Tuesday, 02 January 2024 12:17 GMT

Final Bridge Of Dubai's World Trade Centre Roundabout Project To Open This Friday


Date:

(MENAFN- Khaleej Times) Drivers navigating one of Dubai's busiest hubs are set for a major relief this weekend as the Roads and Transport Authority (RTA) prepares to open the final piece of its ambitious infrastructure transformation.

On Friday, 30 October 2026, the last bridge of the World Trade Centre Roundabout Development Project will officially open to traffic. The 1,000-metre, two-lane structure is designed to handle roughly 3,000 vehicles per hour, streamlining movement for motorists traveling directly from Al Majlis Street towards 2nd December Street.

Recommended For You Sharjah temporarily closes Al Hamriya Beach as precaution after UAQ oil spill

Stay up to date with the latest news. Follow KT on WhatsApp Channels.

Once operational, the new bridge will drastically ease congestion at the vital corridor, slashing commute times between Al Majlis Street and 2nd December Street from six minutes down to just one minute.

The milestone marks the full completion of all major construction under the Dh 696 million World Trade Centre Roundabout Development Project. In total, the project features five newly built bridges spanning a combined length of 5,000 metres.

ALSO READ
    Dubai traffic: New bridge to cut travel time from World Trade Centre from 10 minutes to 2 Dubai opens new Al Qudra bridge as project to cut traffic delays from 7 minutes to 1 Rush-hour drive on Dubai's newest bridge to Business Bay: Less traffic, faster ride

MENAFN25102026000049011007ID1111861642


Khaleej Times

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.



More Story

Search