Jaw Crusher Selection Depends On Feed Size, Material Properties, And Production Capacity
| Material information | What to discuss with the supplier |
| Rock type and representative samples | Suitability for the proposed crushing duty |
| Compressive strength and abrasiveness, if tested | Application limits and wear-part selection |
| Moisture and clay content | Feeding conditions and possible material-handling difficulties |
| Feed size distribution | Oversize management and whether prescreening is appropriate |
| Loose bulk density | Basis used to assess throughput in tonnes per hour |
If laboratory results are unavailable, identify those gaps clearly. Request guidance on sampling rather than substituting generic values for the actual material.
3. Convert the Production Target into Required Throughput
A daily production target is not yet a crusher capacity requirement. First define whether the target refers to raw material processed or saleable finished aggregate.
For a simplified planning calculation:
Required processing rate = daily feed tonnage ÷ effective processing hours
Suppose a project needs to process 1,200 tonnes of raw feed per day. The scheduled shift is 10 hours, but the planning assumption allows 8 hours of effective processing after routine interruptions.
1,200 tonnes ÷ 8 hours = 150 tonnes per hour
Selecting on the basis of 120 t/h would assume uninterrupted processing throughout the entire scheduled shift.
If the requirement is instead 1,200 tonnes of saleable product, the calculation must also account for material rejected, diverted or produced outside the required specifications. Any recirculating load should be assessed in the relevant part of the process.
Published capacity ranges need to be interpreted against their operating conditions. For example, Sandvik's jaw crusher technical specification states material and density assumptions for its capacity figures and shows different throughput ranges at different discharge settings. Those figures apply to Sandvik equipment, but they illustrate why operating assumptions must accompany capacity comparisons. Technical reference: Sandvik jaw crusher specifications
4. Match the Primary Crusher to the Next Stage
The Primary Jaw Crusher is part of a production line. Its discharge must work with the receiving conveyor, secondary crusher and screening arrangement.
Specify the required discharge characteristics and ask the supplier to explain how the proposed setting affects both throughput and product size. A discharge opening is not a guarantee that every discharged particle will have that exact dimension.
A useful comparison considers:
-
Expected primary crusher throughput at the proposed operating setting.
Feed acceptance of the secondary crusher.
Conveyor and screen capacity.
Requirements for further crushing, sizing or shaping.
Installation space and maintenance access.
Kemai's C Series jaw crusher is another option to include in a project discussion, particularly where installation arrangements and frame construction need closer review. Request a model-specific proposal using the same feed and output requirements for every candidate.
5. Worked Example: Screening a Crusher for a Granite Project
The following is a hypothetical planning example, not a customer installation or a performance guarantee.
Assume a project has the following requirements:
| Item | Planning assumption |
| Material | Granite; abrasiveness and moisture still to be confirmed |
| Maximum expected feed | 450 mm |
| Daily raw-feed target | 1,200 tonnes |
| Effective processing time | 8 hours per day |
| Required processing rate | 150 t/h |
| Next stage | Secondary crushing and screening |
Kemai lists a maximum feed size of 500 mm and a capacity range of 60–160 t/h for the PE-600 × 900. This makes it a model to examine during initial screening, but the 150 t/h target is close to the upper end of that published range. The table alone does not establish that this machine will achieve the project target under the proposed conditions. Source: Kemai PE Series specifications
The next step is to ask Kemai to assess the material, feed distribution and required discharge setting, then compare suitable alternatives. The preferred model should have a documented application basis-not simply a maximum catalogue figure above 150 t/h.
6. Prepare a Clear Request for Selection and Quotation
A useful enquiry gives the supplier enough information to assess the duty:
-
Material type, photographs and available test results.
Maximum lump size and typical feed distribution.
Required hourly or daily production.
Scheduled hours and expected effective processing time.
Required output sizes and downstream equipment.
Site location, power supply and installation constraints.
Good jaw crusher selection connects these details into one equipment decision. It reduces uncertainty in the quotation and makes competing proposals easier to evaluate.
Planning a new crushing line or replacing an existing jaw crusher? Contact Kemai for a jaw crusher selection review. Share your material, feed size and production target to request a suitable equipment proposal.
About Us
Shandong Kemai Machinery Equipment Co., Ltd. is a high-tech mining machinery manufacturing company, over past 20 years, Kemai Machinery has supplied hundreds of complete solutions in in the fields of engineering aggregate, construction sand and industry powder processing fields in more than 60 countries.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment