Pecoy Copper Intersects 727 Metres At 0.30% Copper And 0.11 G/T Gold At South Breccia Northwest Returns 220 Metres At 0.40% Copper And 0.030% Molybdenum
| Hole | From (m) | To (m) | Length (m) | Cu (%) | Au (g/t) | Mo (%) | Ag (g/t) | Area (type) |
| PEC26-073 | 424.00 | 764.00 | 340.00 | 0.25 | 0.02 | 0.013 | 0.74 | North-Central (EDM depth target) |
| incl. | 488.00 | 578.00 | 90.00 | 0.30 | 0.02 | 0.015 | 1.05 | |
| PEC26-07 4 | 45.00 | 293.00 | 248.00 | 0.25 | 0.02 | 0.003 | 0.96 | Centre of the Pit (in-pit and depth expansion) |
| incl. | 50.00 | 194.00 | 144.00 | 0.30 | 0.02 | 0.003 | 1.06 | |
| incl. | 120.00 | 156.50 | 36.50 | 0.40 | 0.02 | 0.002 | 1.68 | |
| and | 450.00 | 940.00 | 490.00 | 0.20 | 0.02 | 0.004 | 1.11 | |
| and overlap. | 773.00 | 955.30 | 182.30 | 0.21 | 0.02 | 0.003 | 0.88 | (below pit) |
| PEC26-075 | 18.00 | 144.00 | 126.00 | 0.25 | 0.02 | 0.008 | 0.47 | East (step-out and depth) |
| incl. | 86.00 | 135.50 | 49.50 | 0.30 | 0.02 | 0.008 | 0.54 | |
| incl. | 114.00 | 129.70 | 15.70 | 0.40 | 0.02 | 0.008 | 0.62 | |
| and | 600.00 | 874.00 | 274.00 | 0.15 | 0.02 | 0.004 | 0.59 | |
| PEC26-076 | 124.10 | 638.00 | 513.90 | 0.30 | 0.02 | 0.010 | 1.15 | East and Central Breccia (in-pit and down-dip extension) |
| incl. | 157.90 | 374.30 | 216.40 | 0.41 | 0.03 | 0.010 | 1.19 | |
| overlap. | 174.00 | 410.00 | 236.00 | 0.40 | 0.03 | 0.010 | 1.16 | |
| incl. | 278.00 | 370.00 | 92.00 | 0.50 | 0.04 | 0.013 | 1.39 | |
| also incl. | 440.55 | 466.00 | 25.45 | 0.41 | 0.03 | 0.007 | 1.65 | |
| and | 679.00 | 875.90 | 196.90 | 0.20 | 0.06 | 0.006 | 0.94 | |
| incl. | 854.00 | 874.00 | 20.00 | 0.40 | 0.04 | 0.004 | 2.00 | |
| PEC26-077 | 56.00 | 269.00 | 213.00 | 0.25 | 0.02 | 0.005 | 1.00 | West Pampa (first-pass test) |
| incl. | 80.00 | 200.00 | 120.00 | 0.30 | 0.02 | 0.006 | 1.13 | |
| PEC26-078 | 231.50 | 444.00 | 212.50 | 0.30 | 0.05 | 0.007 | 1.23 | South Breccia (in-pit, western test) |
| incl. | 266.50 | 438.00 | 171.50 | 0.35 | 0.06 | 0.007 | 1.37 | |
| incl. | 276.50 | 419.95 | 143.45 | 0.40 | 0.07 | 0.008 | 1.50 | |
| incl. | 372.00 | 408.00 | 36.00 | 0.50 | 0.08 | 0.011 | 1.86 | |
| PEC26-079 | 23.80 | 628.00 | 604.20 | 0.20 | 0.02 | 0.004 | 1.03 | Centre of the Pit EDM Vein Zone (saddle test) |
| incl. | 38.00 | 84.00 | 46.00 | 0.30 | 0.01 | 0.003 | 0.60 | |
| incl. | 42.00 | 50.00 | 8.00 | 0.41 | 0.02 | 0.003 | 0.78 | |
| PEC26-080 | 0.00 | 350.45 | 350.45 | 0.21 | 0.02 | 0.006 | 1.12 | Centre of the Pit (underdrilled saddle) |
| incl. | 221.65 | 290.00 | 68.35 | 0.30 | 0.01 | 0.010 | 1.03 | |
| incl. | 259.95 | 276.00 | 16.05 | 0.40 | 0.01 | 0.007 | 1.14 | |
| PEC26-081 | 2.00 | 566.00 | 564.00 | 0.30 | 0.03 | 0.020 | 1.14 | Northwest (MTP-01 margin, extension) |
| incl. | 2.00 | 536.00 | 534.00 | 0.30 | 0.03 | 0.021 | 1.16 | |
| incl. | 8.00 | 376.00 | 368.00 | 0.35 | 0.03 | 0.025 | 1.34 | |
| incl. | 104.00 | 324.00 | 220.00 | 0.40 | 0.03 | 0.030 | 1.32 | |
| incl. | 120.00 | 174.60 | 54.60 | 0.51 | 0.04 | 0.024 | 1.52 | |
| and | 691.50 | 1,009.0 | 317.50 | 0.22 | 0.02 | 0.010 | 0.72 | (below pit) |
| PEC26-082 | 264.00 | 991.25 | 727.25 | 0.30 | 0.11 | 0.006 | 1.17 | South Breccia (in-pit structural and Cu–Au test) |
| incl. | 296.00 | 766.00 | 470.00 | 0.32 | 0.15 | 0.007 | 1.23 | |
| incl. | 474.00 | 652.00 | 178.00 | 0.30 | 0.20 | 0.005 | 1.11 | |
| overlap. | 552.00 | 894.00 | 342.00 | 0.35 | 0.09 | 0.006 | 1.29 | |
| incl. | 576.00 | 764.00 | 188.00 | 0.40 | 0.12 | 0.008 | 1.45 | |
| incl. | 695.10 | 764.00 | 68.90 | 0.50 | 0.06 | 0.012 | 1.67 | |
| also incl. | 802.00 | 844.00 | 42.00 | 0.40 | 0.06 | 0.005 | 1.48 | |
| also incl. | 946.00 | 984.00 | 38.00 | 0.41 | 0.04 | 0.011 | 1.63 |
Note: Reported intervals represent downhole lengths; true thicknesses have not yet been determined. Grades are length-weighted averages. Internal lower-grade intervals are included. Values may not sum exactly due to rounding. No individual-sample copper cut-off was applied. Overlapping and included intervals are not additive.
Table 2: Drillhole Information – Previously Reported Holes and Reported in this Release
| Hole | UTM East | UTM North | Elev (masl) | Azimuth | Dip | Length Drilled (m) | Area |
| PEC25-065 | 713977 | 8267284 | 1901 | N 0 | -80 | 1186.25 | South Breccia |
| PEC25-066 | 713796 | 8267252 | 1831 | N 0 | -75 | 1068.50 | South Breccia |
| PEC26-067 | 713104 | 8268120 | 1718 | N 175 | -75 | 1040.00 | Northwest |
| PEC26-068 | 713630 | 8268000 | 2016 | N 180 | -75 | 1,058.10 | Centre of the pit |
| PEC26-069 | 713710 | 8268037 | 2001 | N 180 | -70 | 901.00 | Centre of the pit |
| PEC26-070 | 713611 | 8268327 | 1860 | N 180 | -65 | 947.00 | North-Central |
| PEC26-071 | 713404 | 8267683 | 1927 | N 180 | -80 | 776.20 | Centre of the pit |
| PEC26-072 | 713634 | 8267253 | 1795 | N 0 | -82 | 956.00 | South Breccia |
| PEC26-073 | 713415 | 8268234 | 1856 | N 180 | -81 | 938.00 | North-Central |
| PEC26-074 | 713325 | 8267618 | 1858 | N 180 | -70 | 955.30 | Centre of the pit |
| PEC26-075 | 714040 | 8267712 | 2062 | N 130 | -75 | 938.85 | East step-out |
| PEC26-076 | 713816 | 8268158 | 2040 | N 180 | -72 | 1073 | East and Central |
| PEC26-077 | 713084 | 8267513 | 1706 | N 180 | -72 | 599.25 | West Pampa |
| PEC26-078 | 713498 | 8267249 | 1766 | N 0 | -85 | 923.00 | South Breccia |
| PEC26-079 | 713201 | 8267538 | 1739 | N 175 | -70 | 850.00 | EDM Vein Zone |
| PEC26-080 | 713505 | 8267843 | 2025 | N 180 | -75 | 350.45 | Centre of the pit |
| PEC26-081 | 713303 | 8267997 | 1867 | N 0 | -60 | 1009.00 | Northwest |
| PEC26-082 | 714200 | 8267401 | 1948 | N 270 | -60 | 1205.40 | South Breccia |
Note: Coordinate Reference System (CRS): WGS 84 / UTM Zone 18S (EPSG:32718)
Table 3: Other Drilling & Target Area – Assays pending or holes in progress
| Hole | UTM East | UTM North | Elev (masl) | Azimuth | Dip | Length Drilled (m) | Area |
| PEC26-080A | 713505 | 8267843 | 2025 | 180 | -75 | 1021 | Centre of the Pit |
| PEC26-083 | 714049 | 8267297 | 1921 | 270 | -62 | 1070 | South Breccia |
| PEC26-084 | 713197 | 8268262 | 1725 | 0 | -74 | 905 | Northwest |
| PEC26-085 | 712883 | 8268068 | 1630 | 90 | -45 | 974 | EDM Vein Zone |
| PEC26-086 | 713197 | 8268272 | 1725 | 315 | -60 | 696 | Northwest |
| PEC26-087 | 713894 | 8267282 | 1866 | 102 | -75 | 650 | SBX Gold Zone |
| PEC26-088 | 713235 | 8267684 | 1845 | 0 | -85 | 508 | Supergene Zone |
| PEC26-089 | 713214 | 8268040 | 1835 | 0 | -82 | In progress | Supergene Zone |
| PEC26-090 | 713533 | 8268092 | 1997 | 235 | -65 | In progress | EDM Centre |
| PEC26-091 | 714086 | 8267229 | 2001 | 79 | -78 | In progress | SBX Gold Zone |
| PEC26-092 | 713894 | 8267282 | 1866 | 249 | -78 | In progress | SBX Gold Zone |
Note: Coordinate Reference System (CRS): WGS 84 / UTM Zone 18S (EPSG:32718)
Exploration Productivity and 2026 Program
As of November 13, 2026, the Company had drilled over 26,000 metres in the current campaign, which began in December 2025, with 25 holes completed and 4 holes in progress. The Company continues to target approximately 35,000 metres of drilling at Pecoy in 2026. Assays are pending from 7 completed holes totalling 5,824 metres.
Follow-up priorities include defining South Breccia's copper–gold mineralization and interpreted gold-enriched zone, testing the extent and continuity of Northwest copper–molybdenum mineralization and the MTP-01 target, and testing Central Breccia eastward and downdip. The results will inform ongoing geological modeling and future resource evaluation. Southern extensions remain a priority as access becomes available.
For more information about Pecoy Copper, please visit our website at or view the Company's VRIFY presentation in connection with this release at .
Figure 1: Plan view of the Pecoy Project showing the current deposit outline, principal mineralized zones, exploration target areas and current drill hole locations
Figure 2: Looking north - Cross-section showing broad copper-gold mineralization at South Breccia in PEC26-082
b-.png" style="display:block; margin-left:auto; margin-right:auto;" width="1100" data-dpi="96" data-caption="Figure 2 - B-B'" data-filename="Figure 2 - B-B'.png" />
Figure 3: Looking west - Cross-section showing East Breccia copper mineralization and the interpreted Central Breccia downdip extension in PEC26-076
Figure 4: Looking west - Northwest cross-section showing copper–molybdenum mineralization in PEC26-081 and copper mineralization beneath the resource pit shell in PEC26-074.
Qualified Persons and Technical Notes
The scientific and technical information in this news release has been reviewed and approved by Vincent Cardin-Tremblay, P.Geo., Chief Geological Officer of Pecoy Copper and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“ NI 43-101”).
The Qualified Person verified the data disclosed in this news release by reviewing the final laboratory assay workbooks and certificates, drillhole collar and downhole-survey data, sampling and analytical procedures, and QA/QC results. No limitations were imposed on the verification process.
Diamond drill core from the Pecoy Project was logged and sampled at the Company's secure core facility at site by Company personnel. Drill core was sawn in half, with one half retained for reference and the other half sampled at nominal intervals of up to 2 metres, with sample boundaries adjusted to respect geological contacts. Core diameter varied between HQ and NQ depending on depth.
Samples were bagged, sealed, and transported by commercial carrier to the Bureau Veritas preparation laboratory in Arequipa, Peru, where samples were crushed and a 250 g split was pulverized to 85% passing 75 micrometres (200 mesh). Prepared pulps were then sent to the Bureau Veritas assay laboratory in Lima, Peru. Bureau Veritas is an ISO-accredited laboratory and is independent of the Company.
Gold analyses were performed using fire assay fusion with ICP-OES finish on a 30 g sample (FA330). Samples returning gold values greater than 10 g/t Au were re-analyzed using fire assay with gravimetric finish (FA530). Copper and silver were analyzed by ICP-OES/MS following a four-acid digestion as part of a 45-element multi-element suite (4A200). Samples returning values over the upper detection limit (Au, Ag, Cu, Zn, Mo, Pb) were re-analyzed using four-acid digestion with AAS finish (MA402).
A comprehensive Quality Assurance and Quality Control (QA/QC) program was implemented as part of the sampling and analysis procedures. Certified reference materials, blanks, and duplicate samples (field, preparation, and analytical duplicates) were inserted into the sample stream at regular intervals, representing approximately 15% of the total samples submitted. No significant QA/QC issues were identified during the analysis, and the results are considered reliable for reporting purposes.
An NI 43-101 technical report in respect of the Pecoy Project with an effective date of April 30, 2025 and dated July 23, 2025 was prepared by Mining Plus and is available on SEDAR+ under the Company's profile. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
About Pecoy Copper
Pecoy Copper is advancing the Pecoy Copper-Gold-Molybdenum-Silver Project and the Tororume Project, which together cover approximately 19,800 hectares in southern Peru's Arequipa region. Pecoy hosts a current inferred mineral resource of 865 million tonnes at 0.34% Cu, with associated gold, molybdenum, and silver credits.
Less than 49,000 metres of drilling had been completed at Pecoy before the current campaign. The Project lies approximately 1,650 metres above sea level and benefits from year-round access and proximity to highways, power, water and the Pacific ports of Matarani and Ilo.
The Company's common shares trade on the TSX Venture Exchange under the symbol PCU, on the Frankfurt Stock Exchange under the symbol D5E, and on the OTCQX under the symbol PCUUF.
For further information, please contact:
Vincent Metcalfe, President & CEO
Pecoy Copper Corp.
Suite 2700, 666 Burrard Street, Vancouver, BC V6C 2X8
Tel: 1 (778) 401-9305 | Email: ...
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Cautionary Note Regarding Forward-Looking Information
This news release contains forward-looking information and forward-looking statements within the meaning of applicable securities legislation. Forward-looking information includes, but is not limited to, statements regarding the planned 35,000-metre 2026 drill program at Pecoy; future drilling, modeling and interpretation at South Breccia, the Northwest, East Breccia, Central Breccia, West Pampa, Centre-of-Pit and North-Central target areas; the potential geometry, continuity, scale, extension and resource-growth implications of the mineralized system; interpretation and testing of the MTP-01 anomaly; ongoing Phase 2 metallurgical testwork and potential gold and molybdenum by-products; future access to southern extensions; and the Company's ability to identify targets that may support future resource evaluation. Forward-looking information is based on management's current expectations, estimates, assumptions and beliefs, including assumptions regarding funding, permits, access, personnel, drilling productivity, laboratory turnaround times and the availability of equipment and contractors. Forward-looking information is subject to known and unknown risks and uncertainties, many of which are beyond the Company's control, that may cause actual results to differ materially from those expressed or implied. These risks include exploration and geological risk, uncertainty in target interpretations, metallurgical variability and recovery risk, operational risk, permitting and community-relations risk, financing and market risk, and the other risk factors described in the Company's continuous-disclosure filings available on SEDAR+. Forward-looking information is provided as of the date of this news release. Except as required by applicable law, the Company undertakes no obligation to update or revise such information. Readers should not place undue reliance on forward-looking information.
Photos accompanying this announcement are available at:

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.




Comments
No comment