Pirate Gold Initiates Project Scale Geophysical Surveys And Provides Project Updates
| Drill Hole | Target | Visual Observations |
| PGC-25-009 | Moosehead Western Trend | Intersected the Western Trend structural zone from 121.3 to 125.3m including a 20cm stylolitic quartz vein at 124.2m depth, mineralization consists of arsenopyrite and pyrite. |
| PGC-25-010 | Regional Geophysical Target | Intersected mafic dyke from 27 to 58m associated with minor faulting, mafic dyke from 108 to 110m with fractured contact and pyrite mineralization, additional pyrite mineralization from 201 to 203m. |
| PGC-25-011 | Moosehead Western Trend | Intersected the Western Trend structural zone from 99.0 to 102.4m including several quartz veins up to 40cm in width, mineralization consists of arsenopyrite, boulangerite, pyrite and visible gold. |
| PGC-25-012 | Moosehead Western Trend | Intersected the Western Trend structural zone from 125.6 to 128.0m including quartz vein up to 15cm, mineralization consists of arsenopyrite, boulangerite, pyrite and visible gold. |
| PGC-25-013 | Moosehead Western Trend Northern Ext | Intersected interpreted extension of western trend structural zone with intermittent faulting between 20 to 45m including several altered mafic dykes, localized pyrite mineralization from 20.0 to 21.5m. |
| PGC-25-014 | Regional Geophysical Target | Dominated by sandstone and siltstone; intersected a moderate deformation zone from 158 to 181m with local gouge faults; additional faulting from 233 to 242.5m. |
| PGC-26-015 | Moosehead Eastern Trend Northern Ext | Intersected interpreted extension of eastern trend structural zone with intermittent faulting between 125 to 132 m, numerous intervals of mafic dykes from 15m to 204m with localized pyrite mineralization. |
| PGC-26-016 | Regional Geophysical Target | Fine grained sedimentary units until 87m before entering conglomerate to 95m and mafic volcanic and intrusive units through 332m. Strong fault zone intersected from 196 to 198.5m. Intermittent pyrite mineralization throughout the volcanic units with arsenopyrite and pyrite from 137.8 to 138.3m. |
| PGC-26-017 | Moosehead Eastern Trend Northern Ext | Predominantly sandstone intersecting mafic dyke from 80 to 84.5m with arsenopyrite and pyrite mineralization along the upper margins, fault zone and mafic dyke intersected from 117.3 to 125.0m with localized pyrite mineralization interpreted Eastern Trend extension. |
| PGC-26-018 | Moosehead Eastern Trend Northern Ext | Intersected fault zones at 21, 25.4, 39.2, 50.6m downhole with 25cm brecciated quartz vein at 54.05m. |
| PGC-26-019 | Regional Geophysical Target | Mafic intrusive and volcanic units throughout drill hole. Strong faults noted at 57, 80, 93, 112.6, 207, 209m downhole; locally pyrite mineralization in volcanic units. |
| PGC-26-020 | Moosehead Western Trend | Intersected the Western Trend structural zone from 99.5 to 101.2m including several quartz veins up to 20cm in width, mineralization consists of boulangerite, pyrite. |
| PGC-26-021 | Moosehead Western Trend | Intersected the Western Trend structural zone from 117.4 to 120.1m including several quartz veins up to 40cm in width, mineralization consists of boulangerite, pyrite. |
| PGC-26-022 | Regional Geophysical Target | Deformation zone from 26 to 43m downhole; localized pyrite mineralization associated with altered mafic dykes. |
| PGC-26-023 | Moosehead Western Trend | Intersected the Western Trend structural zone from 73.0 to 76.8m including quartz veins up to 180cm in width, mineralization consists of sphalerite, boulangerite, pyrite, and visible gold. |
| PGC-26-024 | Moosehead Western Trend | Intersected the Western Trend structural zone from 133.0 to 138.3m mostly consists of quartz fractures and faulting mineralization consists of sphalerite and pyrite. |
| PGC-26-025 | Moosehead Eastern Trend Southern Ext | Intersected the Eastern Trend structural zone from 75.0 to 99.0m mostly consists of quartz fractures and minor faulting mineralization consists of sphalerite and pyrite. |
| PGC-26-026 | Moosehead Western Trend | Intersected the Western Trend structural zone from 146.0 to 167m including quartz veined zone from 146.9m to 149.9; mineralization consists of pyrite, boulangerite and visible gold. An additional quartz veined zone from 161.2 to162.5m; mineralization consists of pyrite, sphalerite, boulangerite and visible gold. |
| PGC-26-027 | Moosehead Eastern Trend Southern Ext | Intersected the Eastern Trend structural zone from 92.0 to 121.0m mostly consists of quartz fractures and minor faulting mineralization consists of pyrite and boulangerite. Quartz veined zone from 151.7 to 153.3, mineralization consists of pyrite and sphalerite. |
| PGC-26-028 | Moosehead Western Trend | Intersected new unnamed vein zone from 48.2 to 51.6m with individual stylolitic veins up to 30cm; mineralization consists of pyrite, boulangerite, chalcopyrite and visible gold. Intersected the Western Trend structural zone from 109.0 to 111.1m consists of quartz fracturing, mineralization includes pyrite. |
| PGC-26-029 | Moosehead Eastern Trend Southern Ext | Drilling stopped before reaching target. |
| PGC-26-031 | Moosehead Unnamed Vein Zone | Intersected new unnamed vein zone from 52.8 to 55.1m seen in PGC-26-028 with individual stylolitic veins up to 25cm; mineralization consists of pyrite, boulangerite, chalcopyrite and visible gold. |
| PGC-26-032 | Moosehead Unnamed Vein Zone | Intersected new unnamed vein zone from 73.7 to 74.3m seen in PGC-26-028 with quartz vein to 10cm; mineralization consists of pyrite and boulangerite. Intersected the Western Trend structural zone from 126.6 to 129.4m with veins up to 40cm, mineralization consists of pyrite, boulangerite and visible gold. |
| PGC-26-033 | Moosehead Unnamed Vein Zone | Intersected new unnamed vein zone from 41.0 to 46.8m seen in PGC-26-028 with individual veins up to 30cm; mineralization consists of pyrite, arsenopyrite, boulangerite and visible gold. |
Table 1 - Visual Observations of Drill Core from Hole PGC-25-009 through PGC-26-029 and Hole PGC-26-031 through PGC-26-033
The Company cautions that the presence of visible gold mineralization is not indicative of high gold assay grades and that drill core samples will or have been submitted to a certified laboratory for analysis of gold content. Assay values for the discussed intervals will be released when available. All intervals are downhole depths, and true widths are not known at this time.
| Drill Hole | Easting | Northing | Azimuth | Dip | Length (m) |
| PGC-25-009 | 613745 | 5428511 | 230 | -45 | 149 |
| PGC-25-010 | 614306 | 5429058 | 210 | -45 | 221 |
| PGC-25-011 | 613729 | 5428490 | 230 | -45 | 170 |
| PGC-25-012 | 613730 | 5428489 | 220 | -51 | 134 |
| PGC-25-013 | 613482 | 5428694 | 225 | -45 | 221 |
| PGC-25-014 | 612883 | 5428558 | 255 | -45 | 326 |
| PGC-26-015 | 613731 | 5428839 | 215 | -45 | 242 |
| PGC-26-016 | 615479 | 5430029 | 270 | -45 | 332 |
| PGC-26-017 | 613713 | 5429252 | 250 | -45 | 179 |
| PGC-26-018 | 613698 | 5428939 | 260 | -45 | 140 |
| PGC-26-019 | 615267 | 5429888 | 90 | -45 | 314 |
| PGC-26-020 | 613719 | 5428452 | 222 | -45 | 131 |
| PGC-26-021 | 613734 | 5428471 | 225 | -45 | 158 |
| PGC-26-022 | 615166 | 5429247 | 60 | -45 | 254 |
| PGC-26-023 | 613713 | 5428472 | 227 | 46 | 122 |
| PGC-26-024 | 613740 | 5428564 | 235 | 50 | 182 |
| PGC-26-025 | 613923 | 5428310 | 285 | 45 | 128 |
| PGC-26-026 | 613771 | 5428546 | 235 | -50 | 188 |
| PGC-26-027 | 613934 | 5428266 | 285 | -45 | 170 |
| PGC-26-028 | 613759 | 5428438 | 230 | 45 | 134 |
| PGC-26-029 | 613925 | 5428232 | 285 | 45 | 53 |
| PGC-26-031 | 613759 | 5428439 | 242 | -57 | 101 |
| PGC-26-032 | 613771 | 5428463 | 230 | -51 | 209 |
| PGC-26-033 | 613737 | 5428437 | 230 | 45 | 65 |
Table 2 - Drill Hole Information for PGC-25-009 through PGC-26-029 and Hole PGC-26-031 through PGC-26-033

Fig. 2 - Map Showing the Moosehead Mineralized Zones, Structural Corridor, Interpreted Faults and Regional Structural Drill Targets
To view an enhanced version of this graphic, please visit:
Pirate Gold Treasure Hunters Season 1 Episode 5 - Shots Fired
Episode 5 of Pirate Gold Treasure Hunters captures a turning point in the 2026 drill campaign, underscoring the persistence required in orogenic gold systems and the breakthroughs that follow. The episode features:
- Ongoing diamond drilling across regional targets and the launch of two high-resolution airborne magnetic and electromagnetic surveys
Step out drilling on the Moosehead Western Trend intersecting a new system, including visible gold in multiple holes Identification of a potential linkage structure between the Moosehead Eastern and Western Trends, expanding the target corridor along strike and at depth
Receipt of drill permits for Crippleback, located along the same regional structure as Moosehead and the Valentine Lake Mine
Cannot view this video? Visit:
Drill Core Featured in the Pirate Gold Treasure Hunters Video Series

Fig. 3 - Image of Drill Core from PGC-26-028 Showing Unnamed Newly Discovered Vein at Moosehead Located Between the Western and Eastern Trend Structures
To view an enhanced version of this graphic, please visit:
Mineral Claims Addition
- One additional mineral license purchase agreement has been executed to acquire 6 mineral claims covering 150 hectares
Pirate Gold has entered into an agreement with Newfoundland Gold Retriever Corp. ("NGRC"), to acquire a 100% interest in and to one mineral licence. In consideration the Company will, subject to TSX Venture Exchange ("TSXV") approval, make a one-time cash payment of $7,500 to NGRC and issue 150,000 common shares and grant a 1.0% NSR royalty, one-half of which may be repurchased by Pirate Gold for $500,000.
Drilling Permit Updates
On February 10th, the Company received an exploration approval for the Crippleback Lake area which under the Company is permitted to drill up to 50 holes. The Company anticipates the initial phase of the Crippleback Lake drilling program to start in late February with plans to follow up on its 2024 drilling program which outlined large areas of clay alteration and broad zones of copper-gold mineralization. Also on February 10th, the Company received an exploration approval for the Stony Lake area, 5 km south of Moosehead under which the Company is permitted to drill up to 40 holes. The Company anticipates it will begin drill testing the Stony Lake targets in Q1 2026.
Advertising & Sponsorship Agreement
The Company has entered into a one-year advertising and sponsorship agreement dated February 12, 2026, with Allan Barry Laboucan (Rocks & Stocks News), an independent media content creator. Pursuant to the agreement, the Company will pay total cash consideration of $160,000, for a one-year term. The engagement is for advertising, branding and independent media coverage purposes only and does not constitute investor relations or market-making services. The Company does not have editorial control over content produced by the contractor. The agreement may be terminated in accordance with its terms. The contractor is arm's length to the Company.
Qualified Person
Greg Matheson, P.Geo., VP Exploration for Pirate Gold, a "Qualified Person" under National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.
About Pirate Gold Corp.
Pirate Gold Corp. (TSXV: YARR) (OTCQB: SICNF) is led by an experienced management team and is the dominant explorer along the Valentine Lake Fault Zone in Newfoundland, Canada's newest gold district. The Company's primary focus is its 100% owned district-scale Treasure Island Gold Project, along with a portfolio of gold projects, including the district-scale Fleur de Lys Project.
For more information, please contact:
Denis Laviolette, Executive Chairman, CEO & Director
E: ...
Cathy Hume, VP Corporate Development & Director
T: 416-868-1079 x 251
E: ...
Website:
Twitter: @PirateGoldCorp
Facebook: @PirateGoldCorp
LinkedIn: @PirateGoldCorp
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Investors are cautioned that trading in the securities of the Company should be considered highly speculative. This news release contains "forward-looking statements" within the meaning of the applicable Canadian securities legislation that are based on expectations, estimates, assumptions, geological theories, and projections as at the date of this news release. The information in this news release about any information herein that is not a historical fact may be "forward-looking statements." Actual results may differ materially. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (which may, but not always, include phrases such as "anticipates", "plans", "scheduled", "believed" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) including statements regarding the Company's plans with respect to the Company's projects and the timing related thereto, the merits of the Company's projects, the Company's objectives, plans and strategies, and other matters are not statements of historical fact and may be forward-looking statements and are intended to identify forward-looking statements. Factors that may cause results to vary include delays in obtaining necessary approvals, changes in the market for the Company's securities, results of exploration, loss of title to properties, delays in obtaining permits or access to mineral properties, including as a result of adverse weather, fire or flood, changes to the Tax Act, rejection of expenditures as Qualifying Expenditures, and factors included in the documents filed from time to time with the Canadian securities regulatory authorities by Pirate Gold Corp. Pirate Gold Corp. will not update these forward-looking statements to reflect events or circumstances after the date hereof, except as required by law.
To view the source version of this press release, please visit
Source: Pirate Gold Corp.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.



Comments
No comment