Zephyr Provides Update
Also, the Company wishes to announce the retirement of Ms. Suzan Frazer as corporate secretary of the Company. Ms. Frazer has served as corporate secretary since the Company's inception in 2010. The Board wishes to extend its gratitude to Ms. Frazer and wishes her the very best in her retirement. Mr. David Felderhof, a director and Chief Financial Officer of the Company, will succeed Ms. Frazer as corporate secretary.
About Dawson Gold Property
The Dawson Gold Deposit hosts an Inferred Mineral Resource1 prepared in accordance with National Instrument 43-101 (" NI 43-101 ") of 343,000 tonnes grading 12.11 g/t for 133,500 ounces of gold at a 5 g/t cut-off with no top cut, and 116,300 ounces of gold at 10.55 g/t with a 40 g/t top cut. The estimate has an effective date of July 19, 2013. No updates to the resource estimate have been made to incorporate the results from drilling programs completed between 2017 and 2020 deposit is open at depth, with exploration potential to the east and west. A Preliminary Economic Assessment2 (" PEA ") was prepared in accordance with NI 43-101 with an effective date of March 21, 2017. Utilizing a gold price of $1,250/oz, the PEA showed robust economics with an all-in sustaining cost (" AISC ") per ounce of $692. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Given the substantial increase in the gold price since 2017, the attractiveness of the Dawson project has been significantly enhanced. The potential to expand resources is excellent at depth on the Dawson Gold Deposit, along strike to the east in the 700-metre-long Sentinel zone, which has not been drill tested, and through follow-up drilling of promising targets in the Windy Gulch and Windy Point zones to the west. The Dawson project features key attributes, including a small footprint associated with the proposed underground mine, ownership or control of all necessary lands by Zephyr, a climate that supports year-round operations, and nearby infrastructure and industrial support.
About Zephyr Minerals Ltd.
Zephyr Minerals is mission focused on obtaining a mining permit for its 100% owned Dawson Gold property in Colorado with the view to continuing to advance this project to the next stage of development. The Company continues to wait for the Zimbabwean Government to grant two Exclusive Prospecting Orders (" EPO "), covering 124,000 hectares applied for in 2021. The areas covered by the EPO applications are prospective for gold and lithium.
Notes
1 The Report is titled Resource Estimate Technical Report for the Dawson Property Fremont County, Colorado, USA, dated September 6, 2013, and was prepared for Zephyr by Andrew Hilchey, P.Geo., Mercator Geological Services Limited, Isobel Wolfson, M.Sc., P.Geo, and Mark Graves, P.Geo..
2 The report is entitled "National Instrument 43-101 Technical Report for the Dawson Property, Colorado, USA", effective March 21, 2017 (the "Technical Report"). The Technical Report was prepared by independent engineering firm, Golder Associates Ltd., with input from a number of other specialized and experienced consulting firms, and is in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects. This PEA is preliminary in nature and includes inferred mineral resources that are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There has been insufficient drilling to define the inferred resources as indicted or measured mineral resource; however, it is reasonable to expect that the inferred mineral resources could be upgraded to indicated and possibly measured resources with continued drilling. There is no guarantee that any part of the mineral resources discussed herein will be converted into a mineral reserve in the future.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment