
Lerik Power Plant Produces Over 207 M Kwh Of Electricity Since Launch
The“Lerik” Power Plant has generated a total of 207.5 million kilowatt-hours (kWh) of electricity from the date it was commissioned until October 1 of this year, Azernews reports, citing the Ministry of Energy.
The modular-type“Lerik” Power Plant, with an installed capacity of 16.5 MW, began operations on October 15, 2018, in the village of Cəngimeran, Lerik district.
Meanwhile, according to the State Statistical Committee, Azerbaijan produced 20.5 billion kWh of electricity from January to September 2025.
This represents an increase of 13.9 thousand kWh, or 0.1%, compared to the same period last year.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.
Most popular stories
Market Research

- Casper Network Advances Regulated Tokenization With ERC-3643 Standard
- Forex Expo Dubai Wins Guinness World Recordstm With 20,021 Visitors
- Superiorstar Prosperity Group Russell Hawthorne Highlights New Machine Learning Risk Framework
- Freedom Holding Corp. (FRHC) Shares Included In The Motley Fool's TMF Moneyball Portfolio
- Versus Trade Launches Master IB Program: Multi-Tier Commission Structure
- Ozzy Tyres Grows Their Monsta Terrain Gripper Tyres Performing In Australian Summers
Comments
No comment