(MENAFN- Trend News Agency) BAKU, Azerbaijan, January 31. The
reconstruction of Azerbaijan's Muganli-Ismayilli-Gabala part of the
Baku-Shamakhi-Muganli-Ismayilli-Gabala highway continues, trend reports via the
State Agency of Azerbaijan Automobile Roads.
The road is of particular importance for the
comfortable movement of the population and is the shortest route
connecting the capital with Ismayilli, Gabala, Oguz, Shaki, Gakh,
Zagatala, and Balakan districts.
According to the agency, as a result of the
reconstruction, the length of the road will be reduced by 9.7
kilometers and will amount to 76.8 kilometers. The existing
two-lane road will be widened to four lanes.
As part of the reconstruction project of the
Muganli-Ismayilli-Gabala road, the first 14-kilometer area of the
road is considered geologically more complex and most susceptible
to landslides. In this regard, retaining walls, drainage systems
with a total length of four kilometers, and other engineering works
are being carried out on four areas of the road.
Will be updated
MENAFN31012023000187011040ID1105501339
Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.