An infill resource drilling program consisting of 130 holes for 13,600 metres was completed during the dry season between May and November 2012. Drilling focused on the Bastnaesite Zone, mineralogically the most favourable area of the greater Ngualla deposit and identified for initial production.
The drilling supported a revised Mineral Resource estimate that was completed in April 2013. The weathered Bastnaesite Zone is now a high confidence, well defined Mineral Resource with 86% in the highest 'Measured' JORC category
Test work was successfully completed to develop and demonstrate a simple metallurgical process for Ngualla's weathered bastnaesite mineralisation. A proven three stage process of beneficiation, sulphuric acid leach and solvent extraction enables a simple, low cost, low risk operation and differentiates Ngualla from other projects.
A Scoping Study and preliminary economic assessment was completed in December 2012 and subsequently revised in May 2013 to include the new Mineral Resource and further efficiencies achieved in the metallurgical process.
To view the annual report, please visit:
http://media.abnnewswire.net/media/en/docs/ASX-PEK-657181.pdf

An infill resource drilling program consisting of 130 holes for 13,600 metres was completed during the dry season between May and November 2012. Drilling focused on the Bastnaesite Zone, mineralogically the most favourable area of the greater Ngualla deposit and identified for initial production.
The drilling supported a revised Mineral Resource estimate that was completed in April 2013. The weathered Bastnaesite Zone is now a high confidence, well defined Mineral Resource with 86% in the highest 'Measured' JORC category
Test work was successfully completed to develop and demonstrate a simple metallurgical process for Ngualla's weathered bastnaesite mineralisation. A proven three stage process of beneficiation, sulphuric acid leach and solvent extraction enables a simple, low cost, low risk operation and differentiates Ngualla from other projects.
A Scoping Study and preliminary economic assessment was completed in December 2012 and subsequently revised in May 2013 to include the new Mineral Resource and further efficiencies achieved in the metallurgical process.
To view the annual report, please visit:
http://media.abnnewswire.net/media/en/docs/ASX-PEK-657181.pdf
Legal Disclaimer:
MENAFN provides the
information “as is” without warranty of any kind. We do not accept any
responsibility or liability for the accuracy, content, images, videos,
licenses, completeness, legality, or reliability of the information
contained in this article. If you have any complaints or copyright issues
related to this article, kindly contact the provider above.

Comments
No comment