| Nominal Pipe Size (NPS) | Outside Diameter (OD) - mm | SCH 10 Wall Thickness (mm) | SCH 10 Weight (kg/m) | SCH 40 Wall Thickness (mm) | SCH 40 Weight (kg/m) | Standard Rated Working Pressure |
|---|---|---|---|---|---|---|
| NPS 1 (DN 25) | 33.4 mm (1.315 in.) | 2.77 mm | 2.09 kg/m | 3.38 mm | 2.50 kg/m | 300 PSI (2.07 MPa) |
| NPS 1-1/4 (DN 32) | 42.2 mm (1.660 in.) | 2.77 mm | 2.69 kg/m | 3.56 mm | 3.39 kg/m | 300 PSI (2.07 MPa) |
| NPS 1-1/2 (DN 40) | 48.3 mm (1.900 in.) | 2.77 mm | 3.11 kg/m | 3.68 mm | 4.05 kg/m | 300 PSI (2.07 MPa) |
| NPS 2 (DN 50) | 60.3 mm (2.375 in.) | 2.77 mm | 3.93 kg/m | 3.91 mm | 5.44 kg/m | 300 PSI (2.07 MPa) |
| NPS 2-1/2 (DN 65) | 73.0 mm (2.875 in.) | 3.05 mm | 5.26 kg/m | 5.16 mm | 8.63 kg/m | 300 PSI (2.07 MPa) |
| NPS 3 (DN 80) | 88.9 mm (3.500 in.) | 3.05 mm | 6.46 kg/m | 5.49 mm | 11.29 kg/m | 300 PSI (2.07 MPa) |
| NPS 4 (DN 100) | 114.3 mm (4.500 in.) | 3.05 mm | 8.37 kg/m | 6.02 mm | 16.07 kg/m | 300 PSI (2.07 MPa) |
| NPS 6 (DN 150) | 168.3 mm (6.625 in.) | 3.40 mm | 13.83 kg/m | 7.11 mm | 28.26 kg/m | 300 PSI (2.07 MPa) |
| NPS 8 (DN 200) | 219.1 mm (8.625 in.) | 4.78 mm | 25.26 kg/m | 8.18 mm | 42.55 kg/m | 300 PSI (2.07 MPa) |
Hydraulic Flow Advantage: Schedule 10 vs Schedule 40
Because Schedule 10 UL pipe features a thinner wall than Schedule 40, its internal cross-sectional area (inside diameter) is substantially larger for the same outer nominal size. Under the Hazen-Williams hydraulic flow formula, this increased bore minimizes water friction losses, allowing contractors to downsize piping diameters or use smaller fire booster pumps while maintaining required sprinkler discharge density at remote heads.
Joining Methods and End Finishes: Roll Grooved vs Threaded UL Pipe
The selection of pipe end preparation dictates field installation speed, seismic flexibility, and total project labor costs:
Roll-Grooved Mechanical Joint Systems
Roll grooving is the dominant joining technique for Schedule 10 and Schedule 40 UL pipe (sizes NPS 1-1/4 through NPS 12). A cold-forming roller tool displaces the pipe wall radially inward to create a smooth circumferential groove without removing base metal. Flexible or rigid grooved mechanical couplings clamp around the groove, housing a synthetic EPDM rubber gasket.
-
Engineering Benefits: Roll-grooved joints accommodate seismic deflection, thermal expansion, and vibration dampening, while slashing installation time by up to 70% compared to manual field welding.
Threaded and Coupled Systems (T&C)
Threaded connections are governed by ANSI/ASME B1.20.1 (NPT threads) and are strictly restricted to Schedule 40 or heavier pipe. Slicing threads into thin-wall Schedule 10 pipe removes critical base metal, weakening the pipe wall and creating catastrophic bursting hazards under pressure surges. Threaded UL pipes are primarily specified for small-bore branch drops (NPS 1/2 to NPS 1) connecting directly to ceiling sprinkler heads.
Corrosion Protection and Surface Finishes for UL Fire Sprinkler Piping
Corrosion within fire protection piping can cause pinhole leaks or create rust particulates that block sprinkler discharge orifices:
Red Primer and Polyester Powder Coating
For climate-controlled indoor wet sprinkler systems, carbon steel pipe is cleaned via shot-blasting to remove mill scale and finished with an exterior coat of red alkyd rust-inhibitive primer, epoxy, or electrostatically applied polyester powder coating (standard safety red color).
Hot-Dip Galvanizing for Outdoor and Dry Pipe Systems
In dry pipe systems, pre-action systems, and outdoor marine docks, compressed air and condensed water create high-risk environments for Microbiologically Influenced Corrosion (MIC). NFPA 13 mandates the specification of heavy hot-dip Galvanized Steel Pipe options. Certified ERW Steel Pipe treated with hot-dip zinc (minimum 450 to 550 g/m2) provides dual-action barrier and sacrificial cathodic defense, preventing premature internal scaling.
System Integration with Pressure Piping
Within heavy multi-story industrial buildings, engineering designs pair certified sprinkler lines with structural Carbon Steel Pipe risers or high-temperature Seamless Steel Pipe headers to guarantee structural integrity across mechanical equipment rooms.
UL Pipe Quality Assurance, Testing, and Sourcing Summary
Procuring authentic UL pipe protects commercial building investments and satisfies municipal fire marshal inspection approvals. Every length of certified fire sprinkler pipe must feature continuous longitudinal stencil markings detailing the manufacturer's name, trademark, UL Listed symbol, FM Approved emblem, ASTM standard (e.g., ASTM A795), wall schedule (e.g., SCH 10 or SCH 40), and specific production heat number.
Every order supplied by Cortec Steel is backed by complete EN 10204 3.1 Mill Test Certificates (MTCs). These records verify ladle chemical limits, tensile and yield strength properties, 100% inline eddy current or hydrostatic testing (tested at pressures exceeding 5 times the rated working pressure), and strict roll-groove dimensional compliance. For certified UL/FM fire sprinkler pipe inventories, custom cut-and-grooved lengths, and global export distribution, contact the technical engineering desk at Cortec Steel today.
About us
A leading global provider of pipeline solutions, with operations in over 30 countries, successfully delivering landmark petrochemical, offshore, and renewable energy projects across multiple nations. Offering flexible pipeline with diameters ranging from 21.3mm to 3,000mm. Third-party audits achieve zero non-conformities, with a 98% on-time delivery rate, and significantly reduce customer project risks and costs by 15-25%.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.

Comments
No comment