Turnover Of 177 Million Euros In The Third Quarter
| In million euros | 9M 2026 | 9M 2025 | Var. at current exchange rates | Var. at constant exchange rates | Q3 2026 | Q3 2025 | Var. at current exchange rates | Var. at constant exchange rates |
| Turnover | 508.7 | 414.5 | +23% | +21% | 177.4 | 163.0 | +9% | +6% |
| Energy Sales | 301.7 | 237.3 | +27% | +24% | 111.5 | 85.2 | +31% | +26% |
| Renvolt | 177.8 | 153.3 | +16% | +16% | 53.9 | 68.0 | -21% | -21% |
| Voltalia Hub | 29.2 | 23.9 | +22% | +21% | 12.1 | 9.8 | +23% | +22% |
Turnover for the first nine months of 2026 amounts to 508.7 million euros, up +21% at constant exchange rates (+23% at current exchange rates). It breaks down as 61% in Europe, 32% in Latin America and 7% in the rest of the world, illustrating the continued geographical rebalancing of activities. Energy Sales accounts for 59%, Renvolt for 35% and Voltalia Hub for 6% of turnover for the first nine months of 2026.
Turnover for the third quarter of 2026 amounts to 177.4 million euros, up +6% at constant exchange rates (+9% at current exchange rates). Strong growth in Energy Sales and Voltalia Hub offsets the one-off decline in Renvolt, whose revenues reflect the achievement of construction milestones.
REVIEW OF ACTIVITIES
Energy Sales
| Operational indicators | 9M 2026 | 9M 2025 | Var. | Q3 2026 | Q3 2025 | Var. |
| Production (in GWh) | 4,066 | 3,648 | +11% | 1,659 | 1,283 | +29% |
| Production curtailment (in GWh) | 443 | 651 | -32% | 225 | 383 | -41% |
| Capacity in operation (in MW)2 | 3,001 | 2,554 | +18% | |||
| Capacity in operation and under construction (in MW) | 3,564 | 3,286 | +8% | |||
| Wind load factor in Brazil | 32% | 34% | -2pts | 44% | 37% | +7pts |
| Wind load factor in Brazil without curtailment | 38% | 43% | -5pts | 52% | 53% | -1pt |
| Solar load factor in Brazil3 | 19% | 19% | stable | 20% | 16% | +4pts |
| Solar load factor in Brazil without curtailment | 24% | 24% | stable | 26% | 25% | +1pt |
| Wind load factor in France | 20% | 21% | -1pt | 15% | 17% | -2pts |
| Solar load factor in France | 15% | 11% | +4pts | 20% | 13% | +7pts |
| Solar load factor in Jordan and Egypt | 27% | 28% | -1pt | 30% | 31% | -1pt |
| Solar load factor in Albania | 24% | 24% | stable | 29% | 29% | stable |
| Solar load factor in the United Kingdom | 17% | 19% | -2pts | 17% | 20% | -3pts |
| Solar load factor in Portugal | 22% | 22% | stable | 26% | 27% | -1pt |
Production for the first nine months of 2026 amounts to 4.1 TWh, up +11% compared with the first nine months of 2025. This increase reflects growth in capacity in operation and the ramp-up of recently commissioned power plants. Solar and wind account for 55% and 43% of production over the period respectively. It should be noted that battery storage is set to account for a gradually larger share of this energy mix (standalone storage projects and hybrid projects).
Production for the third quarter of 2026 reaches 1.7 TWh, up +29% compared with the third quarter of 2025. This strong increase benefits from the contribution of new power plants, the sharp reduction in curtailment and improved solar and wind resources.
Analysis of quarterly production by region
- In Latin America, production grows by +22%, driven by improved solar and wind resources and the continued decrease in curtailment. Curtailment stands at 225 GWh in the third quarter of 2026, down 41%, confirming the improvement observed since the beginning of the year In Europe, production grows by +10%, driven in particular by recently commissioned power plants, notably in French Guiana In Africa and internationally, production is multiplied by 3.6, driven by new capacity commissioned Helexia production grows by +7%
| In million euros | 9M 2026 | 9M 2025 | Var. at current exchange rates | Var. at constant exchange rates | Q3 2026 | Q3 2025 | Var. at current exchange rates | Var. at constant exchange rates |
| Energy Sales turnover | 301.7 | 237.3 | +27% | +24% | 111.5 | 85.2 | +31% | +26% |
| Latin America | 141.2 | 105.8 | +34% | +26% | 48.3 | 38.2 | +27% | +18% |
| Europe | 73.1 | 62.3 | +17% | +18% | 27.7 | 22.2 | +25% | +24% |
| Africa and international | 32.8 | 22.1 | +49% | +49% | 13.5 | 7.7 | +74% | +69% |
| Helexia | 54.5 | 47.2 | +16% | +14% | 22.0 | 17.1 | +29% | +26% |
Turnover from Energy Sales for the first nine months of 2026 reaches 301.7 million euros, up +24% at constant exchange rates (+27% at current exchange rates). This change reflects the contribution of capacity growth (+18%), a favourable currency effect linked to the Brazilian real and the recognition, in the first half, of compensation related to curtailment in Brazil. These drivers offset lower availability at certain wind power plants, which is in the process of being resolved.
Turnover from Energy Sales for the third quarter of 2026 reaches 111.5 million euros, up +26% at constant exchange rates (+31% at current exchange rates), driven by turnover growth across all regions and at Helexia.
Renvolt
| In million euros | 9M 2026 | 9M 2025 | Var. at current exchange rates | Var. at constant exchange rates | Q3 2026 | Q3 2025 | Var. at current exchange rates | Var. at constant exchange rates |
| Turnover | 177.8 | 153.3 | +16% | +16% | 53.9 | 68.0 | -21% | -21% |
Turnover from Renvolt for the first nine months of 2026 amounts to 177.8 million euros, up +16% at constant and current exchange rates, benefiting from the growth recorded in the first half. This increase is driven by momentum in construction activities for third-party clients in Europe (around 600 MW under construction in Ireland and Spain) and in maintenance for third-party clients, notably in Portugal.
Turnover from Renvolt for the third quarter of 2026 amounts to 53.9 million euros, down -21% at constant and current exchange rates. This change mainly reflects the recognition of revenues according to the progress of construction milestones. It does not call into question the growth momentum observed over the first nine months of the year.
Voltalia Hub
| In million euros | 9M 2026 | 9M 2025 | Var. at current exchange rates | Var. at constant exchange rates | Q3 2026 | Q3 2025 | Var. at current exchange rates | Var. at constant exchange rates |
| Turnover | 29.2 | 23.9 | +22% | +21% | 12.1 | 9.8 | +23% | +22% |
Turnover from Voltalia Hub for the first nine months of 2026 amounts to 29.2 million euros, up +21% at constant exchange rates (+22% at current exchange rates). This increase notably reflects growth in specialised activities, including Yusco4 and maintenance for third-party clients in Brazil.
Turnover from Voltalia Hub for the third quarter of 2026 amounts to 12.1 million euros, up +22% at constant exchange rates (+23% at current exchange rates), supported by growth across all specialised activities.
NEW ANNOUNCEMENTS
Capacity in operation: 2026 objective reached as early as September 5
As early as September, Voltalia reaches its objective of 3 GW of capacity in operation, one quarter ahead of schedule, notably thanks to 38 MW of new Helexia capacity commissioned during the third quarter in Europe and Brazil.
Voltalia strengthens its Board of Directors 6
Following the General Meeting of 9 October 2026, Voltalia strengthens its Board of Directors with the ratification of the co-optation of Isabelle Kocher de Leyritz and the appointment of Emmanuelle Lemer as independent director.
- Isabelle Kocher de Leyritz, co-opted in May 2026 to replace Laurence Mulliez, Chair of Blunomy, brings first-rate experience in strategy, energy transition, governance, finance and corporate transformation, gained notably at Suez and ENGIE, where she was Chief Executive Officer from 2016 to 2020 Emmanuelle Lemer, also appointed Chair of the Audit Committee, has more than twenty years of experience in energy, infrastructure and investment banking, notably at J.P. Morgan. She brings to the Board recognised expertise in financial markets, strategic transactions and financing.
These appointments strengthen the diversity and complementarity of the Board of Directors' skills to support Voltalia in the execution of its strategy and its SPRING transformation plan.
OPERATIONAL AND FINANCIAL OBJECTIVES 7
2026 operational and financial objectives
- Operational objectives reached as early as September 2026: capacity in operation and under construction of around 3.6 gigawatts, including around 3 gigawatts in operation Financial objectives: 2026 EBITDA of between 210 and 230 million euros confirmed, including 190 to 210 million euros generated by the Energy Sales business
NEXT ON THE AGENDA:
- 2026 annual results, on 4March 2027 (before market open)
FORWARD-LOOKING STATEMENTS
This press release contains forward-looking statements. These statements do not constitute historical facts. They include projections and estimates and the assumptions on which they are based, statements relating to projects, objectives, intentions and expectations regarding financial results, future events, operations, services, product development and their potential, or future performance. Such forward-looking statements can often be identified by the use of words such as“expect”,“anticipate”,“believe”,“intend”,“estimate” or“plan”, as well as other similar terms. Although Voltalia's management believes that these forward-looking statements are reasonable, investors are cautioned that they are subject to numerous risks and uncertainties that are difficult to predict and generally beyond Voltalia's control, and that may cause actual results and events to differ materially from those expressed, implied or projected in such forward-looking information and statements. These risks and uncertainties include, in particular, uncertainties inherent in changes in the selling price of the electricity produced by Voltalia, changes in the regulatory environment in which Voltalia operates, and the competitiveness of renewable energy, as well as other factors that may affect the production capacity or profitability of Voltalia's production sites, and those developed or identified in Voltalia's public filings with the Autorité des marchés financiers, including those listed in Section 2.2“Risk factors” of Voltalia's 2025 Universal Registration Document filed with the Autorité des marchés financiers on 30 March 2026. Voltalia undertakes no obligation to update these forward-looking information and statements, subject to applicable regulations.
Capacity in operation as of September 30, 2026
| In MW | Solar | Wind | Biomass | Hydro | Hybrid | Sept. 30, 2026 | Sept. 30, 2025 |
| Helexia | 603 | 603 | 523 | ||||
| Belgium | 32 | 32 | 23 | ||||
| Brazil | 218 | 218 | 188 | ||||
| France | 217 | 217 | 193 | ||||
| Hungary | 25 | 25 | 25 | ||||
| Italy | 25 | 25 | 21 | ||||
| Poland | 5 | 5 | 0 | ||||
| Portugal | 27 | 27 | 27 | ||||
| Romania | 14 | 14 | 14 | ||||
| Spain | 40 | 40 | 32 | ||||
| Voltalia | 1,441 | 854 | 17 | 17 | 68 | 2,398 | 2,031 |
| South Africa | 148 | 148 | 0 | ||||
| Albania | 140 | 140 | 140 | ||||
| Brazil | 584 | 773 | 8 | 12 | 1,377 | 1,369 | |
| Egypt | 32 | 32 | 32 | ||||
| France | 93 | 81 | 5 | 179 | 160 | ||
| Greece | 31 | 31 | 20 | ||||
| French Guiana | 13 | 17 | 5 | 24 | 59 | 48 | |
| Italy | 3 | 3 | 3 | ||||
| Jordan | 57 | 57 | 57 | ||||
| Uzbekistan | 126 | 126 | 0 | ||||
| Netherlands | 60 | 60 | 60 | ||||
| Portugal | 52 | 52 | 52 | ||||
| United Kingdom | 102 | 32 | 134 | 89 | |||
| Total | 2,044 | 854 | 17 | 17 | 68 | 3,001 | 2,554 |
Capacity under construction as of September 30, 2026
| Project name | Capacity (MW) | Technology | Country |
| Helexia | 57 | ||
| Helexia | 37 | Solar | Brazil |
| Helexia | 11 | Solar | France |
| Helexia | 3 | Solar | Italy |
| Helexia | 3 | Solar | Poland |
| Helexia | 1 | Solar | Portugal |
| Helexia | 1 | Solar | Spain |
| Voltalia | 506 | ||
| Artemisya storage | 100 | Storage | Uzbekistan |
| Artemisya wind | 100 | Wind | Uzbekistan |
| East gate | 34 | Solar | United Kingdom |
| Higher Stockbridge | 45 | Solar | United Kingdom |
| Los Venados | 20 | Solar | Colombia |
| Saint Anne hybrid | 7 | Hybrid | French Guiana |
| Saint Anne solar | 43 | Solar | French Guiana |
| Saint Anne storage | 34 | Storage | French Guiana |
| Spitalla solar | 100 | Solar | Albania |
| Voltalia Mobility - Yusco | 24 | Solar | France |
| Total | 563 |
Electricity production as of September 30, 2026
| In GWh | Wind | Solar | Biomass | Hydro | Hybrid | Sept. 30, 2026 | Sept. 30, 2025 |
| Helexia | 505 | 505 | 457 | ||||
| Helexia Brazil | 224 | 224 | 178 | ||||
| Helexia Europe | 282 | 282 | 279 | ||||
| Voltalia | 1,759 | 1,718 | 31 | 5 | 47 | 3,561 | 3,191 |
| South Africa | 137 | 137 | 0 | ||||
| Albania | 223 | 223 | 223 | ||||
| Brazil | 1,662 | 739 | 46 | 2,446 | 2,448 | ||
| Egypt | 58 | 58 | 59 | ||||
| France | 98 | 73 | 5 | 176 | 177 | ||
| Greece | 30 | 30 | 22 | ||||
| French Guiana | 11 | 31 | 1 | 43 | 21 | ||
| Italy | 3 | 3 | 4 | ||||
| Jordan | 103 | 103 | 105 | ||||
| Uzbekistan | 207 | 207 | 0 | ||||
| Portugal | 73 | 73 | 74 | ||||
| United Kingdom | 62 | 62 | 57 | ||||
| Total | 1,759 | 2,223 | 31 | 5 | 47 | 4,066 | 3,648 |
Quarterly electricity production (Q3) 2026
| In GWh | Wind | Solar | Biomass | Hydro | Hybrid | Q3 2026 | Q3 2025 |
| Helexia | 183 | 183 | 170 | ||||
| Helexia Brazil | 81 | 81 | 59 | ||||
| Helexia Europe | 102 | 102 | 111 | ||||
| Voltalia | 775 | 666 | 14 | 4 | 17 | 1,476 | 1,113 |
| South Africa | 66 | 66 | 0 | ||||
| Albania | 91 | 91 | 91 | ||||
| Brazil | 751 | 256 | 17 | 1,024 | 837 | ||
| Egypt | 21 | 21 | 20 | ||||
| France | 24 | 35 | 4 | 63 | 59 | ||
| Greece | 14 | 14 | 10 | ||||
| French Guiana | 4 | 14 | 19 | 5 | |||
| Italy | 0 | 0 | 2 | ||||
| Jordan | 40 | 40 | 40 | ||||
| Uzbekistan | 86 | 86 | 0 | ||||
| Portugal | 29 | 29 | 30 | ||||
| United Kingdom | 23 | 23 | 20 | ||||
| Total | 775 | 849 | 14 | 4 | 17 | 1,659 | 1,283 |
Average EUR/BRL rate
| Average rate | 9M 2026 | 9M 2025 |
| EUR/BRL | 5.98 | 6.32 |
Main expected impacts of the SPRING transformation plan between 2026 and 2030
| KEY INDICATORS | FINANCIAL IMPACT | OUTLOOK |
| EBITDA objective | 300-325 million euros | 2027 |
| Energy Sales EBITDA | 270-300 million euros | 2027 |
| EBITDA margin | ||
| Energy Sales | 70%-72% | 2030 |
| Services | 9%-11% | 2030 |
| Cash flow & impact on capital | ||
| Disposals | 300-350 million euros | Between 2026 and 2028 |
| Long-term financial stability | ||
| Net debt/EBITDA ratio | Between 7.5 and 8 | 2030 |
| About Voltalia ( ) | |
| Voltalia is an international player in renewable energy. The Group produces and sells electricity from its wind, solar, hydro, biomass and storage facilities. It has 3.6 GW of capacity in operation and under construction, and a portfolio of projects under development with a total capacity of 12 GW. Voltalia is also a service provider, supporting its renewable energy customers at every stage of their projects, from design to operation and maintenance. A pioneer in the business market, Voltalia offers a comprehensive range of services to businesses, from the supply of green electricity to energy efficiency services and the local production of its own electricity. With 1,900 employees in 15 countries on 3 continents, Voltalia has the capacity to act globally on behalf of its customers. Voltalia is listed on the Euronext regulated market in Paris (FR0011995588 – VLTSA) and is included in the Enternext Tech 40 and CAC Mid&Small indices. The company is also included, amongst others, in the MSCI ESG ratings and the Sustainalytics ratings. | |
| Voltalia Email:... T. +33 (0)1 81 70 37 00 | Press relations – SEITOSEI.ACTIFIN – Jennifer JULLIA ... T. +33 (0)6 02 08 45 49 |
[1] See appendix for details of the expected impacts of SPRING
2 Capacity as of September 30, 2026 vs capacity as of September 30, 2025.
3 The calculation of load factors was reviewed and updated during the period in order to better reflect the actual performance of the portfolio in operation. Load factors are now weighted by the installed capacity of each power plant and by the number of hours during which it was available over the period, which notably makes it possible to take into account commissionings and changes in scope during the year. The 2025 load factors presented for comparison have been restated in line with this new methodology. By way of illustration, before restatement, the solar load factor in Brazil for the first nine months of 2025 was 23%.
4 Electric vehicle charging operator.
5 Today's announcement.
6 Press release dated 13 October 2026.
7 Section: Operational and Financial Objectives, from the press release on the 2026 half-year results, September 3, 2026.
Attachment
-
Turnover of 177 million euros in the third quarter

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment