Cartier Increases Resources Of Chimo Mine Project To 720,000 Oz Indicated And To 1,633,000 Oz Inferred
Highlights :
- The new resource estimate consists of ( FIGURE ):
- 7,128,000 tonnes at an average grade of 3.14 g/t Au for a total of 720,000 ounces of gold in the Indicated category and;
- 18,475,000 tonnes at an average grade of 2.75 g/t Au for a total of 1,633,000 ounces of gold in the Inferred category.
- 7,128,000 tonnes at an average grade of 3.14 g/t Au for a total of 720,000 ounces of gold in the Indicated category and;
- Work in progress, with the objective to increasing the resources, are as follows:
- A drill program in progress on the Chimo Mine Gold System ( FIGURE 2 ), with a dimension known to date of 3.7 km x 1.6 km, which includes the recent acquisition of the West Nordeau and et West Simon deposits ;
- Preliminary Economic Study NI 43-101 (''PEA'') underway on the combined resources of the Mine Chimo property and the West Nordeau deposit which will provide increased flexibility to further strengthen the economics of the Mine Chimo project;
- Integration of the results of the industrial sorting tests of Corem and Steinert US which increase by 170% the grade of the mineralization of the Chimo Mine property;
- Evaluation of the potential of the gold intersections discovered to date peripheral to the Chimo Mine Gold System over a length of 10 km along the Larder Lake - Cadillac fault.
- A drill program in progress on the Chimo Mine Gold System ( FIGURE 2 ), with a dimension known to date of 3.7 km x 1.6 km, which includes the recent acquisition of the West Nordeau and et West Simon deposits ;
VAL-D'OR, Quebec, Aug. 30, 2022 (GLOBE NEWSWIRE) -- Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) announces the results of its fourth mineral resource estimate for the Chimo Mine Gold System, located 45 km east of Val-d'Or. The estimate, completed and made available on the effective date of August 22, 2022, was carried out by MM. Vincent Nadeau-Benoit, P.Geo., and Alain Carrier, P.Geo., M.Sc. from the firm InnovExplo Inc.; Independent Qualified Persons within the meaning of NI 43-101.
“The results of the efforts primarily in drilling and resource estimates are intended to be integrated as quickly as possible into the preliminary economic studies of the Chimo Mine project to demonstrate its economic viability.” commented Philippe Cloutier, President and CEO.
The recent acquisition of the West Nordeau deposit, within 450 m of the resources of the Chimo Mine property, makes it possible to integrate all the resources with common characteristics with a reasonable prospect of possible economic extraction.
The mineralization of the Chimo Mine Gold System consists of 28 gold zones that are part of 19 gold structures, themselves grouped into 3 gold corridors. The NI 43-101 resources in effect as of August 22, 2022 for this gold system, combining the resources of the Chimo Mine property with those of the West Nordeau deposit, are presented below. ( FIGURE 1 ):
| Gold Corridor Cut-off Grade (g/t Au) | Indicated Resources | Inferred Resources | ||||
| Metric Tonnes ( t ) | Grade ( g/t Au ) | Troy Ounces ( oz Au ) | Metric Tonnes ( t ) | Grade ( g/t Au ) | Troy Ounces ( oz Au ) | |
| North Gold Corridor (>2,0) | 1,119,000 | 3.85 | 139,000 | 1,714,000 | 3.54 | 195,000 |
| Central Gold Corridor (>1,5) | 5,565,000 | 2.96 | 529,000 | 14,812,000 | 2.56 | 1,221,000 |
| South Gold Corridor (>2,0) | 444,000 | 3.61 | 52,000 | 1,949,000 | 3.47 | 217,000 |
| Total | 7,128,000 | 3.14 | 720,000 | 18,475,000 | 2.75 | 1,633,000 |
The NI 43-101 gold resources, effective as of August 22, 2022, for the West Nordeau deposit are presented below:
| Gold Corridor Cut-off Grade (g/t Au) | Indicated Resources | Inferred Resources | ||||
| Metric Tonnes ( t ) | Grade ( g/t Au ) | Troy Ounces ( oz Au ) | Metric Tonnes ( t ) | Grade ( g/t Au ) | Troy Ounces ( oz Au ) | |
| North Gold Corridor (>2,0) | - | - | - | 151,000 | 3.50 | 17,000 |
| Central Gold Corridor (>1,5) | 512,000 | 2.19 | 36,000 | 3,084,000 | 2.60 | 258,000 |
| Total | 512,000 | 2.19 | 36,000 | 3,235,000 | 2.64 | 275,000 |
The NI 43-101 gold resources, effective as of August 22, 2022, for the Chimo Mine property are presented below:
| Gold Corridor Cut-off Grade (g/t Au) | Indicated Resources | Inferred Resources | ||||
| Metric Tonnes ( t ) | Grade ( g/t Au ) | Troy Ounces ( oz Au ) | Metric Tonnes ( t ) | Grade ( g/t Au ) | Troy Ounces ( oz Au ) | |
| North Gold Corridor (>2,0) | 1,119,000 | 3.85 | 139,000 | 1,563,000 | 3.54 | 178,000 |
| Central Gold Corridor (>1,5) | 5,053,000 | 3.03 | 493,000 | 11,728,000 | 2.55 | 963,000 |
| South Gold Corridor (>2,0) | 444,000 | 3.61 | 52,000 | 1,949,000 | 3.47 | 217,000 |
| Total | 6,616,000 | 3.21 | 684,000 | 15,240,000 | 2.77 | 1,358,000 |
Additional notes on the resource estimate
- Gold price of US $ 1,612 / oz;
- Exchange rate of US $ 1.34 / CAD $ per troy ounce;
- Costs relating to the Central Gold Corridor for:
- Definition drilling of CAD $ 3 / t;
- Development, mining, transport and milling of CAD $ 50.75 / t;
- Environmental restoration of CAD $ 0.75 / t;
- Definition drilling of CAD $ 3 / t;
- Costs relating to the North and South Gold Corridors for:
- Definition drilling of CAD $ 6 / t;
- Development, mining, transport and milling of CAD $ 75.50 / t ;
- Environmental restoration of CAD $ 1.50 / t;
- For the Chimo Mine property: Triple Flag Precious Metals royalty cost of CAD $ 20.96 / troy ounce;
- For the West Nordeau deposit: Globex Mining Enterprises Inc. royalty cost of CAD $ 64.80 / troy ounce;
- General and administrative costs of 12 $ CAD / t.
The estimate of the West Nordeau deposit was made from a database consisting, as of July 12, 2022, of 154 drill holes totaling 55,097 m drilled, 6,873 deviation measurements as well as 18,973 samples analyzed for the gold and collected over a core length of 19,785 m representing 36% of the core length drilled. This database contains 820 blank and standard samples, inserted for QA/QC by previous operators: Chalice Gold Mines Limited and O3 Mining Inc. between March 11, 2017 and March 17, 2020. This database was validated before starting the resource estimate. The estimate was carried out on 8 mineralized structures, intersected by 4,982 m of drilling, having produced 802 different gold intersections.
| Cut-off Grade (g/t Au) | North Gold Corridor | Central Gold Corridor | South Gold Corridor | ||||||
| Metric Tonnes (t) | Grade (g/t Au) | Troy Ounces (oz Au) | Metric Tonnes (t) | Grade (g/t Au) | Troy Ounces (oz Au) | Metric Tonnes (t) | Grade (g/t Au) | Troy Ounces (oz Au) | |
| INDICATED RESOURCES | |||||||||
| 1.0 | 2,311,000 | 2.64 | 196,000 | 8,105,000 | 2.41 | 627,000 | 843,000 | 2.62 | 71,000 |
| 1.5 | 1,607,000 | 3.21 | 166,000 | 5,565,000 | 2.96 | 529,000 | 630,000 | 3.06 | 62,000 |
| 2.0 | 1,119,000 | 3.85 | 139,000 | 3,856,000 | 3.49 | 433,000 | 444,000 | 3.61 | 52,000 |
| 2.5 | 785,000 | 4.52 | 114,000 | 2,725,000 | 4.03 | 353,000 | 293,000 | 4.25 | 40,000 |
| INFERRED RESOURCES | |||||||||
| 1.0 | 4,583,000 | 2.19 | 323,000 | 23,699,000 | 2.06 | 1,572,000 | 4,830,000 | 2.24 | 348,000 |
| 1.5 | 2,714,000 | 2.84 | 248,000 | 14,812,000 | 2.56 | 1,221,000 | 2,897,000 | 2.91 | 271,000 |
| 2.0 | 1,714,000 | 3.54 | 195,000 | 9,167,000 | 3.07 | 904,000 | 1,949,000 | 3.47 | 217,000 |
| 2.5 | 1,240,000 | 4.01 | 160,000 | 5,966,000 | 3.52 | 675,000 | 1,351,000 | 3.96 | 172,000 |
The above table illustrates the sensitivity of this mineral resource estimate to different cut-off grades for underground operation scenarios with reasonable prospects for economic extraction. The reader is cautioned that the figures provided in this table should not be construed as a statement of mineral resources. The quantities and estimated grades reported at different cut-off grades are presented for the sole purpose of demonstrating the sensitivity of the resource model to the choice of a specific cut-off grade per gold corridor.
InnovExplo Inc.'s NI 43-101 report will be filled on SEDAR with-in 45 days from the present.
About Cartier Resources Inc.
Cartier Resources Inc. was founded in 2006 and is a Val-d'Or based exploration company. The company's projects are all located in Quebec, which has consistently ranked as one of the world's best mining jurisdictions. Cartier is advancing the development of its flagship Chimo Mine Project and actively exploring its other projects. The Company has a strong cash position exceeding $6.5 M and a significant corporate and institutional endorsement, including Agnico Eagle Mines, O3 Mining and Quebec investment funds.
Qualified Persons
The scientific and technical information on the Company and the Chimo Mine Project in this news release was prepared and reviewed by Mr. Gaétan Lavallière, P. Geo., Ph. D, Cartier's Vice- President, and Mr. Ronan Déroff, P. Geo, M. Sc., Cartier's Senior Geologist, Project Manager and Geomatician, both qualified persons as defined in NI 43-101. Mr. Lavallière approved the information contained in this press release.
The qualified persons independent of the issuer, responsible for estimating the resources of the Chimo Mine property and the Nordeau West deposit, within the meaning of NI 43-101, are Mrs. Vincent Nadeau-Benoit, P.Geo., and Alain Carrier P.Geo., M.Sc. from the firm InnovExplo Inc. Mrs. Nadeau-Benoit and Carrier declare that they have read this press release and that the scientific and technical information relating to the resource estimate presented therein is correct.
About InnovExplo Inc.
InnovExplo Inc. is a consulting firm providing services in mineral exploration, mining geology, mineral resources, mining engineering, the environment, and sustainable development. Since its founding in 2003, InnovExplo Inc. has worked on 450 different mandates for 170 junior mineral exploration companies and producers. The firm has produced more than 300 geological or engineering reports for projects covering almost all areas of a mining project, from exploration to operations, mainly including the drafting of NI 43-101 technical reports.
| For more information, contact: Philippe Cloutier, P. Geo. President and CEO Telephone: 819-856-0512 |
Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release.
A photo accompanying this announcement is available at
Longitudinal Composite Section of Chimo Mine Project Gold System - 4th Resource Estimate Longitudinal Composite Section of Chimo Mine Project Gold System - 4th Resource Estimate
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment