Azerbaijan's Kalbajar Taps Advanced Tech For New Small Hydropower Plants
Rasim Gasimov, Chief Engineer of AzerEnergy OJSC, said that the “Ashagi Vang” HPPs have capacities ranging from 3 to 8.6 megawatts, while the“Nadirkhanli” HPP has a capacity of 8.8 megawatts. To supply these stations with water, a primary intake was created at the confluence of the Lev River into the Tartar River, and a second intake at the confluence of the Tutqu River into the Tartar River.
The stations, equipped with modern technology, have been integrated into the country's centralized SCADA system. The environmentally friendly green energy produced by these plants is expected to provide electricity for around 25,000 people.
On August 21, President of the Republic of Azerbaijan Ilham Aliyev and First Lady Mehriban Aliyeva participated in the opening ceremony of the Ashagi Vang, Nadirkhanli, and Chaykend small hydropower plants operated by AzerEnerji OJSC in the village of Vang, Kalbajar district.

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.
Most popular stories
Market Research

- Seoul Exchange, One Of Only Two Licensed Platforms For Unlisted Securities, Will Exclusively Use Story To Settle Tokenized Rwas
- Phase 6 Reaches 50% Mark As Mutuum Finance (MUTM) Approaches Next Price Step
- 0G Labs Launches Aristotle Mainnet With Largest Day-One Ecosystem For Decentralized AI
- Solotto Launches As Solana's First-Ever Community-Powered On-Chain Lottery
- Kintsu Launches Shype On Hyperliquid
- Blockchainfx Raises $7.24M In Presale As First Multi-Asset Super App Connecting Crypto, Stocks, And Forex Goes Live In Beta
Comments
No comment