Orezone Intercepts High-Grade Mineralization Below North Zone Life Of Mine Pits Including 2.55 G/T Gold Over 23.00M And 1.14 G/T Gold Over 29.50M
| Hole | Easting | Northing | Elevation | Dip | Azimuth | EOH (m) | From (m) | To (m) | Length (m) | Grade (g/t Au) | Type |
| BBD1315 | 729390 | 1354119 | 282 | -51 | 313 | 414 | 322.00 | 325.00 | 3.00 | 0.70 | HR |
| and | 336.00 | 345.00 | 9.00 | 1.06 | HR | ||||||
| and | 363.00 | 368.00 | 5.00 | 1.02 | HR | ||||||
| and | 386.30 | 393.00 | 6.70 | 1.40 | HR | ||||||
| BBD1316 | 729160 | 1354057 | 286 | -52 | 313 | 300 | 188.00 | 191.00 | 3.00 | 0.69 | HR |
| and | 271.00 | 282.60 | 11.60 | 0.78 | HR | ||||||
| and | 292.00 | 293.00 | 1.00 | 2.68 | HR | ||||||
| BBD1317 | 729234 | 1353990 | 284 | -51 | 313 | 429 | 14.00 | 18.00 | 4.00 | 0.44 | OX |
| and | 20.80 | 24.20 | 3.40 | 1.02 | OX | ||||||
| and | 45.50 | 48.60 | 3.10 | 0.37 | OX | ||||||
| and | 65.00 | 75.00 | 10.00 | 0.75 | OX | ||||||
| and | 303.00 | 314.00 | 11.00 | 0.95 | HR | ||||||
| and | 328.00 | 339.00 | 11.00 | 0.75 | HR | ||||||
| and | 380.10 | 387.40 | 7.30 | 1.53 | HR | ||||||
| incl. | 382.25 | 387.40 | 5.15 | 1.92 | HR | ||||||
| and | 398.00 | 401.00 | 3.00 | 1.73 | HR | ||||||
| BBD1318 | 729062 | 1354011 | 284 | -56 | 312 | 317 | 167.20 | 177.00 | 9.80 | 1.59 | HR |
| and | 254.00 | 269.00 | 15.00 | 1.80 | HR | ||||||
| incl. | 261.00 | 267.90 | 6.90 | 2.52 | HR | ||||||
| and | 286.00 | 287.00 | 1.00 | 2.95 | HR | ||||||
| BBD1319 | 729009 | 1353921 | 282 | -53 | 313 | 330 | 282.00 | 300.70 | 18.70 | 1.01 | HR |
| incl. | 293.70 | 300.70 | 7.00 | 1.23 | HR | ||||||
| and | 305.65 | 309.75 | 4.10 | 1.29 | HR | ||||||
| and | 318.00 | 323.00 | 5.00 | 1.04 | HR | ||||||
| BBD1320 | 729492 | 1354296 | 289 | -56 | 312 | 321 | 88.00 | 93.30 | 5.30 | 1.55 | HR |
| and | 259.00 | 288.50 | 29.50 | 1.14 | HR | ||||||
| incl. | 261.50 | 266.00 | 4.50 | 2.30 | HR | ||||||
| and | 275.00 | 281.20 | 6.10 | 1.93 | HR | ||||||
| BBD1322 | 729569 | 1354228 | 289 | -55 | 311 | 456 | 5.50 | 9.80 | 4.30 | 0.56 | OX |
| and | 58.15 | 61.50 | 3.35 | 0.47 | OX | ||||||
| and | 364.00 | 367.00 | 3.00 | 0.75 | HR | ||||||
| and | 391.00 | 402.00 | 11.00 | 0.95 | HR | ||||||
| and | 409.00 | 415.85 | 6.85 | 1.69 | HR | ||||||
| incl. | 411.90 | 414.80 | 2.90 | 3.07 | HR | ||||||
| BBD1323 | 729136 | 1353944 | 282 | -56 | 311 | 429 | 4.50 | 6.75 | 2.25 | 0.86 | OX |
| and | 12.80 | 15.10 | 2.30 | 0.54 | OX | ||||||
| and | 209.00 | 211.00 | 2.00 | 24.74 | HR | ||||||
| and | 244.25 | 247.00 | 2.75 | 0.99 | HR | ||||||
| and | 364.00 | 387.80 | 23.80 | 1.20 | HR | ||||||
| incl. | 371.00 | 375.00 | 4.00 | 1.79 | HR | ||||||
| and | 391.30 | 394.00 | 2.70 | 0.96 | HR | ||||||
| BBD1324 | 728995 | 1353667 | 280 | -52 | 310 | 312 | 20.20 | 23.20 | 3.00 | 1.23 | OX |
| and | 193.00 | 216.00 | 23.00 | 2.55 | HR | ||||||
| incl. | 196.00 | 201.00 | 5.00 | 5.54 | HR | ||||||
| and | 277.95 | 280.00 | 2.05 | 0.91 | HR | ||||||
| and | 382.00 | 385.00 | 3.00 | 2.42 | HR | ||||||
| BBD1325 | 728983 | 1353576 | 276 | -54 | 311 | 381 | 233.00 | 237.00 | 4.00 | 1.94 | HR |
| incl. | 235.00 | 236.00 | 1.00 | 5.40 | HR | ||||||
| and | 243.00 | 248.00 | 5.00 | 1.46 | HR | ||||||
| BBD1326 | 729674 | 1354502 | 286 | -52 | 314 | 335 | 6.00 | 8.15 | 2.15 | 0.71 | OX |
| and | 189.00 | 191.00 | 2.00 | 5.42 | HR | ||||||
| and | 253.00 | 254.00 | 1.00 | 2.11 | HR | ||||||
| BBD1327 | 728991 | 1353806 | 281 | -51 | 312 | 468 | 13.50 | 17.50 | 4.00 | 0.54 | OX |
| and | 21.60 | 23.80 | 2.20 | 1.38 | OX | ||||||
| and | 33.55 | 34.50 | 0.95 | 1.48 | OX | ||||||
| and | 360.00 | 362.00 | 2.00 | 0.99 | HR | ||||||
| and | 372.20 | 373.10 | 0.90 | 8.81 | HR | ||||||
| and | 384.70 | 396.00 | 11.30 | 0.86 | HR | ||||||
| BBD1328 | 728976 | 1353684 | 281 | -51 | 313 | 282 | 24.00 | 31.75 | 7.75 | 0.58 | OX |
| and | 59.25 | 63.90 | 4.65 | 0.46 | OX | ||||||
| and | 172.20 | 173.10 | 0.90 | 5.53 | HR | ||||||
| and | 210.25 | 212.15 | 1.90 | 2.44 | HR | ||||||
| and | 253.60 | 257.55 | 3.95 | 1.39 | HR |
True widths for North Zone drilling are approximately 85% of drilled lengths.
HR – Hard Rock, OX - Oxide
About Orezone Gold Corporation
Orezone Gold Corporation (TSX: ORE OTCQX: ORZCF) is a West African gold producer engaged in mining, developing, and exploring its flagship Bomboré Gold Mine in Burkina Faso. The Bomboré mine achieved commercial production on its oxide operations on December 1, 2022, and is now focused on its staged hard rock expansion that is expected to materially increase annual and life-of-mine gold production from the processing of hard rock mineral reserves. Orezone is led by an experienced team focused on social responsibility and sustainability with a proven track record in project construction and operations, financings, capital markets and M&A.
The technical report entitled Bomboré Phase II Expansion, Definitive Feasibility Study is available on SEDAR+ and the Company's website.
Contact Information
Patrick Downey
President and Chief Executive Officer
Vanessa Pickering
Manager, Investor Relations
Tel: 1 778 945 8977 / Toll Free: 1 888 673 0663
... /
For further information please contact Orezone at +1 (778) 945 8977 or visit the Company's website at .
The Toronto Stock Exchange neither approves nor disapproves the information contained in this news release.
QUALIFIED PERSON
Alastair Gallaugher (CGeol), Exploration Manager for Orezone, is the Qualified Persons under NI 43-101 and has reviewed and approved the scientific and technical information contained in this news release.
QA/QC
The mineralized intervals are based on a lower cut-off grade of 0.28g/t in the Oxide+Upper Transition zone, and 0.45g/t Au in the Lower Transition+Hard Rock zone. The true width of the mineralization is approximately 85% of the drill length in the North Zone. The half-core drilling samples were cut using a diamond saw by Orezone employees. The samples were prepared by BIGS Global Burkina s.a.r.l. (“BIGS Global”) and then split by Orezone to 1 kg using Rotary Sample Dividers (“RSDs”). A 1-kg aliquot was analyzed for leachable gold at BIGS Global in Ouagadougou, by bottle-roll cyanidation using a LeachWellTM catalyst. The leach residues from all samples with a leach grade greater than or equal to 0.25g/t Au were prepared by BIGS Global and then split by Orezone to 50 g using RSDs. A 50-g aliquot was analyzed by fire assay at BIGS Global.
Orezone employs a rigorous Quality Control Program including a minimum of 10% standards, blanks and duplicates. The composite width and grade include the final leach residue assay results for most of the drill intercepts reported.
Cautionary Note Regarding Forward-Looking Statements
This press release contains certain information that may constitute“forward-looking information” within the meaning of applicable Canadian Securities laws and“forward-looking statements” within the meaning of applicable U.S. securities laws (together,“forward-looking statements”). Forward-looking statements are frequently characterized by words such as“plan”,“expect”,“project”,“intend”,“believe”,“anticipate”,“estimate”,“potential”,“possible” and other similar words, or statements that certain events or conditions“may”,“will”,“could”, or“should” occur.
Forward-looking statements in this press release include, but are not limited to, statements with respect to the exploration program (including the significant exploration upside at Bomboré, and the potential to materially expand the project's resource base from the current global 5.13 million gold ounces, to a targeted 7 to 10 million gold ounces longer term; implications of extending the current life of mine pits to depth, and increasing the project's production profile; the potential with subsequent infill drilling to materially extend the North Zone Footwall resource and reserve pits to depth; opportunities to extend the mineralized system at depth across the greater 14km long reserve defined trend; the belief that the higher-grade sub-zones may host the potential to transition into underground mining beneath the existing open pits and that this is a well demonstrated mine sequence in-country, and if successful, would not only serve to increase the operating head grade at Bomboré, but also increase the overall production profile; and historical drilling supporting P16 and P17S deposits' down plunge continuity of the high-grade sub-zones, the potential for limb extensions to the East and West and repeats of the system along strike); the potential expansion of mineral reservices and resources; exploration activities; interpretations of drilling results; future production; project development timelines (including the ongoing production expansion being ahead of schedule); and anticipated economic benefits.
All such forward-looking statements are based on certain assumptions and analyses made by management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management and the qualified persons believe are appropriate in the circumstances.
All forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements including, but not limited to, delays caused by pandemics, terrorist or other violent attacks (including cyber security attacks), the failure of parties to contracts to honour contractual commitments, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts to perform as agreed; social or labour unrest; changes in commodity prices; unexpected failure or inadequacy of infrastructure, the possibility of unanticipated costs and expenses, accidents and equipment breakdowns, political risk, unanticipated changes in key management personnel and general economic, market or business conditions, the failure of exploration programs, including drilling programs, to deliver anticipated results and the failure of ongoing and uncertainties relating to the availability and costs of financing needed in the future, and other factors described in the Company's most recent annual information form and management discussion and analysis filed on SEDAR+. Readers are cautioned not to place undue reliance on forward-looking statements.
Although the forward-looking statements contained in this press release are based upon what management of the Company believes are reasonable assumptions, the Company cannot assure investors that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this press release and are expressly qualified in their entirety by this cautionary statement. Subject to applicable securities laws, the Company does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this press release.
Photos accompanying this announcement are available at

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.






Comments
No comment