
Centre Approves Rs 13,595 Crore To Evacuate Green Energy From Rajasthan, Karnataka
These schemes will be implemented through Tariff Based Competitive Bidding (TBCB) mode and are part of the 500 GW renewable energy capacity to be created by 2030 out of which 200 GW is already connected.
The power evacuation scheme for Rajasthan Renewable Energy Zone (REZ) entails an investment of about Rs 12,241 crore and will evacuate 4.5 GW of RE power from Rajasthan. It comprises 1 GW from Fatehgarh Complex, 2.5 GW from Barmer Complex and 1 GW from Nagaur (Merta) Complex. This power will be transferred to Mainpuri Region, Fatehpur and Orai of Uttar Pradesh. The scheme is scheduled to be completed in two years.
The second scheme to be implemented at a cost of Rs 1,354 crore, involves the strengthening of the transmission system in Karnataka to evacuate 4.5 GW RE power from Koppal and Gadag areas. The scheme will be completed by June 2027.

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.
Most popular stories
Market Research

- Manuka Honey Market Report 2024, Industry Growth, Size, Share, Top Compan...
- Modular Kitchen Market 2024, Industry Growth, Share, Size, Key Players An...
- Acrylamide Production Cost Analysis Report: A Comprehensive Assessment Of...
- Fish Sauce Market 2024, Industry Trends, Growth, Demand And Analysis Repo...
- Australia Foreign Exchange Market Size, Growth, Industry Demand And Forec...
- Cold Pressed Oil Market Trends 2024, Leading Companies Share, Size And Fo...
- Pasta Sauce Market 2024, Industry Growth, Share, Size, Key Players Analys...
Comments
No comment