Nexmetals Re-Assays Return 107 Metres Of 0.94% Cueq Including 0.99% Cueq Over 91 Metres Showing Sizeable Continuity Of Mineralization At Selkirk
HOLE ID | FROM (m) | TO (m) | 1 LENGTH (m) | Cu (%) | Ni (%) | Co (%) | Pd (ppm) | Pt (ppm) | Au (ppm) | 2 CuEq (%) |
DSLK018 | 18.00 | 30.60 | 12.60 | 0.24 | 0.19 | 0.01 | 0.36 | 0.07 | 0.03 | 0.61 |
DSLK018 | 74.00 | 132.60 | 58.60 | 0.27 | 0.26 | 0.01 | 0.50 | 0.12 | 0.05 | 0.78 |
incl. | 74.00 | 110.70 | 36.70 | 0.27 | 0.28 | 0.01 | 0.56 | 0.13 | 0.05 | 0.83 |
DSLK018 | 162.00 | 207.00 | 45.00 | 0.28 | 0.26 | 0.01 | 0.67 | 0.14 | 0.07 | 0.87 |
DSLK018 | 213.90 | 220.00 | 6.10 | 0.36 | 0.38 | 0.02 | 0.69 | 0.15 | 0.05 | 1.09 |
DSLK018 | 239.00 | 244.00 | 5.00 | 0.41 | 0.27 | 0.01 | 0.55 | 0.12 | 0.06 | 0.96 |
DSLK018 | 269.50 | 277.15 | 7.65 | 0.39 | 0.33 | 0.02 | 0.58 | 0.13 | 0.06 | 1.01 |
DSLK087 | 108.00 | 119.00 | 11.00 | 0.13 | 0.13 | 0.01 | 0.23 | 0.05 | 0.03 | 0.37 |
DSLK089 | 109.00 | 147.60 | 38.60 | 0.17 | 0.18 | 0.01 | 0.39 | 0.09 | 0.06 | 0.54 |
incl. | 109.00 | 123.00 | 14.00 | 0.19 | 0.21 | 0.01 | 0.45 | 0.11 | 0.08 | 0.62 |
and | 141.50 | 147.60 | 6.10 | 0.31 | 0.32 | 0.01 | 0.68 | 0.13 | 0.05 | 0.96 |
DSLK112 | 26.20 | 66.00 | 39.80 | 0.26 | 0.25 | 0.01 | 0.54 | 0.12 | 0.05 | 0.78 |
DSLK129 | 207.00 | 314.00 | 107.00 | 0.35 | 0.31 | 0.02 | 0.56 | 0.13 | 0.06 | 0.94 |
DSLK129 | 207.00 | 298.00 | 91.00 | 0.36 | 0.33 | 0.02 | 0.58 | 0.13 | 0.06 | 0.99 |
DSLK130 | 27.90 | 288.00 | 260.10 | 0.18 | 0.19 | 0.01 | 0.39 | 0.09 | 0.03 | 0.58 |
3 incl | 27.90 | 151.00 | 123.10 | 0.13 | 0.16 | 0.01 | 0.34 | 0.09 | 0.03 | 0.47 |
3 incl | 80.00 | 106.00 | 26.00 | 0.18 | 0.19 | 0.01 | 0.38 | 0.10 | 0.03 | 0.56 |
3 incl. | 165.00 | 183.00 | 18.00 | 0.24 | 0.26 | 0.01 | 0.53 | 0.11 | 0.04 | 0.76 |
and | 229.00 | 283.00 | 54.00 | 0.29 | 0.26 | 0.01 | 0.55 | 0.12 | 0.05 | 0.83 |
1Length refers to drillhole length and not true width.
2CuEq% calculated using the formula Cu% + Ni%*(55.605/53.913) + Pd g/t*(22.948/53.913) + Pt g/t*(14.891/53.913) using metal prices and recoveries listed in the 2025 Technical Report.
3Interval is outside MRE but inside the conceptualized pit.
Table 2: Drill Collar Information Selkirk Deposit
HOLE ID | 1 Easting | 1 Northing | 1 Elevation | Dip | Azimuth | Hole Length (m) |
DSLK018 | 575402.3 | 7642550.6 | 988.1 | -70 | 35 | 346.97 |
DSLK087 | 575540.4 | 7642983.1 | 997.8 | -70 | 35 | 189.23 |
DSLK089 | 575433.3 | 7642362.0 | 982.0 | -70 | 34 | 192.20 |
DSLK112 | 575666.4 | 7642840.2 | 998.0 | -55 | 311 | 182.45 |
DSLK129 | 575221.0 | 7642370.6 | 981.9 | -70 | 30 | 457.55 |
DSLK130 | 575266.2 | 7642332.3 | 981.0 | -86 | 155 | 384.48 |
1Coordinates are WGS84z35S with geoidal elevations
Technical Report
The MRE on the Selkirk Mine is supported by the Technical Reports entitled "NI 43-101 Technical Report Selkirk Nickel Project, North East District, Republic of Botswana", dated January 8, 2025 (with an effective date of November 1, 2024 and "NI 43-101 Technical Report, Selkirk Nickel Project, Northeast District, Republic of Botswana" dated April 12, 2023 (with an effective date of March 31, 2023). Reference should be made to the full text of the Technical Reports for the assumptions, qualifications and limitations set forth therein, which was prepared in accordance with NI 43-101 and Subpart 1300 of Regulation S-K and is available on SEDAR+ ( ) and EDGAR ( ), in each case, under NEXM's issuer profile.
Quality Control
Historic drill core samples are NQ (47.6 mm diameter) that were previously sawn in half. All current samples are 1⁄2 core samples that were previously retained for reference purposes. Samples are generally 1 metre in length and do not correspond to the historic sample intervals. Sample preparation and lab analysis was completed at ALS Chemex in Johannesburg, South Africa. Commercially prepared blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81).
Qualified Person
All scientific and technical information in this news release has been reviewed and approved by Sharon Taylor, VP Exploration of the Company, MSc, P.Geo, and a "qualified person" for the purposes of National Instrument 43-101 and Subpart 1300 of Regulation S-K.
About NexMetals Mining Corp.
NexMetals Mining Corp. is a mineral exploration and development company that is focused on the redevelopment of the previously producing copper, nickel and cobalt resources mines owned by the Company in the Republic of Botswana.
NexMetals is committed to governance through transparent accountability and open communication within our team and our stakeholders. NexMetals' team brings extensive experience across the full spectrum of mine discovery and development. Collectively, the team has contributed to dozens of projects, including work on the Company's Selebi and Selkirk mines. Senior team members each have on average, more than 20 years of experience spanning geology, engineering, operations, and project development.
For further information about NexMetals Mining Corp., please contact:
Morgan Lekstrom
CEO and Director
...
Jaclyn Ruptash
V.P., Communications and Investor Relations
...
Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Follow Us
X:
LinkedIn:
Facebook:
Cautionary Note Regarding Forward-Looking Statements
This news release contains forward-looking statements" within the meaning of the United States federal securities laws and "forward-looking information" within the meaning of applicable Canadian securities legislation (collectively, "forward-looking information") based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward-looking information includes, but is not limited to, the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selkirk Mine as currently contemplated; the Company's goal of validating legacy data and generating new intercepts to support an updated resource model; the Company's intention of completing an updated MRE; the release of metallurgical testing results and the expected timing thereof; anticipated upgrades to existing mineral resource estimates on the Selkirk Mine in accordance with NI 43-101; management's belief that historical resources could be indicative of the presence of mineralization on the deposits; and the anticipated benefits of the Company's approach to its resource development plan. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of drilling and metallurgical test results; the ability of exploration results to predict mineralization; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; prefeasibility or the feasibility of mine production; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's filings with the U.S. Securities and Exchange Commission on EDGAR ( ) and public disclosure record on SEDAR+ ( ), in each case, under NEXM's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
To view the source version of this press release, please visit
SOURCE: NexMetals Mining Corp.

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.
Most popular stories
Market Research

- Invromining Expands Multi-Asset Mining Platform, Launches New AI-Driven Infrastructure
- Superconducting Materials Market Size, Trends, Global Industry Overview, Growth And Forecast 2025-2033
- United States Lubricants Market Growth Opportunities & Share Dynamics 20252033
- Building Automation System Market Size, Industry Overview, Latest Insights And Forecast 2025-2033
- Brazil Edtech Market Size, Share, Trends, And Forecast 2025-2033
- Australia Automotive Market Size, Share, Trends, Growth And Opportunity Analysis 2025-2033
Comments
No comment