Qatar- Traffic diversion on Al Khor Road for six months


(MENAFN- The Peninsula) QNA

Doha: A traffic diversion will be implemented on a 1km section of Al Khor road for a period of six-months.

The diversion will be after the Woqod Petrol Station for those coming from Doha towards Al Khor and will be in place from Tuesday, December 12, the Public Works Authority (Ashghal) announced.

Traffic on this section of Al Khor Road will be diverted to a newly-constructed temporary road parallel to the closed road, which includes two lanes in each direction.

The diversion aims to allow the construction of the signal-controlled intersection No. 8 on Al Khor Road, which will provide a new route to Al Bayt Stadium.

This traffic diversion is part of a new project to upgrade link roads to Al Bayt Stadium in Al Khor, which includes the construction of 5.3 kilometers of roads, with three lanes in each direction, all leading to four sides of the stadium. These roads will facilitate access to bus stations and car parking around the stadium.

Ashghal will install road signs advising motorists of the diversion, and urged all road users to abide by the new speed limit and follow the road signs to ensure their safety.

MENAFN1112201700630000ID1096218735


Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.