Azerbaijan Boosts Gas Infrastructure With Completion Of Lachin Station Upkeep
In his speech at the recent Energy Supply Working Group meeting, Babashov noted that the maintenance included a range of repairs and construction related to the station operator's building. These works encompassed concrete, plastering, roofing, electrical, and plumbing tasks.
“Supporting walls have been constructed, a frame for the technological section installed, and the technological part fully assembled. Construction and repairs of the auxiliary building are complete. Facilities for the fire reservoir, pumping station, generator, and transformer have been prepared. Landscaping work continues,” he said.
Babashov added that remaining tasks include installing a solar panel and completing the access road.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment