Swiss Power Providers Show Little Appetite For Building Nuclear Plants
-
Italiano
it
Aziende elettriche, scarsa voglia di costruire centrali nucleari
Original
Read more: Aziende elettriche, scarsa voglia di costruire centrali nuc
A new nuclear power station is not a realistic prospect in the short to medium term, BKW has stated in response to an enquiry from the AWP news agency.“The conditions for a new nuclear power station do not currently exist for economic reasons and given the lack of stable public acceptance.” Therefore, for BKW,“building a new plant is out of the question”.
In the nuclear sector, the company is focusing on ensuring the long-term operation of the facilities at Leibstadt and Gösgen.“Thanks to the safe operation of these two plants, Switzerland will have sufficient time to further develop renewable energy production and ensure long-term security of supply, even in winter,” BKW added.
More More Emissions reduction Why climate change and wars are reviving interest in nuclear energyThis content was published on Jul 17, 2025 Is the Fukushima effect over? Here's why there is renewed interest around the atom and which nations want to build new nuclear power plants.
Read more: Why climate change and wars are reviving interest in nuclear e
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.

Comments
No comment