Kyrgyzstan Exceeds Annual Targets For Irrigation Infrastructure Repairs
The work is being carried out by structural divisions of the Water Resources Service under the ministry as part of a broader program to repair, clean and restore irrigation facilities.
The 2026 program provides for the repair and mechanical cleaning of 776 kilometers of inter-farm canals, the repair and rehabilitation of 590 hydraulic structures, 508 water-measuring stations, 91 pumping stations and 170 pumping units, the replacement of 46 pumping units, and the cleaning of 225 kilometers of collector-drainage networks. It also envisages laying 657,400 square meters of concrete lining and installing 1,500 control water-measuring devices.
According to the ministry, 656.7 kilometers of canals have been repaired and mechanically cleaned, while 638 hydraulic structures, 317 water-measuring stations, 113 pumping stations and 197 pumping units have been repaired. In addition, 217 kilometers of collector-drainage networks have been cleaned and 14 pumping units replaced.
The work has also included the installation of 297,300 square meters of concrete lining and 50 control water-measuring devices.
The rehabilitation program is aimed at improving the efficiency of irrigation water distribution, upgrading the technical condition of water infrastructure and preserving the reclamation conditions of agricultural land.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.

Comments
No comment