F4 And Uraniumx Hit Anomalous Radioactivity In 300 M Step Out Holes
| Collar Information | * Hand-held Spectrometer Results On Mineralized Drillcore (>300 cps / >0.5m minimum) | Athabasca Unconformity Depth (m) | Total Drillhole Depth (m) | |||||||||
| Hole ID | Section Line | Easting | Northing | Elev. | Azi | Dip | From (m) | To (m) | Interval (m) | Max CPS | ||
| ML26-017 | 990N | 547028 | 6493207 | 428 | 295 | -73 | 386.00 | 386.50 | 0.50 | 460 | 320.0 | 470 |
| ML26-018 | 990N | 547028 | 6493207 | 428 | 292 | -68 | 347.00 | 347.50 | 0.50 | 350 | 332.3 | 416 |
Handheld spectrometer composite parameters:
1: Minimum Thickness of 0.5 m
2: CPS Cut-Off of 300 counts per second
3: Maximum Internal Dilution of 2.0 m
Figure 1. Murphy Lake 2026 Drill Program.
To view an enhanced version of this graphic, please visit:
Figure 2. Line 990N Cross Section
To view an enhanced version of this graphic, please visit:
The natural gamma radiation detected in the drill core, as detailed in this news release, was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 spectrometer which has been calibrated by Radiation Solutions Inc. The Company designates readings exceeding 300 cps on the handheld spectrometer (occasionally referred to as a scintillometer in industry terminology; this stems from historical naming conventions and the shared functionality of detecting gamma radiation between a spectrometer and a scintillometer)-as "anomalous", readings above 10,000 cps as "highly radioactive", and readings surpassing 65,535 cps as "off-scale". The Company may also report radioactivity as measured with a downhole QL-40GR gamma probe from Mount Sopris. The Company designates readings exceeding 500 cps on the downhole gamma probe as "anomalous".
Readers are cautioned that handheld spectrometer (scintillometer) and downhole gamma probe readings are preliminary in nature, are not directly or consistently correlated to uranium grades determined by chemical assay, and should not be relied upon as a substitute for analytical results. All radiometric readings are subject to confirmation by laboratory assay.
Samples from the drill core are split into half sections on site. Where possible, samples are standardized at 0.5 m downhole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS.
The Company considers uranium mineralization with assay results of greater than 1.0 weight % U3O8 as "high grade" and results greater than 20.0 weight % U3O8 as "ultra-high grade".
All depth measurements reported are downhole and true thicknesses are yet to be determined.
About Murphy Lake:
F4's 609-hectare Murphy Lake Property is located in the north-eastern corner of the Athabasca Basin, 30 km northwest of Orano's McLean Lake deposits, 5 km south of ISOEnergy's Hurricane Uranium Deposit and 4 km east of Cameco's La Rocque Lake Uranium Zone where drill hole Q22-040 intersected 29.9% U3O8 over 7.0 m. The 2022 maiden drill program at the Murphy Lake Property consisted of 14 completed drillholes totaling 6,850 m; drill hole ML22-006 intersected 0.065% U3O8 over 2.5 m from 322.5 m to 325.0 m, including 0.242% U3O8 over 0.5 m.
Qualified Person
The technical information in this news release has been reviewed and approved on behalf of the Company by Sam Hartmann, P.Geo., President & Chief Operating Officer of F4, and a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
This news release also refers to neighboring properties in which F4 Uranium has no interest, and the Qualified Person has been unable to verify the information from those properties. Mineralization on those neighboring properties is not necessarily indicative of mineralization on the Murphy Lake Property.
For additional information on the Murphy Lake Property, please refer to the National Instrument 43-101 Report titled "Technical Report For The Murphy Lake Project, NE Athabasca Basin, Saskatchewan, Canada" effective March 20, 2024, available at .
About F4 Uranium Corp:
F4 Uranium is a Canadian uranium exploration company focused on the Athabasca Basin in northern Saskatchewan, led by the management and exploration team behind multiple uranium discoveries in the Basin, including most recently Patterson Lake North and Broach Lake. The project portfolio comprises 16 wholly owned properties totaling approximately 157,000 hectares, several of which sit near established uranium deposits including Paladin's Triple R, NexGen Energy's Arrow and IsoEnergy's Hurricane. The assets were spun out of F3 Uranium in 2024. F4's exploration program is split between the west and east sides of the Athabasca Basin, with the Company operating as both an explorer and project generator providing investors early-stage exposure to the Basin.
Contact Information
F4 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y 9Y2
Investor Relations
Telephone: 778 484 8030
Email: ...
ON BEHALF OF THE BOARD,
"Ray Ashley"
Raymond Ashley, CEO
F4 Uranium Corp.
Forward-Looking Statements
This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the Properties for mining exploration, future payments, issuance of shares and work commitment funds under the existing option agreement, and completion of the planned exploration program, are "forward-looking statements". These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.
The TSX Venture Exchange has not reviewed, approved or disapproved the contents of this press release, and does not accept responsibility for the adequacy or accuracy of this release.
To view the source version of this press release, please visit
Source: F4 Uranium Corp.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.




Comments
No comment