Brixton Metals Drills 6,199 G/T Silver Over 1.00 M Including 0.50 M Of 12,386 G/T Silver In Hole 432 At Its Langis Project In Ontario
| Hole ID | From (m) | To (m) | Length (m) | Ag (g/t) |
| LM-26-371 | 230.00 | 237.00 | 7.00 | 108.13 |
| including | 235.00 | 236.00 | 1.00 | 693.00 |
| LM-26-375 | 172.00 | 191.00 | 19.00 | 78.90 |
| including | 182.00 | 187.00 | 5.00 | 262.28 |
| LM-26-379 | 153.00 | 163.90 | 10.90 | 32.87 |
| including | 154.85 | 157.00 | 2.15 | 122.49 |
| LM-26-385 | 174.00 | 195.65 | 21.65 | 35.61 |
| including | 176.00 | 177.00 | 1.00 | 153.00 |
| including | 180.00 | 180.50 | 0.50 | 99.00 |
| including | 183.30 | 185.00 | 1.70 | 57.60 |
| including | 186.10 | 187.60 | 1.50 | 96.00 |
| 217.80 | 229.90 | 12.10 | 80.14 | |
| including | 222.00 | 224.00 | 2.00 | 50.80 |
| including | 228.00 | 229.90 | 1.90 | 410.00 |
| LM-26-393 | 162.00 | 179.00 | 17.00 | 51.13 |
| including | 167.00 | 169.00 | 2.00 | 332.00 |
| LM-26-395 | 166.00 | 168.00 | 2.00 | 77.60 |
| 184.00 | 190.00 | 6.00 | 121.02 | |
| including | 186.00 | 187.42 | 1.42 | 374.00 |
| including | 188.00 | 190.00 | 2.00 | 83.00 |
| 205.00 | 208.00 | 3.00 | 73.68 | |
| including | 205.00 | 206.80 | 1.80 | 117.00 |
| 226.00 | 228.00 | 2.00 | 603.00 | |
| LM-26-399 | 208.00 | 249.00 | 41.00 | 79.22 |
| including | 211.00 | 212.00 | 1.00 | 106.00 |
| including | 213.35 | 217.95 | 4.60 | 502.63 |
| including | 241.10 | 249.00 | 7.90 | 94.73 |
| and including | 243.15 | 243.70 | 0.55 | 1,085.00 |
| LM-26-403 | 225.00 | 227.00 | 2.00 | 80.00 |
| LM-26-407 | 251.00 | 258.25 | 7.25 | 122.64 |
| including | 251.00 | 253.00 | 2.00 | 410.00 |
Note for all assay tables: All assay values are weighted averages. Reported intervals are drilling lengths, and the true widths of the mineralized intervals have not yet been determined. Reported intervals are length-weighted composites calculated at a 5 g/t Ag cut-off over contiguous samples, with limited internal dilution. A hole is reported as a significant intercept only where it contains a sub-interval exceeding 50 g/t Ag; otherwise, it is reported as no significant intercepts. Higher-grade "including" intervals reflect geological interpretation.
Table 2. Selected assay intervals from drill holes in the Shaft 6 West Area (S6-W).
| Hole ID | From (m) | To (m) | Length (m) | Ag (g/t) |
| LM-26-398 | 114.00 | 116.00 | 2.00 | 309.00 |
| LM-26-401 | 111.00 | 113.00 | 2.00 | 447.06 |
| including | 111.00 | 111.50 | 0.50 | 1,735.00 |
| LM-26-402 | 109.00 | 110.00 | 1.00 | 65.50 |
Table 3. Selected assay intervals from drill holes in the Shaft 6, Shaft 6 North and Shaft 6 South areas.
| Hole ID | From (m) | To (m) | Length (m) | Ag (g/t) |
| LM-26-382 | 131.00 | 131.90 | 0.90 | 710.00 |
| LM-26-394 | 122.00 | 124.00 | 2.00 | 236.00 |
| 132.00 | 143.00 | 11.00 | 6.81 | |
| including | 141.50 | 142.00 | 0.50 | 55.40 |
| LM-26-408 | 123.00 | 130.00 | 7.00 | 290.34 |
| including | 126.00 | 128.00 | 2.00 | 957.50 |
| and including | 126.00 | 127.00 | 1.00 | 1,480.00 |
| LM-26-432 | 116.05 | 117.05 | 1.00 | 6,198.9 |
| including | 116.05 | 116.55 | 0.50 | 12,386.0 |
The following holes are reported as no significant intercepts: LM-26-374, 378, 381, 383, 384, 386, 387, 388, 390, 391, 392, 396, 400, 404, 405 and 406.
Figure 6. Map showing drill results from the Langis Shaft 6 area, highlights from the 2026 campaign to date.
Table 4. Drill hole collar information for reported holes.
| Hole ID | Pad ID | Easting (m) | Northing (m) | Elevation (m) | Azimuth | Dip | Depth (m) | Zone | |
| LM-26-371 | LM-2026-022 | 607600 | 5270850 | 220.9 | 90 | -60 | 249.00 | S6-SE | |
| LM-26-374 | LM-2026-009 | 607280 | 5271020 | 215.7 | 130 | -58 | 219.00 | S6-N | |
| LM-26-375 | LM-2026-062 | 607500 | 5270780 | 217.3 | 90 | -55 | 249.00 | S6-SE | |
| LM-26-378 | LM-2026-008 | 607180 | 5271020 | 207.1 | 90 | -60 | 201.00 | S6-N | |
| LM-26-379 | LM-2026-062 | 607500 | 5270780 | 217.3 | 85 | -60 | 252.00 | S6-SE | |
| LM-26-381 | LM-2026-062 | 607500 | 5270780 | 217.3 | 95 | -60 | 249.00 | S6-SE | |
| LM-26-382 | LM-2026-008 | 607180 | 5271020 | 207.1 | 160 | -55 | 202.00 | S6-N | |
| LM-26-383 | LM-2026-062 | 607500 | 5270780 | 217.3 | 95 | -50 | 246.00 | S6-SE | |
| LM-26-384 | LM-2026-008 | 607180 | 5271020 | 207.1 | 270 | -55 | 201.00 | S6-N | |
| LM-26-385 | LM-2026-063 | 607510 | 5270760 | 216.9 | 90 | -55 | 300.00 | S6-SE | |
| LM-26-386 | LM-2026-008 | 607180 | 5271020 | 207.1 | 20 | -60 | 201.00 | S6-N | |
| LM-26-387 | LM-2026-063 | 607510 | 5270760 | 216.9 | 90 | -60 | 300.00 | S6-SE | |
| LM-26-388 | LM-2026-008 | 607180 | 5271020 | 207.1 | 20 | -50 | 219.00 | S6-N | |
| LM-26-389 | LM-2026-063 | 607510 | 5270760 | 216.9 | 95 | -55 | 261.00 | S6-SE | |
| LM-26-390 | LM-2026-020 | 607330 | 5271060 | 217.0 | 90 | -50 | 210.00 | S6-N | |
| LM-26-391 | LM-2026-063 | 607510 | 5270760 | 216.9 | 250 | -60 | 204.00 | S6-S | |
| LM-26-392 | LM-2026-020 | 607330 | 5271060 | 217.0 | 225 | -50 | 210.00 | S6-N | |
| LM-26-393 | LM-2026-063 | 607510 | 5270760 | 216.9 | 85 | -57 | 198.00 | S6-SE | |
| LM-26-394 | LM-2026-079 | 607324 | 5270862 | 215.0 | 90 | -58 | 201.00 | S6 | |
| LM-26-395 | LM-2026-070 | 607531 | 5270764 | 217.1 | 80 | -55 | 300.00 | S6-SE | |
| LM-26-396 | LM-2026-025 | 607324 | 5270862 | 213.2 | 90 | -60 | 216.00 | S6 | |
| LM-26-398 | LM-2026-082 | 607077 | 5270856 | 209.8 | 275 | -55 | 201.00 | S6-W | |
| LM-26-399 | LM-2026-082 | 607540 | 5270746 | 216.8 | 80 | -50 | 300.00 | S6-SE | |
| LM-26-400 | LM-2026-082 | 607077 | 5270856 | 209.8 | 275 | -60 | 123.00 | S6-W | |
| LM-26-401 | LM-2026-082 | 607077 | 5270856 | 209.8 | 290 | -45 | 180.00 | S6-W | |
| LM-26-402 | LM-2026-082 | 607077 | 5270856 | 209.8 | 275 | -45 | 219.00 | S6-W | |
| LM-26-403 | LM-2026-071 | 607541 | 5270746 | 216.9 | 80 | -55 | 300.00 | S6-SE | |
| LM-26-404 | LM-2026-082 | 607077 | 5270856 | 209.8 | 290 | -55 | 116.00 | S6-W | |
| LM-26-405 | LM-2026-039 | 607210 | 5270820 | 212.0 | 300 | -55 | 213.00 | S6 | |
| LM-26-406 | LM-2026-082 | 607077 | 5270856 | 209.8 | 290 | -60 | 165.00 | S6-W | |
| LM-26-407 | LM-2026-071 | 607541 | 5270746 | 216.9 | 80 | -45 | 321.00 | S6-SE | |
| LM-26-408 | LM-2026-039 | 607210 | 5270820 | 212.0 | 300 | -50 | 198.00 | S6 | |
| LM-26-432 | LM-2026-102 | 607433 | 5270886 | 218.8 | 230 | -66 | 199.00 | S6 | |
About the Langis Project
An Exploration Target of 1.0 to 2.0 million tonnes grading 400 to 800 g/t silver has been conceptualized for the project. Note: The potential quantity and grade of the Exploration Target are conceptual. Insufficient exploration has been completed to define a mineral resource, and there is no certainty that further exploration will result in the target being delineated as a mineral resource.
The wholly owned Langis Silver Project, located approximately 500 km north of Toronto, Ontario, Canada, includes a former producing mine and benefits from excellent infrastructure, including all-season road access, power, rail connections, and a refiner. Silver mineralization occurs as native silver and in steeply to moderately dipping veins, veinlets, disseminations, rosettes, and fracture infill, often associated with minerals such as calcite, hematite, pyrite, cobaltite, chalcopyrite, niccolite, and gold. Mineralization is hosted across three principal rock types: Archean Keewatin volcanic and metasedimentary rocks, Proterozoic Coleman Member sedimentary rocks of the Huronian Supergroup, and Proterozoic Nipissing diabase. The geological deposit model for the area is a continental-rift extensional depositional environment. The Langis Mine produced 10.4 million ounces of silver intermittently between 1908 and 1989 at a head grade of 20 to 25 opt, with reported recoveries of 88% to 98%. Previous operators developed over 10 km of underground workings; however, shafts and openings have been capped and sealed. Historically, reported silver mines in the Cobalt Camp have collectively produced over 445 million ounces of silver. We also understand, through personal communication with mine workers in the camp, that ultra-high-grade native silver collector pieces did not make it through the mills, suggesting that the camp's actual silver production is significantly higher than the reported numbers. The historic production figures referenced above are sourced from third-party records and personal communications, have not been verified by Brixton or by the Qualified Person, and should not be relied upon.
Quality Assurance & Quality Control
Quality assurance and quality control protocols for drill core sampling were developed by Brixton. Core samples were mostly taken at 2.0 m intervals. High-grade intervals were taken at 0.50 m to 1.00 m intervals. Blanks, duplicates (lab pulp), and certified reference materials were inserted at a combined rate of up to 15%. Core samples were cut in half, bagged, zip-tied, and sent directly to the ALS Minerals preparation facility in Sudbury, Ontario. ALS Minerals Laboratories is registered to ISO 9001:2015 and ISO 17025 accreditations for laboratory procedures. Samples were analyzed at ALS Laboratory Facilities in North Vancouver, British Columbia, for gold by fire assay with an atomic absorption finish. Ag, Pb, Cu, and Zn, as well as 48 additional elements, were analyzed using a four-acid digestion with an ICP-MS finish. Overlimit silver samples were analyzed using fire assay and gravimetric finish, and/or fire assay and gravimetric finish on concentrates. The certified reference materials were acquired from CDN Resource Laboratories Ltd. of Langley, British Columbia, and the standards inserted varied with the type and abundance of mineralization observed in the primary sample. Blank material used consisted of non-mineralized siliceous landscaping rock. A copy of the QAQC protocols is available on the Company's website.
Qualified Person (QP)
Mr. Gary Thompson, P.Geo., is the Chairman and CEO and a senior geologist for the Company who is a Qualified Person as defined by National Instrument 43-101. Mr. Thompson has verified the referenced data and analytical results disclosed in this press release and has approved the technical information presented herein.
About Brixton Metals Corporation
Brixton Metals is a Canadian exploration company focused on the advancement of its mining projects. Brixton wholly owns four exploration projects: Thorn copper-gold-silver-molybdenum Project in NW British Columbia, the Hog Heaven copper-gold-silver Project in NW Montana, USA, which is optioned to Ivanhoe Electric Inc., the Langis and Hudson Bay silver Projects in Ontario and the Atlin Goldfields Project located in northwest BC, which is optioned to Eldorado Gold Corporation. Brixton Metals Corporation shares trade on the TSX-V under the ticker symbol BBB, and on the OTCQX under the ticker symbol BBBXF. For more information about Brixton, please visit our website at .
On Behalf of the Board of Directors
Mr. Gary R. Thompson, Chairman and CEO
...
For Investor Relations inquiries please contact: Mr. Michael Rapsch, Vice President Investor Relations. email: ... or call Tel: 604-630-9707
Follow us on:
LinkedIn | Twitter/X | Facebook | Instagram
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Information set forth in this news release may involve forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as“anticipate”,“believe”,“plan”,“estimate”,“expect”, and“intend”, statements that an action or event“may”,“might”,“could”,“should”, or“will” be taken or occur, including statements that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans, or other similar expressions. All statements, other than statements of historical fact included herein including, without limitation, statements regarding the use of proceeds. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; and the additional risks identified in the annual information form of the Company or other reports and filings with the TSXV and applicable Canadian securities regulators. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements.
Weblinks:

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.







Comments
No comment