Maxus Mining Reports On Exploration Insights At The Lotto Project In British Columbia
| Drillhole | Highlighted Interval | Host Rock |
| DDH 3 | 0.37% Cu; 0.17% Mo; 10.3 ppm Ag over 0.3 m | Andesite |
| DDH 6 | 0.38% Cu; 0.011% Mo; 27.43 ppm Ag over 4.57 m | Syenite Porphyry |
| DDH 6 | 0.035% Mo over 3.05m | Breccia Zone |
| DDH 7 | 0.15% MoS2 over including 0.36% MoS2 over 15.24m | Breccia Zone in Syenite Porphyry |
Reference 2: ARIS 5197. Sellmer, H.W. and DePaoli, G.M., 1974. 1973 Geological, Geochemical, and Geophysical Assessment Report
Loto 3 Historical Highlights
Historical mapping on the Project outlined a 10-metre-wide zone of quartz veining hosting varying amounts of scheelite mineralization. Additionally, a historical pit about 60 m north of the quartz zone also contains samples containing notable scheelite mineralization. One sample collected from this pit (Pit Sample; Table 2), assayed 10.97% tungsten oxide (WO3).
Table 2: Loto 3 Assay Highlights
| Sample | Rock Type | Easting | Northing | WO3 (%) |
| PIT | Alaskite Skarn | 432286 | 5458044 | 10.97 |
Reference 1: ARIS 8187. Paszty, S., 1980. Assessment Report of Loto #3 Claim, Nancy Greene Lake, B.C.
Figure 2: Lotto Project Historic Highlights Map
Qualified Person Statement
The scientific and technical information contained in this news release has been reviewed, verified, and approved by Morgan Verge, P.Geo., Technical Advisor of the Company and a“qualified person” as defined in NI 43-101 – Standards of Disclosure for Mineral Projects. Ms. Verge has examined information regarding the historical exploration at the Project, which includes a review of the historical sampling, analytical, and procedures underlying the information and opinions contained herein.
Management cautions that historical results collected and reported by operators unrelated to Maxus have not been verified nor confirmed by its Qualified Person; however, the historical results create a scientific basis for ongoing work at the Project.
References
1 ARIS 8187. Paszty, S., 1980. Assessment Report of Loto #3 Claim, Nancy Greene Lake, B.C.
2 ARIS 5197. Sellmer, H.W. and DePaoli, G.M., 1974. 1973 Geological, Geochemical, and Geophysical Assessment Report
3 ARIS 4236. Veerman, H., 1973. Geochemical Report on the Deer 27 and Deer 28 Mineral Claims Located 30 Miles West of Castlefar, B.C. at the Headwaters of Shield Creek in the Trail Creek Mining Division.
†NI 43-101 - Technical Report on the Penny Property British Columbia, NTS 82G/12 49° 55° North Latitude -115° 90° West Longitude, Derrick Strickland P.Geo., August 14, 2024.
‡Open File 1992-11, Map Number 10.
§ MILFILE No: 082FSW228 – Loto 3, 1980 Grab Sample –
¶ Equinox Resources – November 8, 2024, 'Ultra High Grade Naturally Occurring Antimony at Alturas Project with Assays up to 69.98% Sb' –
‖ Endurance Summarizes Antimony Results From The Reliance Gold Project, BC - Best Intervals Include 19.2% Antimony And 2.16 ppm Au Over 0.5 m In 2024 Drilling – February 24, 2025 -
A bout Maxus Mining Inc.
Maxus Mining Inc. (CSE: MAXM | FRA: R7V) is a mineral exploration company focused on locating, acquiring, and if warranted, developing economic mineral properties in premier jurisdictions. The Company is working towards progressing its diverse portfolio of exploration properties which now includes approximately 15,098 hectares of prospective terrane comprising 8,920 hectares amongst three antimony projects, 3,123 hectares encompassing the Penny Copper Project & the remaining 3,054 hectares comprising the Lotto Tungsten Project.
The Penny Copper Project covers approximately 3,123 hectares and has seen exploration activity throughout the last 100+ years with recent work including rock sampling and minor geological mapping†. The Penny Copper Project is located near the major past producing Sullivan Mine at Kimberley, British Columbia, an area that has stimulated both junior and major exploration company activities in the past year. Additionally, the Penny Copper Project saw a 2017 work program return 17 grab samples, which returned copper values up to 1,046 ppm Cu (TK17-149c), 1,808 ppm Cu (TK17-28) and 2,388 ppm Cu (TK17-12)†.
At the Quarry Antimony Project, in well-established British Columbia, Canada, one historical sample taken assayed 0.89 ppm Au, 3.8% Cu, 0.34% Zn, 42.5% Pb, and 0.65% ppm Ag and 20% Sb‡. A selected grab sample taken in 1980 at the Lotto Tungsten Project from a quartz vein with scheelite assayed 10.97% WO3§. Additionally, the Alturas and Hurley Antimony projects are strategically positioned; Alturas Project had a recent antimony discovery which saw high-grade naturally occurring antimony with assays up to 69.98% Sb¶; Hurley neighbours Endurance Gold Corp.'s Reliance Gold Project which saw antimony results from 2024 work programs include 19.2% Sb and 2.16 ppm Au over 0.5 m encountered during the 2024 drilling program‖.
On Behalf of the Board of Directors
Scott Walters
Chief Executive Officer, Director
+1 (778) 374-9699
...
Disclaimer for Forward-Looking Information
This news release includes certain“Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and“forward-looking information” under applicable Canadian securities laws. When used in this news release, the words“anticipate”,“believe”,“estimate”, expect”,“target”,“plan”,“forecast”,“may”,“would”,“could”,“schedule” and similar words or expressions, identify forward-looking statements or information.
Forward-looking statements and forward-looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of Maxus', future growth potential for Maxus and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of copper, gold, tungsten, antimony and other metals; costs of exploration and development; the estimated costs of development of exploration projects; Maxus' ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
This news release contains“forward-looking information” within the meaning of the Canadian securities laws. Statements, other than statements of historical fact, may constitute forward looking information and include, without limitation, statements with respect to the Project and its mineralization potential; the Company's objectives, goals, or future plans with respect to the Project; further exploration work on the Project in the future. With respect to the forward-looking information contained in this news release, the Company has made numerous assumptions regarding, among other things, the geological, metallurgical, engineering, financial and economic advice that the Company has received is reliable and are based upon practices and methodologies which are consistent with industry standards. While the Company considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies. Additionally, there are known and unknown risk factors which could cause the Company's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: fluctuations in commodity prices and currency exchange rates; uncertainties relating to interpretation of well results and the geology, continuity and grade of copper, gold, tungsten, antimony and other metal deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the exploration and development of properties and the issuance of required permits; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs or in construction projects and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals; increased costs and restrictions on operations due to compliance with environmental and other requirements; increased costs affecting the metals industry and increased competition in the metals industry for properties, qualified personnel, and management. All forward-looking information herein is qualified in its entirety by this cautionary statement, and the Company disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.
The Canadian Securities Exchange (CSE) does not accept responsibility for the adequacy or accuracy of this release.
Photos accompanying this announcement are available at:
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.


Comments
No comment