Union Power Metals Confirms Historical Manganese Mineralization In First Modern Drill Holes At Michalová, Slovakia
| Hole | From (m) | To (m) | Interval (m) | Logged description (ENVIGEO) | Mn minerals, visual estimate |
| V-13 | 6.5 | 7.4 | 0.9 | Secondary Mn ore between layers of plastic clay (Mn-rich layers 19 + 23 + 1 + 1 cm) | 80% |
| V-13 | 10.0 | 12.4 | 2.4 | Black secondary Mn ore interbedded with marly clay partings ≤3 cm; locally hard ore fragments; Mn ore predominant | 80% |
| V-13 | 12.4 | 13.4 | 1.0 | Regular alternation of secondary Mn ore and brown marly clay; Mn-rich layers ≤3 cm | 50% |
| V-13 | 13.4 | 13.8 | 0.4 | Marly clay with sandy interbeds and secondary Mn ore laminae ≤0.5 mm | 10% |
| V-11 | 7.7 | 9.2 | 1.5 | Secondary Mn ore-bearing interval; black sandy ore layers in laminae ≤1 cm, fragments ≤3 cm; ore-bearing sub-intervals 7.8–8.0, 8.15–8.45, 8.55–8.65, 8.9–9.2 m | 50% |
| V-11 | 9.2 | 9.9 | 0.7 | Plastic clay; secondary Mn ore in sandy layers (9.65–9.70 m) and laminae ≤1 mm | 25% |
| V-11 | 9.9 | 11.3 | 1.4 | Plastic clay with Mn ore laminae and lenses ≤3 cm; clay predominant | 10–15% |
Intervals are drilled thicknesses in vertical holes; true thickness is not yet known. Visual estimates of manganese mineral content are the logging geologist's estimates and are not assays; no grade should be inferred from them. Core recovery through all intervals listed was 100%.
Table 2 – Historical sampling results, holes M-96 and M-114 (Czechoslovak state exploration, 1952–1955)
| Historical hole | From (m) | To (m) | Interval (m) | Mn (%) | SiO2 (%) | Fe (%) | Relationship to 2026 hole |
| M-96 | 3.15 | 3.65 | 0.50 | 1.63 | 56.28 | 7.01 | Twinned by V-13 (collared at the recorded M-96 collar location) |
| M-96 | 3.65 | 4.00 | 0.35 | 1.21 | 52.95 | 7.27 | |
| M-96 | 10.50 | 11.00 | 0.50 | 9.49 | 44.58 | 6.98 | |
| M-96 | 11.00 | 12.00 | 1.00 | 11.99 | 43.98 | 5.73 | |
| M-96 | 12.00 | 13.00 | 1.00 | 12.69 | 43.42 | 7.85 | |
| M-96 | 13.00 | 14.00 | 1.00 | 7.83 | 47.85 | 5.24 | |
| M-96 | 14.00 | 15.00 | 1.00 | 3.31 | 46.43 | 5.24 | |
| M-96 composite | 10.50 | 15.00 | 4.50 | 9.0 | Length-weighted average | ||
| M-114 | 8.60 | 9.00 | 0.40 | 18.33 | 28.38 | 9.64 | Twinned by V-11 (approx. 8 m from the recorded M-114 collar) |
| M-114 | 9.00 | 10.00 | 1.00 | 9.02 | 37.87 | 6.80 | |
| M-114 | 10.00 | 11.00 | 1.00 | 14.21 | 52.50 | 5.39 | |
| M-114 | 11.00 | 11.40 | 0.40 | 1.90 | 55.03 | 6.24 | |
| M-114 composite | 8.60 | 11.40 | 2.80 | 11.2 | Length-weighted average |
Historical results are transcribed from archival exploration records (see“Historical Data”). They have not been verified by the Company or its Qualified Person, the sampling and analytical methods used in the 1950s are not fully documented, and the results are presented for context only.
Figure 1 – Location of the Michalová phase one drill holes northwest of the village of Michalová, Banská Bystrica Region, Slovakia, with V-13 and V-11 highlighted. Satellite imagery © Google, Maxar Technologies; collar coordinates UTM zone 34N (WGS84).
Figure 2 – V-13 core from 8.2 to 11.8 metres (box labels in metres): grey plastic clay above 10.0 metres passing into black secondary manganese ore from 10.0 metres.
Figure 3 – V-11 core: the richest part of the mineralized interval, from 7.7 to 9.2 metres (middle box), with plastic clay above and the weaker laminated interval from 9.2 metres below.
Historical Data
The historical drill holes referenced in this news release (M-96 and M-114) were drilled during Czechoslovak state exploration of the Michalová deposit between 1952 and 1955. The drill logs and sampling results are contained in the final exploration report held by the Slovak Geological Archive (GEOFOND, inventory number 13698), which the Company has obtained, translated and digitised. Historical collar locations were digitised from archival plans and carry a positional uncertainty of several metres; the 2026 twin holes were collared at (V-13) or approximately 8 metres from (V-11) the recorded historical collar locations. Historical samples were core and channel samples analysed in state laboratories of the period for manganese, silica, iron and lime; the sample preparation, analytical methods and quality-control procedures are not fully documented. The Company and its Qualified Person have not verified the historical results, which were not prepared in accordance with National Instrument 43-101 and are presented for context only. The current twin-hole program is designed to test the reliability of this historical information; the 2026 laboratory assays, when received, will provide the first modern analytical data for these locations.
Next Steps
Results from the remaining completed holes will be reported as they are compiled, and laboratory assay results will be reported as certificates are received from ALS, together with the sampling, analytical and quality-control details. Representative composites of the oxide and carbonate mineralization are being assembled for the metallurgical testwork program described in the Company's news release of September 11, 2026. Drilling of the remaining holes of the 25-hole program is planned to continue.
About the Michalová Project
The Michalová oxide and manganese carbonate deposit is located in the Banská Bystrica Region of central Slovakia, within a European Union member state and inside the customs union serving the region's battery and steel supply chains.
The project was the subject of extensive state-funded exploration during the Czechoslovak era, and the Company has compiled and translated corresponding archival records held by GEOFOND.
Union Power's current work program is designed to apply modern exploration, analytical and metallurgical methods to the historical geological information as the Company evaluates the project's potential.
Manganese is designated a strategic raw material under the European Union's Critical Raw Materials Act. High-purity manganese sulphate monohydrate is an important manganese product used in certain lithium-ion battery cathode chemistries.
Union Power is evaluating whether mineralization at Michalová may ultimately be suitable for processing toward a high-purity manganese product. No determination regarding economic viability or the ability to produce battery-grade manganese has been made, and further drilling, analytical, metallurgical and technical work is required.
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by Lorne Warner, P.Geo., a director of the Company and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Warner is not independent of the Company. Mr. Warner has reviewed the drill logs, core photographs and sampling records for holes V-13 and V-11 provided by ENVIGEO a.s. and the Company's responsible geologist. Mr. Warner has not verified the historical sampling results referenced in this news release, which are presented for context only. Visual estimates of mineralization are not a substitute for laboratory assays, and no grade should be inferred from them. Details of sampling, analytical methods and quality control will be provided with the laboratory assay results.
About Union Power Metals Corporation
Union Power Metals Corporation is a mineral exploration company focused on advancing high-potential manganese projects in Slovakia, while maintaining exposure to uranium assets in Botswana. The Company is committed to responsible development and long-term value creation through the advancement of critical minerals important to evolving global energy and industrial supply chains.
ON BEHALF OF THE BOARD OF DIRECTORS
Derrick Dao
Chief Executive Officer
Union Power Metals Corporation
For more information, please contact:
Derrick Dao
Chief Executive Officer
...
+1 825 558 3828
Carrie Howes
Investor Relations
...
+1 647 725 9639
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statement Regarding Forward-Looking Information
This news release contains statements which constitute“forward-looking information” within the meaning of applicable securities laws, including statements regarding the Company's drill program at Michalová; the drilling of the remaining holes of the program and the timing of the resumption of drilling; the geological interpretation of holes V-13 and V-11; the potential correlation between current and historical drilling; the significance of visual estimates of mineralization; the timing, receipt and reporting of laboratory assay results; the reporting of further drill holes; planned analytical and metallurgical testwork; the assembly and testing of oxide and carbonate composites; the potential suitability of mineralization for processing toward high-purity or battery-grade manganese products; the potential of the Michalová Project; and the possible role of the project in European manganese and battery supply chains.
Forward-looking information is often identified by words such as“may”,“would”,“could”,“should”,“will”,“intend”,“plan”,“anticipate”,“believe”,“estimate”,“expect”,“potential” or similar expressions.
Such forward-looking statements are based on assumptions considered reasonable by management as of the date hereof, including the Company's ability to complete the planned exploration program, obtain meaningful analytical and metallurgical results, access required personnel and services, maintain its mineral rights and obtain adequate financing to advance its projects.
Forward-looking information involves known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to differ materially from those expressed or implied by such information. These risks include, without limitation, risks associated with mineral exploration and development; the possibility that laboratory assay results may differ materially from visual estimates of mineralization; the possibility that current drilling may not correlate with historical results; the possibility that metallurgical testwork may not demonstrate a viable pathway to high-purity or battery-grade manganese products; availability of financing; commodity prices; regulatory and permitting matters; general market and economic conditions; and other risks inherent in the mineral exploration industry.
There can be no assurance that the planned exploration or metallurgical programs will produce the results anticipated by the Company or that the Michalová Project will ultimately support an economically viable mineral operation or the production of battery-grade manganese.
Forward-looking information contained herein represents management's best judgment based on information currently available. Readers are cautioned not to place undue reliance on forward-looking information. The Company undertakes no obligation to update or revise forward-looking statements as a result of new information, future events or otherwise, except as required by applicable law.
Photos accompanying this announcement are available at:

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.




Comments
No comment