Bengaluru Metro Yellow Line Sees 40-Minute Disruption On Busy Monday Evening
Bengaluru: Commuters on the recently inaugurated Namma Metro Yellow Line, connecting RV Road to Bommasandra, faced disruption on Monday evening due to a technical glitch. The issue was first detected at the RV Road station, leaving passengers stranded for around 40 minutes. The Bangalore Metro Rail Corporation Limited (BMRCL) later confirmed the technical fault. Many passengers expressed frustration over the lack of timely updates from metro officials. Train services on the Yellow Line have been running behind schedule since 7:00 PM, causing long waits at stations. As public outrage grew, BMRCL officially acknowledged the technical problem and assured commuters that services would resume twitter/AVzg7fCLYv
- ನಮ್ಮ ಮೆಟ್ರೋ (@OfficialBMRCL) September 22, 2025
BMRCL stated that the issue was expected to be resolved by 9:00 PM. Officials requested passengers' cooperation and apologized for the inconvenience caused. Since its inauguration, trains on the Yellow Line initially ran every 25 minutes with three trains in service. A fourth train was later added, reducing wait times to approximately 19 minutes. The first train now starts at 6:00 AM on weekdays (6:30 AM previously) and 7:00 AM on Sundays. The last train departs from R.V. Road at 11:55 PM and from Bommasandra at 10:42 PM.
Yellow Line Inaugurated by PM Modi
The Yellow Line was inaugurated by Prime Minister Narendra Modi, offering much-needed metro connectivity to Electronic City and Bommasandra. The new line has helped ease traffic congestion on this busy route, allowing commuters to reach their destinations more quickly and reliably. Following its inauguration, the Yellow Line drew over 56,000 passengers on its first day. Despite the enthusiasm, commuters faced 25-30 minute waiting times at busy stations including Electronic City, Bommasandra, Jayadeva Metro, Konappana Agrahara, and Hebbagodi. Many called for more trains and improved seating facilities. Safety concerns were also raised, as platform screen doors promised by BMRCL were not yet installed. The Yellow Line trains featured digital display boards showing current, next, and previous stops, separate screens for announcements and advertisements, USB charging ports, enhanced CCTV surveillance, and improved handrails. Early observations indicated a 10-20% reduction in traffic congestion at Central Silk Board.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.
Most popular stories
Market Research

- Kucoin Partners With Golf Icon Adam Scott As Global Brand Ambassador
- Mediafuse Joins Google For Startups Cloud Program To Scale AI-Driven, Industry-Focused PR Distribution
- Solotto Launches As Solana's First-Ever Community-Powered On-Chain Lottery
- 1Inch Unlocks Access To Tokenized Rwas Via Swap API
- Leverage Shares Launches First 3X Single-Stock Etps On HOOD, HIMS, UNH And Others
- Forex Expo Dubai 2025 Returns October 67 With Exclusive Prize Draw Including Jetour X70 FL
Comments
No comment