Drilling Resumes On Globex's Berrigan Zinc, Gold, Silver Royalty Property NW Of Chibougamau, Quebec
| Hole ID | From (m) | To (m) | Length (m) | ZnEq (%) | AuEq (g/t) | Au (g/t) | Ag (g/t) | Cu (%) | Zn (%) |
| TOM-25-009 | 156.70 | 204.75 | 48.05 | 5.82 | 1.36 | 1.12 | 7.55 | 0.04 | 1.40 |
| including | 156.70 | 159.60 | 2.90 | 33.97 | 7.96 | 6.76 | 40.24 | 0.19 | 7.57 |
| including | 163.95 | 169.00 | 5.05 | 3.42 | 0.80 | 0.41 | 11.35 | 0.03 | 1.43 |
| including | 181.70 | 182.90 | 1.20 | 12.25 | 2.87 | 2.36 | 19.50 | 0.03 | 2.89 |
| including | 189.20 | 194.60 | 5.40 | 19.07 | 4.47 | 3.75 | 16.35 | 0.08 | 4.81 |
| including | 196.00 | 198.60 | 2.60 | 2.06 | 0.49 | 0.43 | 5.28 | 0.06 | 0.11 |
| including | 204.00 | 204.70 | 0.70 | 37.71 | 8.85 | 8.71 | 9.20 | 0.05 | 6.01 |
| 230.35 | 236.80 | 6.45 | 1.23 | 0.29 | 0.14 | 1.23 | 0.03 | 0.67 | |
| including | 235.70 | 236.80 | 1.10 | 5.00 | 1.17 | 0.72 | 2.80 | 0.04 | 2.27 |
| 244.50 | 259.70 | 15.20 | 4.87 | 1.14 | 0.59 | 7.22 | 0.04 | 2.40 | |
| including | 254.60 | 257.15 | 2.55 | 22.75 | 5.29 | 2.24 | 32.07 | 0.15 | 13.42 |
| TOM-25-010 | 108.00 | 111.00 | 3.00 | 2.18 | 0.51 | 0.51 | 1.53 | 0.02 | 0.23 |
| 120.65 | 125.00 | 4.35 | 8.03 | 1.87 | 0.95 | 9.11 | 0.05 | 4.26 | |
| including | 121.95 | 125.00 | 3.05 | 8.30 | 1.93 | 0.84 | 10.56 | 0.06 | 4.86 |
| 130.70 | 179.00 | 48.30 | 2.38 | 0.56 | 0.30 | 4.11 | 0.04 | 1.06 | |
| including | 135.75 | 142.00 | 6.25 | 11.43 | 2.66 | 1.63 | 16.13 | 0.09 | 4.79 |
| including | 144.80 | 149.00 | 4.20 | 2.01 | 0.47 | 0.12 | 4.68 | 0.04 | 1.31 |
| including | 158.30 | 159.35 | 1.05 | 3.73 | 0.87 | 0.16 | 5.93 | 0.10 | 2.73 |
| including | 175.50 | 177.70 | 2.20 | 4.11 | 0.96 | 0.79 | 3.57 | 0.04 | 1.04 |
| TOM-25-011 | 291.00 | 309.50 | 18.50 | 1.81 | 0.42 | 0.31 | 1.97 | 0.01 | 0.60 |
| including | 295.90 | 296.40 | 0.50 | 4.83 | 1.12 | 0.42 | 5.40 | 0.04 | 3.10 |
| including | 307.50 | 309.50 | 2.00 | 16.12 | 3.77 | 2.63 | 9.47 | 0.05 | 4.30 |
| 341.00 | 342.00 | 1.00 | 2.83 | 0.65 | 0.07 | 1.00 | 0.02 | 2.59 | |
| 344.10 | 345.00 | 0.90 | 4.69 | 1.09 | 0.39 | 3.50 | 0.04 | 3.16 | |
| TOM-25-012 | 283.85 | 285.00 | 1.15 | 5.51 | 1.31 | 0.71 | 4.10 | 0.88 | 0.02 |
| TOM-25-013 | No significant value | ||||||||
| TOM-25-014 | 185.00 | 187.10 | 2.10 | 24.85 | 5.83 | 4.94 | 56.44 | 0.05 | 4.55 |
| 238.70 | 239.85 | 1.15 | 20.86 | 4.86 | 2.63 | 22.20 | 0.16 | 10.40 | |
| 251.20 | 252.60 | 1.40 | 36.34 | 8.51 | 7.44 | 37.30 | 0.06 | 8.04 | |
| 405.30 | 406.70 | 1.40 | 13.68 | 3.17 | 1.13 | 13.15 | 0.07 | 9.25 | |
| 423.30 | 426.30 | 3.00 | 2.15 | 0.50 | 0.07 | 5.45 | 0.05 | 1.57 | |
| 451.50 | 457.50 | 6.00 | 1.22 | 0.28 | 0.08 | 3.45 | 0.01 | 0.79 | |
| TOM-25-015 | 132.55 | 141.00 | 8.45 | 3.73 | 0.87 | 0.51 | 5.51 | 0.03 | 1.66 |
| 155.70 | 157.70 | 2.00 | 28.08 | 6.56 | 4.66 | 26.90 | 0.07 | 10.29 | |
| 182.10 | 202.20 | 20.10 | 2.20 | 0.51 | 0.36 | 3.20 | 0.03 | 0.77 | |
| 451.20 | 549.70 | 98.50 | 5.08 | 1.19 | 0.82 | 3.21 | 0.04 | 1.98 | |
| including | 452.20 | 457.10 | 4.90 | 23.20 | 5.44 | 4.69 | 18.80 | 0.29 | 4.79 |
| and including | 500.35 | 549.70 | 49.35 | 6.46 | 1.51 | 0.90 | 3.48 | 0.03 | 3.13 |
| including | 521.00 | 535.60 | 14.60 | 9.07 | 2.11 | 1.34 | 5.91 | 0.04 | 4.12 |
| including | 537.85 | 541.10 | 3.25 | 9.00 | 2.09 | 0.88 | 3.85 | 0.05 | 5.82 |
| including | 542.00 | 548.20 | 6.20 | 13.39 | 3.12 | 1.63 | 5.26 | 0.05 | 7.43 |
Notes: (Source TomaGold Press Release: TomaGold Starts Drilling at Berrigan Mine, March31, 2026)
- The reported widths represent core lengths. True width is estimated to be approximately 80-85% of the core length, depending on the deviation angles. ZnEq and AuEq are calculated using the Company's standard parameters. AuEq calculation was based on US$4,150/oz Au, $51.34/oz Ag, US$5.023/lb Cu and $1.392/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023),applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper. ZnEq calculation was based on US$4,047/oz Au, $50.22/oz Ag, US$4.796/lb Cu and $1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) / 10,000, applying metallurgical recovery factors of 95% for zinc, 85% for gold and silver, and 90% for copper, based on a metallurgical report on Berrigan Mine zinc material prepared by Process Research Associates Ltd. in February 2002 and on recoveries from nearby deposits for gold, silver and copper.
TomaGold has released two graphics which illustrate the drill target and proposed drill hole extensions.
TomaGold 1,500-metre Phase 2 drilling program aimed at testing the newly
discovered Berrigan Deep Zone
TomaGold 1,500-metre Phase 2 drilling program aimed at testing the
newly discovered Berrigan Deep Zone
TomaGold's press release, TomaGold Starts Drilling at Berrigan Mine dated March 31, 2026, may be accessed by clicking here.
This press release was prepared by Jack Stoch, P. Geo., Executive Chairman and CEO of Globex Mining Enterprises Inc. in his capacity as a Qualified Person (Q.P.) under NI 43-101.
| We Seek Safe Harbour. | Foreign Private Issuer 12g3 – 2(b) |
| CUSIP Number 379900 50 9 LEI 529900XYUKGG3LF9PY95 | |
| For further information, contact: | |
| Jack Stoch, P.Geo., Chairman & CEO Globex Mining Enterprises Inc. 120 Carlton Street, Unit 219 Toronto, Ontario, Canada M5A 4K2 | Tel.: 819.797.1470 ... |
Forward-Looking Statements: Except for historical information, this news release may contain certain“forward-looking statements”. These statements may involve a number of known and unknown risks and uncertainties and other factors that may cause the actual results, level of activity and performance to be materially different from the expectations and projections of Globex Mining Enterprises Inc. (“Globex”). No assurance can be given that any events anticipated by the forward-looking information will transpire or occur, or if any of them do so, what benefits Globex will derive therefrom. A more detailed discussion of the risks is available in the“Annual Information Form” filed by Globex on.
Photos accompanying this announcement are available at:
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.


Comments
No comment