blanks, the geology department inserts blind duplicates, standards, and blanks into the sample stream at a frequency of one in twenty to monitor quality control. Additionally, blanks are inserted after visible gold is observed to highlight potential contamination between samples.
The technical content of this release has been compiled, reviewed, and approved by Serge Gonthier, P.Geo, Principal Geologist, Resources and Geology for Wesdome, and Breanne Beh, P. Geo., Director Surface and Greenfields Exploration for Wesdome, who are the Company's "Qualified Person" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
Forward-Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation, including but not limited to statements regarding: the opportunity to expand the Dubuisson deposit at depth; the potential for future bulk-tonnage mineralization at Kiena; the planned follow-up hole before the end of the current barge drilling season, along with the larger barge-based drilling program scheduled for 2026; and the result of applying lower cut-off grades to the deposit to potentially define a broader mineralized interval. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and they are subject to known and unknown risks, uncertainties, and other factors that may cause the actual results, level of activity, performance or achievements of Wesdome to be materially different from those expressed or implied by such forward-looking statements or forward-looking information. Although management of Wesdome has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended.
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management's estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.
APPENDIX
Figure 1. Plan View – Kiena Mine
Figure 2. Dubuisson Zone – Cross-Section (Looking West)
Table 1: Dubuisson Drill Results (Previously Unreleased)
Composite Results
Figures in table may not add due to rounding
| Hole No. | From (m) | To (m) | Core Length (m) | Estimated True Width (m) | Grade (g/t Au) | Cut Grade (g/t Au) | Target |
| DB-25-068 | 410.4 | 436.2 | 25.8 | --- | 4.1 | --- | New Dubuisson Zone |
| including | 412.5 | 418.6 | 6.1 | --- | 6.1 | --- | New Dubuisson Zone |
| including | 423.4 | 425.3 | 1.90 | --- | 3.8 | --- | New Dubuisson Zone |
| Including | 428.6 | 432.1 | 3.50 | --- | 8.1 | --- | New Dubuisson Zone |
| including | 434.1 | 436.2 | 2.10 | --- | 3.6 | --- | New Dubuisson Zone |
Composite estimate based on assay cut-off grade of 2.62 g/t Au, with up to two consecutive sample intervals with assays below 2.62 g/t Au dispersed between the samples with at or higher than cut-off grade values.
Assay Results
Figures in table may not add due to rounding
| Hole No. | From (m) | To (m) | Core Length (m) | Grade (g/t Au) | Cut Grade (g/t Au) | Target |
| DB-25-068 | 408.4 | 409.4 | 1.0 | 1.7 | New Dubuisson Zone | |
| DB-25-068 | 409.4 | 410.4 | 1.0 | 1.3 | New Dubuisson Zone | |
| DB-25-068 | 410.4 | 411.5 | 1.1 | 5.3 | New Dubuisson Zone | |
| DB-25-068 | 411.5 | 412.5 | 1.0 | 1.8 | New Dubuisson Zone | |
| DB-25-068 | 412.5 | 413.6 | 1.1 | 8.4 | New Dubuisson Zone | |
| DB-25-068 | 413.6 | 414.7 | 1.1 | 2.9 | New Dubuisson Zone | |
| DB-25-068 | 414.7 | 415.6 | 0.9 | 6.6 | New Dubuisson Zone | |
| DB-25-068 | 415.6 | 416.6 | 1.0 | 5.2 | New Dubuisson Zone | |
| DB-25-068 | 416.6 | 417.5 | 0.9 | 11.6 | New Dubuisson Zone | |
| DB-25-068 | 417.5 | 418.6 | 1.1 | 3.0 | New Dubuisson Zone | |
| DB-25-068 | 418.6 | 419.7 | 1.1 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 419.7 | 420.7 | 1.0 | 0.2 | New Dubuisson Zone | |
| DB-25-068 | 420.7 | 421.6 | 0.9 | 9.5 | New Dubuisson Zone | |
| DB-25-068 | 421.6 | 422.3 | 0.7 | 1.3 | New Dubuisson Zone | |
| DB-25-068 | 422.3 | 423.4 | 1.1 | 0.9 | New Dubuisson Zone | |
| DB-25-068 | 423.4 | 424.4 | 1.0 | 3.5 | New Dubuisson Zone | |
| DB-25-068 | 424.4 | 425.3 | 0.9 | 4.2 | New Dubuisson Zone | |
| DB-25-068 | 425.3 | 426.3 | 1.0 | 2.3 | New Dubuisson Zone | |
| DB-25-068 | 426.3 | 427.6 | 1.3 | 1.0 | New Dubuisson Zone | |
| DB-25-068 | 427.6 | 428.6 | 1.0 | 2.0 | New Dubuisson Zone | |
| DB-25-068 | 428.6 | 429.8 | 1.2 | 17.6 | New Dubuisson Zone | |
| DB-25-068 | 429.8 | 431.0 | 1.2 | 3.0 | New Dubuisson Zone | |
| DB-25-068 | 431.0 | 432.1 | 1.1 | 3.3 | New Dubuisson Zone | |
| DB-25-068 | 432.1 | 433.0 | 0.9 | 0.9 | New Dubuisson Zone | |
| DB-25-068 | 433.0 | 434.1 | 1.1 | 0.4 | New Dubuisson Zone | |
| DB-25-068 | 434.1 | 435.1 | 1.0 | 2.7 | New Dubuisson Zone | |
| DB-25-068 | 435.1 | 436.2 | 1.1 | 4.4 | New Dubuisson Zone | |
| DB-25-068 | 436.2 | 437.1 | 0.9 | 0.4 | New Dubuisson Zone | |
| DB-25-068 | 437.1 | 438.0 | 0.9 | 2.3 | New Dubuisson Zone | |
| DB-25-068 | 438.0 | 439.1 | 1.1 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 439.1 | 440.1 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 440.1 | 440.8 | 0.7 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 440.8 | 441.4 | 0.6 | 0.7 | New Dubuisson Zone | |
| DB-25-068 | 441.4 | 442.4 | 1.0 | 1.0 | New Dubuisson Zone | |
| DB-25-068 | 442.4 | 443.1 | 0.7 | 3.0 | New Dubuisson Zone | |
| DB-25-068 | 443.1 | 443.8 | 0.7 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 443.8 | 444.8 | 1.0 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 444.8 | 445.8 | 1.0 | 0.9 | New Dubuisson Zone | |
| DB-25-068 | 445.8 | 446.3 | 0.5 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 446.3 | 447.3 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 447.3 | 448.3 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 448.3 | 449.3 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 449.3 | 450.3 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 450.3 | 451.3 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 451.3 | 452.3 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 452.3 | 453.4 | 1.1 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 453.4 | 454.4 | 1.0 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 454.4 | 455.0 | 0.6 | 1.1 | New Dubuisson Zone | |
| DB-25-068 | 455.0 | 455.6 | 0.6 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 455.6 | 456.2 | 0.6 | 20.5 | New Dubuisson Zone | |
| DB-25-068 | 456.2 | 457.0 | 0.8 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 457.0 | 457.7 | 0.7 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 457.7 | 458.7 | 1.0 | 0.6 | New Dubuisson Zone | |
| DB-25-068 | 458.7 | 459.3 | 0.6 | 1.2 | New Dubuisson Zone | |
| DB-25-068 | 459.3 | 459.9 | 0.6 | 1.8 | New Dubuisson Zone | |
| DB-25-068 | 459.9 | 460.9 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 460.9 | 461.9 | 1.0 | 0.0 | New Dubuisson Zone | |
| DB-25-068 | 461.9 | 463.0 | 1.1 | 0.1 | New Dubuisson Zone | |
| DB-25-068 | 463.0 | 464.1 | 1.1 | 0.5 | New Dubuisson Zone | |
| DB-25-068 | 464.1 | 465.2 | 1.1 | 1.5 | New Dubuisson Zone | |
*Given that there is no conceptual geological model for Dubuisson Central Zone neither true width nor top cuts were defined.
____________
No top cut or true width defined; down hole composite estimate based on assay cut-off grade of 2.62 g/t Au, with up to two consecutive sample intervals with assays below 2.62 g/t Au dispersed between the higher-grade values. Refer to March 19, 2025 press release for notes to Mineral Resources and Mineral Reserves.PDF available:
Photos accompanying this announcement are available at:
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment