Questcorp Defines Near-Surface Gold Discovery Corridor At Union Norte Expanding District-Scale Potential At La Union
| | From (m) | To (m) | Width (m) | AuEq (g/t) | Au_ppm | Ag_ppm | Cu_ppm | Pb % | Zn % |
| UND26-015 | 1.00 | 15.60 | 14.60 | 0.45 | 0.19 | 10.21 | 96.61 | 0.08 | 0.17 |
| including | 8.00 | 13.60 | 5.60 | 0.96 | 0.48 | 12.86 | 209.88 | 0.21 | 0.44 |
| including | 8.00 | 12.60 | 4.60 | 1.09 | 0.56 | 14.13 | 211.80 | 0.26 | 0.53 |
| including | 9.60 | 12.60 | 3.00 | 1.10 | 0.30 | 20.60 | 324.50 | 0.40 | 0.81 |
| UND26-014 | 1.90 | 11.00 | 9.10 | 0.76 | 0.34 | 9.25 | 74.35 | 0.11 | 0.53 |
| including | 1.90 | 2.60 | 0.70 | 1.97 | 0.30 | 25.57 | 541.74 | 1.00 | 6.67 |
| including | 4.50 | 11.00 | 6.50 | 0.84 | 0.44 | 2.85 | 57.29 | 0.11 | 0.72 |
| including | 6.50 | 11.00 | 4.50 | 1.18 | 0.63 | 4.51 | 75.21 | 0.15 | 1.03 |
| including | 9.50 | 11.00 | 1.50 | 3.38 | 1.81 | 27.33 | 216.38 | 0.43 | 3.03 |
Union Mine Target
UND26-013 was collared to test the southward extension of the historic Sproul manto, a previously mined replacement body. The hole intersected the interpreted replacement horizon south of the known artisanal workings and returned anomalous Pb (>36 ppm) and Zn (0.1-0.7%), supporting proximity to the CRD system (Figure 3). Follow-up drilling is planned to test the interpreted main feeder structure at greater depth beneath Union Mine, where previous underground sampling returned 20.2 g/t Au, 226 g/t Ag and 2.7% Zn over a 30 m channel (see news release dated January 22, 2026). Further drilling will also evaluate IP features and geological targets developed through the 2026 exploration program.
Figure 3: Drill Section (30 m thickness) through the Union Mine Target (looking north); section line B-B' Figure 1.
To view an enhanced version of this graphic, please visit:
Additional Phase 2A Targets
Jabali: UND26-017 was drilled southward toward the Jabali target and improved the Company's understanding of structural controls in the area. Elevated arsenic values of approximately 10-80 ppm (Figure 4) indicate proximity to a potential feeder zone similar to structures observed at Union Norte and Union Mine. These results, together with an IP chargeability response, provide additional vectors for follow-up drilling.
Luis Hill: IP surveying delineated a strong chargeability anomaly extending for more than 1 km along strike and to approximately 300 m depth. The anomaly coincides with sediment-hosted gold mineralization identified during Phase 1 and remains open along strike and at depth, materially expanding the exploration footprint. UND26-018 was collared above the anomaly but was terminated before reaching its planned 150 m target depth because of drilling complications. As a result, the principal IP target has not yet been adequately tested. Follow-up drilling is planned at both Luis Hill and Jabali.
Figure 4: Drill Section (30 m thickness) through the Jabali Mine (looking northwest); section line C-C' Figure 1.
To view an enhanced version of this graphic, please visit:
Seven holes totaling 530.1 metres were completed during Phase 2A. Significant faulting within the targeted formations slowed core drilling and limited progress in several holes. To improve drilling efficiency in these ground conditions, the Company is actively evaluating a reverse-circulation contractor for Phase 2B. The change in drilling method is intended to increase penetration rates and improve access to priority targets while preserving the option to use diamond core where detailed geological information is required.
Table 2: Drill Collar Information for Drill Holes
| Hole ID | East | North | Elev (m) | Azimuth (°) | Dip (°) | Depth (m) | Drilling Program |
| UND26-013 | 376137 | 3347087 | 364 | 55 | -75 | 76.8 | Union Mine |
| UND26-014 | 376169 | 3347610 | 400 | 30 | -70 | 63.5 | Union Norte |
| UND26-015 | 376169 | 3347610 | 400 | 320 | -70 | 69.6 | Union Norte |
| UND26-016 | 376112 | 3347670 | 388 | 160 | -75 | 106 | Union Norte |
| UND26-017 | 375593 | 3346327 | 367 | 190 | -45 | 109.2 | Jabalí |
| UND26-018 | 375188 | 3347547 | 410 | 0 | -90 | 70 | Luis Hill |
| UND26-019 | 375659 | 3347820 | 384 | 30 | -70 | 35 | El Cobre |
Next Steps - Phase 2B
Phase 2A achieved its principal objective of refining the geological model and establishing clear follow-up targets. The fully funded Phase 2 program is planned to resume later in September following the rainy season. Phase 2B will prioritize: (i) step-out and down-dip drilling along the confirmed mineralized feeder structure at Union Norte; (ii) deeper drilling beneath Union Mine toward the interpreted feeder and sulfide targets; (iii) a more complete test of the large Luis Hill IP anomaly; and (iv) follow-up of Jabali and other emerging targets defined by geochemistry, mapping and geophysics. The Company expects the next phase to provide a more definitive test of the scale and continuity of the mineralized systems identified to date. Questcorp intends to report assay results as they are received and to maintain a disciplined approach to expenditure sequencing, committing capital to step-out and depth testing only where prior results support it. Management's near-term objective is to convert the current target inventory into one or more zones of sufficient continuity and grade to warrant systematic delineation.
General Overview of the La Union Project
Historical mining by Peñoles targeted chimney- and manto-style replacement bodies within the upper oxide zones at Union Mine and Union Norte. The presence of these historic workings, together with the structural, geochemical and geophysical data generated by recent exploration, provides a strong framework for targeting both extensions of known mineralization and previously untested sulfide zones at depth.
The Project is underlain by favorable carbonate host rocks, an extensive alteration footprint and numerous historical workings. The mineralization style shares geological characteristics with carbonate replacement systems elsewhere in northern Mexico and the southwestern United States, including the Hermosa district in Arizona. These analogues are referenced for geological context only and are not necessarily indicative of the mineralization or economic potential of the Union Project.
Questcorp, through its project operator Riverside, continues to advance a district-scale exploration model that integrates CRD-style gold-silver-zinc mineralization, structural feeder zones and sediment-hosted gold targets. Near-term work is focused on systematically testing the highest-priority targets generated by Phase 2A and the 2026 geophysical and geological programs. Questcorp holds an option to acquire an undivided 100-per-cent interest in the La Union project, subject to a royalty obligation, and accordingly retains full exposure to exploration success delivered by the program.
Interested investors are invited to review the Union Project Technical Report, which can be found under Questcorp's profile on SEDAR+.
Qualified Person & QA/QC
The technical content of this news release has been reviewed and approved by R. Tim Henneberry, P. Geo (BC), a Director of the Company and a Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
All drill core samples were sawn in half, labeled, and bagged on site. The remaining half-core was retained and securely stored. Numbered security tags were applied to all sample shipments to ensure chain of custody. Samples were submitted to SGS's analytical facility in Hermosillo, Sonora, Mexico, for sample preparation and analysis. SGS is independent of the Company.
Analytical methods include fire assay for gold, gravimetric finish for high-grade silver, multi-element ICP digestion, and high-range fusion-ICP for over-limit concentrations.
The Company's QAQC program includes certified reference materials (CRMs), field blanks, and field duplicates inserted at regular intervals throughout each sample batch. CRM performance has had no failures yet identified and is evaluated using a Z-score criterion, where Z = (observed − certified value) / standard deviation, with acceptance thresholds of PASS (|Z| ≤ 2), WARNING (2 < |Z| ≤ 3), and FAIL (|Z| > 3). Field duplicate precision is assessed using relative percent difference (RPD), with PASS ≤ 20%, WARNING > 20-30%, and FAIL > 30%. Blanks are evaluated against the gold detection limit, with any result above that threshold flagged for investigation. Results below detection limits are retained as reported and excluded from RPD calculations. No QAQC failures have been found in the batches associated with the results reported herein.
About Questcorp Mining Inc.
Questcorp is engaged in the business of the acquisition and exploration of mineral properties in North America, with the objective of locating and developing economic precious and base metal properties of merit. The Company holds an option to acquire an undivided 100-per-cent interest in and to mineral claims totalling 1,168.09 hectares comprising the North Island Copper property, on Vancouver Island, B.C., subject to a royalty obligation. The Company also holds an option to acquire an undivided 100-per-cent interest in and to mineral claims totalling 2,520.2 hectares comprising the La Union project located in Sonora, Mexico, subject to a royalty obligation.
ON BEHALF OF THE BOARD OF DIRECTORS,
Saf Dhillon
President & CEO
Questcorp Mining Inc.
...
Tel. (604-484-3031)
Suite 550, 800 West Pender Street
Vancouver, British Columbia
V6C 2V6
This news release contains certain forward-looking statements and forward-looking information under applicable Canadian securities legislation (collectively, "forward-looking statements"). Forward-looking statements include, but are not limited to, statements regarding the timing and scope of Phase 2B drilling; the planned use of reverse-circulation drilling; proposed follow-up drilling at Union Mine, Union Norte, Luis Hill, Jabali and other targets; interpretations of geophysical, geochemical and geological data; the potential continuity, scale and style of mineralization; and the Company's exploration plans and objectives. Forward-looking statements are based on management's current expectations, estimates and assumptions and are subject to known and unknown risks, uncertainties and other factors that may cause actual results or future events to differ materially from those expressed or implied. Such factors include, among others, exploration and drilling risks, geological uncertainty, equipment and contractor availability, weather and access conditions, permitting and regulatory matters, capital market conditions and the availability of financing. There can be no assurance that forward-looking statements will prove to be accurate. Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update or revise forward-looking statements except as required by applicable law.
Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.
To view the source version of this press release, please visit
Source: Questcorp Mining Inc.
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.






Comments
No comment