High Grade Gold From Maiden Drilling At Nanoq
| Hole ID | X | Y | Z | Azimuth | Dip | Total Depth (m) |
| NAN2401 | 597909 | 6774507 | 432.3 | 140 | -45 | 51.1 |
| NAN2402 | 597909 | 6774507 | 432.3 | 130 | -67 | 82 |
Table 2: Significant Intersection
| Hole ID | From (m) | To (m) | Interval (m) | True Thickness (m)# | Au (g/t) |
| NAN2401 | 8 | 9.5 | 1.5 | 1.30 | 18.10 |
| Including | 0.5 | 0.43 | 44.20 | ||
| NAN2401 | 33.7 | 36.9 | 3.2 | 3.01 | 19.51 |
| Including | 0.5 | 0.47 | 123.00 | ||
| NAN2402* | 12.55 | 14.75 | 2.2 | 1.10 | 4.61 |
| Including | 1.1 | 0.55 | 7.23 | ||
| NAN2402* | 21.3 | 24.32 | 3.02 | 1.51 | 1.87 |
*provisional results; still under review – awaiting some re-assay results
# True thickness estimated to be 50-95% of apparent thickness
Assay results further provide evidence that the mineralisation is clean with very low arsenic and other deleterious elements.
Future Plans
With these encouraging results, Amaroq is preparing for a comprehensive 2025 drilling program to further evaluate Nanoq's potential and work towards delineating a Mineral Resource. The Company is also exploring the feasibility of bulk sampling and processing at the Nalunaq facility in 2026/27, which could offer additional insight into Nanoq's high-grade potential and economic viability.
Sampling and QAQC Disclosure
Drill core was cut in half using a diamond blade core saw. Cut lines were consistently drawn along the core foliation axis and the right-hand side of the core was sampled. All drill core samples were placed into thick polymer bags with a sample ticket. All samples were prepared at ALS Geochemistry's containerised preparation laboratory on-site at Nalunaq, before being packaged and sent to an accredited laboratory, ALS Geochemistry, Loughrea, Ireland, for analysis.
Sample preparation scheme PREP-31BY was used on all samples. This involves crushing to 70% under 2 mm, rotary split off 1 kg, and pulverizing the split to better than 85% passing 75 microns. Samples were then analysed by 50 g fire assay with method Au-AA26 which has a detection limit of 0.01 ppm Au. Samples containing visible gold and samples considered to be the Main Vein were assayed with screen-metallics fire assay technique Au-SCR24 which has a detection limit of 0.05 ppm Au. This involves screening 1 kg of pulverised sample to 106 microns followed by a gravimetric assay of the entire plus fraction and a duplicate 50 g AAS assay of the minus fraction.
Amaroq's QA/QC program consists of the systematic insertion of certified reference materials of known gold content, blanks, and quarter core field duplicates at a rate of 1 in 20 or 5% per QA/QC type. In addition, ALS insert blanks and standards into the analytical process.
Enquiries:
Amaroq Minerals Ltd.
Eldur Olafsson, Executive Director and CEO
...
Eddie Wyvill, Corporate Development
+44 (0)7713 126727
...
Panmure Liberum Limited (Nominated Adviser and Corporate Broker)
Scott Mathieson
Nikhil Varghese
Kieron Hodgson
+44 (0) 20 7886 2500
Canaccord Genuity Limited (Corporate Broker)
James Asensio
Harry Rees
Tel: +44 (0) 20 7523 8000
Camarco (Financial PR)
Billy Clegg
Elfie Kent
Fergus Young
+44 (0) 20 3757 4980
For Corporation updates:
Follow @Amaroq_Minerals on X (Formerly known as Twitter)
Follow Amaroq Minerals Ltd. on LinkedIn
Further Information:
About Amaroq Minerals
Amaroq Minerals' principal business objectives are the identification, acquisition, exploration, and development of gold and strategic metal properties in South Greenland. The Company's principal asset is a 100% interest in the past producing Nalunaq Gold mine which is due to go into production towards the end of 2024. The Company has a portfolio of gold and strategic metal assets in Southern Greenland covering the two known gold belts in the region as well as advanced exploration projects at Stendalen and the Sava Copper Belt exploring for Strategic metals such as Copper, Nickel, Rare Earths and other minerals. Amaroq Minerals is continued under the Business Corporations Act (Ontario) and wholly owns Nalunaq A/S, incorporated under the Greenland Public Companies Act.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Information
This press release contains forward-looking information within the meaning of applicable securities legislation, which reflects the Corporation's current expectations regarding future events and the future growth of the Corporation's business. In this press release there is forward-looking information based on a number of assumptions and subject to a number of risks and uncertainties, many of which are beyond the Corporation's control, that could cause actual results and events to differ materially from those that are disclosed in or implied by such forward-looking information. Such risks and uncertainties include but are not limited to the factors discussed under "Risk Factors" in the Final Prospectus available under the Corporation's profile on SEDAR at Any forward-looking information included in this press release is based only on information currently available to the Corporation and speaks only as of the date on which it is made. Except as required by applicable securities laws, the Corporation assumes no obligation to update or revise any forward-looking information to reflect new circumstances or events. No securities regulatory authority has either approved or disapproved of the contents of this press release. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Inside Information
This announcement contains inside information for the purposes of Article 7 of the UK version of Regulation (EU) No. 596/2014 on Market Abuse ("UK MAR"), as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018, and Regulation (EU) No. 596/2014 on Market Abuse ("EU MAR").
Qualified Person Statement
The technical information presented in this press release has been approved by James Gilbertson CGeol, VP Exploration for Amaroq Minerals and a Chartered Geologist with the Geological Society of London, and as such a Qualified Person as defined by NI 43-101.

Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept
any responsibility or liability for the accuracy, content, images,
videos, licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright
issues related to this article, kindly contact the provider above.

Comments
No comment