(MENAFN- Trend News Agency)
BAKU, Azerbaijan, May 25. The construction of
Azerbaijan's Fuzuli-Hadrut highway, one of the road infrastructure
projects being implemented in Karabakh and East Zangazur economic
regions, continues at a rapid pace, which will play an important
role in the socio-economic development of these regions, Trend reports citing the
State Agency of Azerbaijan Automobile Roads.
According to a state agency, the length of the road is 12
kilometers. The first technical class road starts from the 'Victory
Road' and will be connected to the new Shukurbeyli-Jabrayil-Hadrut
highway.
The Fuzuli-Hadrut highway will have four lanes. The width of the
roadbed in accordance with the traffic lanes will be 21 meters, and
the width of the carriageway - 14 meters.
Excavation work is currently underway. With the use of special
equipment, work is carried out to widen and profile the road, as
well as build a road and subgrade corresponding to the I technical
class.
The construction of a two-lane road bridge is envisaged on the
6.7 kilometers road, on the site that passes through the territory
of 'Gargabazar'.
Construction work is carried out in accordance with the
requirements of the 'Building Norms and Rules' under the direct
control of the leadership of the State Agency for Highways of
Azerbaijan.
Tags:
- Fuzuli district
- road construction
- Azerbaijan's liberated territories
MENAFN25052022000187011040ID1104270964
Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.